49 C.F.R. § 256.7

Current through September 30, 2024
Section 256.7 - Financial assistance
(a)Demonstration funds. Federal financial assistance for the conversion of a railroad passenger terminal into an intermodal passenger terminal, under subsection 4(i)(2) of the Act, may be expended for the following project costs incurred after the date of final project approval:
(1) Acquisition or long-term lease of real property or other property interests, including air rights, subterranean rights, or easements, where necessary for project implementation;
(2) Final architectural and engineering construction documentation, including all necessary plans, specifications, detailed cost estimates, and implementation schedules; and
(3) Construction, which may include, but is not limited to:
(i) Complete rehabilitation and refurbishment of the interior and exterior of the structure;
(ii) Provision of necessary public service facilities;
(iii) Structural modifications and minor additions necessary to permit the development of
(A) improved rail passenger facilities,
(B) intercity bus terminal and docking facilities,
(C) adequate facilities for local mass transit, and
(D) parking and access for automobiles and bicycles; and
(iv) Provisions for accommodating major tenants and concessionaires such as airline ticket offices, rent-a-car offices, and other transportation service facilities.
(b)Preservation funds. Federal financial assistance under subsection 4(i)(3) of the Act, for the preservation of a railroad passenger terminal which has a reasonable likelihood of being converted or otherwise maintained, may be expended for costs incurred after the date of project approval which are necessary to maintain (and prevent the demolition, dismantling, or further deterioration of) a railroad passenger terminal pending the completion of project planning, for a period not to exceed five years.
(c)Planning funds. Federal financial assistance granted under subsection 4(i)(5) of the Act for the development of plans for the conversion of a railroad passenger terminal into an intermodal passenger terminal, which may incorporate civic and cultural activities where feasible, may be expended for the following project costs if incurred within two years after project approval:
(1) Cost of a study or studies to:
(i) Assess the need for and the feasibility of converting an existing railroad passenger terminal into an intermodal passenger terminal which may incorporate civic and cultural activities where feasible;
(ii) Develop a fiscal plan and agreements for the plan's implementation; and
(iii)
(A) Relate the project to other transportation priorities in the area; and
(B) Evaluate alternate means of providing needed intermodal passenger services within the community.
(2) Costs of preparation of preliminary architectural and engineering design documents for the project, including:
(i) Plans, sections, and sketches illustrating the functional as well as preservation aspects of the recommended development;
(ii) Assessment of the condition of existing structural and utilities systems and requirements for their improvement;
(iii) Outline specifications and preliminary estimates of project costs; and
(iv) Required environmental impact reviews and analyses.
(d)Federal share. The Federal share of any project under this part shall not exceed 80 percent of the total allowable project costs. The non-Federal share may not be augmented by any Federal funds, directly or indirectly, unless the funds are provided through a Federal program which specifically authorizes the augmentation of a non-Federal share of a federally-assisted program with such funds.

49 C.F.R. §256.7

40 FR 29080, July 10, 1975, as amended at 43 FR 21887, May 22, 1978; 44 FR 21647, Apr. 11, 1979