48 C.F.R. §§ 9904.402-60

Current through September 30, 2024
Section 9904.402-60 - Illustrations
(a) Illustrations of costs which are incurred for the same purpose:
(1) Contractor normally allocates all travel as an indirect cost and previously disclosed this accounting practice to the Government. For purposes of a new proposal, contractor intends to allocate the travel costs of personnel whose time is accounted for as direct labor directly to the contract. Since travel costs of personnel whose time is accounted for as direct labor working on other contracts are costs which are incurred for the same purpose, these costs may no longer be included within indirect cost pools for purposes of allocation to any covered Government contract. Contractor's Disclosure Statement must be amended for the proposed changes in accounting practices.
(2) Contractor normally allocates planning costs indirectly and allocates this cost to all contracts on the basis of direct labor. A proposal for a new contract requires a disproportionate amount of planning costs. The contractor prefers to continue to allocate planning costs indirectly. In order to equitably allocate the total planning costs, the contractor may use a method for allocating all such costs which would provide an equitable distribution to all final cost objectives. For example, he may use the number of planning documents processed rather than his former allocation base of direct labor. Contractor's Disclosure Statement must be amended for the proposed changes in accounting practices.
(b) Illustrations of costs which are not incurred for the same purpose:
(1) Contractor normally allocates special tooling costs directly to contracts. The costs of general purpose tooling are normally included in the indirect cost pool which is allocated to contracts. Both of these accounting practices were previously disclosed to the Government. Since both types of costs involved were not incurred for the same purpose in accordance with the criteria set forth in the Contractor's Disclosure Statement, the allocation of general purpose tooling costs from the indirect cost pool to the contract, in addition to the directly allocated special tooling costs, is not considered a violation of the standard.
(2) Contractor proposes to perform a contract which will require three firemen on 24-hour duty at a fixed-post to provide protection against damage to highly inflammable materials used on the contract. Contractor presently has a firefighting force of 10 employees for general protection of the plant. Contractor's costs for these latter firemen are treated as indirect costs and allocated to all contracts; however, he wants to allocate the three fixed-post firemen directly to the particular contract requiring them and also allocate a portion of the cost of the general firefighting force to the same contract. He may do so but only on condition that his disclosed practices indicate that the costs of the separate classes of firemen serve different purposes and that it is his practice to allocate the general firefighting force indirectly and to allocate fixed-post firemen directly.

48 C.F.R. §§9904.402-60