The CO shall prepare requests to waive contractor compliance with CAS prescribed in FAR 30.201-5 and 48 CFR 9903.201-5(e) (FAR Appendix). The CO shall submit the request for waiver to the Director, PAM, without the power of redelegation, for a determination. PAM must report any waivers granted on a fiscal year basis to the CASB in accordance with FAR 30.201-5(e).
48 C.F.R. §§1430.201-5