48 C.F.R. § 622.302
Current through November 30, 2024
The authority to make the determination prescribed in FAR 22.302(c) is delegated, without power of redelegation, to the head of the contracting activity.
48 C.F.R. §622.302
The authority to make the determination prescribed in FAR 22.302(c) is delegated, without power of redelegation, to the head of the contracting activity.
48 C.F.R. §622.302