48 C.F.R. § 611.501

Current through November 30, 2024
Section 611.501 - Policy
(d) The head of the contracting activity is the agency head for the purpose of FAR 11.501(d).

48 C.F.R. §611.501

64 FR 43622, Aug. 11, 1999. Redesignated and amended at 71 FR 34839 , June 16, 2006