48 C.F.R. § 244.302

Current through November 30, 2024
Section 244.302 - Requirements
(a) In lieu of the threshold at FAR 44.302(a), the ACO shall determine the need for a CPSR if a contractor's sales to the Government are expected to exceed $50 million during the next 12 months.

48 C.F.R. §244.302

84 FR 72249 , Dec. 31, 2019
84 FR 72249 , 12/31/2019