If during the term of the contract M/CFO/CMP believes that the LOC should be revoked, M/CFO/CMP may, after consultation with the cognizant contracting officer(s) and GC, revoke the LOC by written notification to the contractor. A copy of any such revocation notice will immediately be provided to the cognizant contracting officer(s).
48 C.F.R. §§732.406-74