Current through November 30, 2024
Section 221.16 - Inspection procedure(a) Prior to operating the activation switch or covering the photoelectric cell when conducting this test, a non-train crew person shall determine that he is being protected against the unexpected movement of the train either under the procedures established in part 218 of this chapter or under the provisions of paragraph (b) of this section.(b) In order to establish the alternative means of protection under this section,(1) the train to be inspected shall be standing on a main track;(2) the inspection task shall be limited to ascertaining that the marker is in proper operating condition; and(3) prior to performing the inspection procedure, the inspector shall personally contact the locomotive engineer or hostler and be advised by that person that they are occupying the cab of the controlling locomotive and that the train is and will remain secure against movement until the inspection has been completed.51 FR 25185, July 10, 1986