The contracting officer responsible for the contract affected by the debarment or suspension shall perform the actions required by FAR 9.404(c) (1) through (6).
48 C.F.R. § 2009.404
The contracting officer responsible for the contract affected by the debarment or suspension shall perform the actions required by FAR 9.404(c) (1) through (6).
48 C.F.R. § 2009.404