48 C.F.R. §§ 206.303-2

Current through September 30, 2024
Section 206.303-2 - Content
(b)
(i) In lieu of the threshold at FAR 6.303-2(b), each justification shall include the information at FAR 6.303-2(b), except for sole-source 8(a) contracts over $100 million (see paragraph (d) of this section).
(ii) Include the information required by PGI 206.303-2(b)(i) in justifications citing the authority at FAR 6.302-1.
(d) In lieu of the threshold at FAR 6.303-2(d), each justification for a sole-source 8(a) contract over $100 million shall include the information at FAR 6.303-2(d).

48 C.F.R. §§206.303-2

80 FR 21657, Apr. 20, 2015, as amended at 85 FR 34529, June 5, 2020
As amended at 85 FR 34529, 6/5/2020