48 C.F.R. § 2822.302

Current through November 30, 2024
Section 2822.302 - Liquidated damages and overtime pay

The authority to make the determination prescribed in FAR 22.302(c) is delegated to the HCA, or designee.

48 C.F.R. §2822.302

87 FR 47118 , 8/2/2022