7 C.F.R. § 1924.262

Current through September 30, 2024
Section 1924.262 - Handling complaints involving dwellings constructed by the self-help method

When a borrower whose dwelling was constructed by the self-help method complains about construction defects, Rural Development will determine whether the defect is the result of work performed by a contractor or work performed by the borrower under the guidance of the self-help group. Defects which are determined to be the responsibility of a contractor will be handled in accordance with § 1924.259 of this subpart. Defects determined to be the result of work performed by the borrower are not eligible for compensation under this subpart.

7 C.F.R. §1924.262