Current through September 30, 2024
Section 1730.63 - IDR policy criteria(a)General.(1) The borrower's IDR policy and procedures shall be readily available to the public and include, but not limited to, a standard application, application process, application fees, and agreement.(2) All costs to be recovered from the applicant regarding the application process or the actual interconnection and the process to determine the costs are to be clearly explained to the applicant and authorized by the applicant prior to the borrower incurring these costs. The borrower may require separate non-refundable deposits sufficient to insure serious intent by the applicant prior to proceeding either with the application or actual interconnection process.(3) IDR policies must be approved by the borrower's Board of Directors.(4) The borrower may establish a new rate classification for customers with Distributed Resources.(5) IDR policies should be reconsidered and updated periodically in a manner that is consistent with prudent utility practice.(b)Technical requirements.(1) IDR policies must be consistent with prudent electric utility practice.(2) IDR policies must provide for appropriate electric power system disconnect facilities, as determined by the borrower, which shall include a lockable disconnect and a visible open, that are readily accessible to and operable by authorized personnel at all times.(3) IDR policies must provide for borrower access to the Distributed Resources facility during normal business hours and all emergency situations.(c)Responsible Party obligations. IDR policies must provide for appropriate Responsible Parties to assume the following risks and responsibilities:(1) A Responsible Party must agree to maintain appropriate liability insurance as outlined in the borrower's interconnection policy.(2) A Responsible Party must be responsible for the Distributed Resources compliance with all national, State, local government requirements and electric utility standards for the safety of the public and personnel responsible for utility electric power system operations, maintenance and repair.(3) A Responsible Party must be responsible for the safe and effective operation and maintenance of the facility.(4) Only Responsible Parties may apply for interconnection and the Responsible Party must demonstrate that the facility will be capably developed, constructed and operated, maintained, and repaired.74 FR 32409, July 8, 2009, as amended at 87 FR 73443, Nov. 30, 2022