EXAMPLE Relationship amongst SGR performance measures, SGR definition, and SGR principles:
(a) A tier I provider has a TAM asset inventory containing, in total across all modes, over 150 revenue vehicles in peak revenue service, no rail fixed guideway, multiple passenger and exclusive use maintenance facilities, and various pieces of equipment over $50,000. Their asset inventory is itemized at the level of detail they use in their capital program of projects; it also includes capital assets they do not own but use. The provider conducts condition assessments on those assets in its inventory for which it has direct financial responsibility. The results of the condition assessment indicate that there is an identified unacceptable safety risk in the deteriorated condition of one of their non-revenue service vehicles, but that the non-revenue service vehicles are being used as designed. The condition assessment results show the provider that one non-revenue service vehicle is not in SGR.
(b) The condition assessment results also inform the investment prioritization process, which for this provider is a regression analysis in a spreadsheet software program. The provider's criteria, as well as their weightings, are locally determined to produce the ranked list of programs and projects in their investment prioritization. The provider batches its projects by low, medium or high priority, identifying in which funding year each project will proceed. The provider has elected to use the ULB defaults, provided by FTA, for each of their modes until such time as they have resources and expertise to develop customized ULBs.
(c) The provider separates assets within each asset category by class to determine their current performance measure metric. For example, the equipment listed in its TAM asset inventory includes HVAC equipment and service vehicles; however, the SGR performance metric for the equipment category only requires the non-revenue vehicle metrics. Thus, the provider measures only non-revenue vehicles that exceed the default ULB for the modes they own, operate, or manage. This metric is the baseline the provider uses to determine its target for the forthcoming year.
(d) The provider's equipment baseline, its investment priorities that show minimal funding for non-revenue vehicles over the next 4 years, and its TAM policies, strategies and key asset management activities are used to project its target for the equipment category. Since one of its non-revenue service vehicles indicated an unacceptable safety risk, it is elevated in the investment prioritization for maintenance or replacement. The provider's target may indicate a decline in the condition of their equipment overall, but it addresses the unacceptable safety risk as an immediate priority.
(e) The cyclic nature of investment prioritization and SGR performance target setting requires the provider to go through the process more than once to settle on the balance of priorities and targets that best reflects its local needs and funding availability from all sources. The provider's accountable executive has ultimate responsibility for accepting and approving the TAM plan and SGR targets. The targets are then submit to the NTD and shared with the provider's planning organization. The narrative report, which describes the SGR performance measure metrics, is also submitted to the NTD.
49 C.F.R. §B to Part 625