48 C.F.R. § 1425.202

Current through July 31, 2024
Section 1425.202 - Exceptions
(a)
(1) The CO may determine the reasonableness of cost as determined by the formula in 1425.203-70.
(2) The Director, PAM has the authority to make the determination that use of U.S. construction material would be impracticable. Failure of the Director, PAM to issue a determination within 30 days after receipt of a request will be deemed approval for use of the cited foreign material.
(3) For items not on the list at FAR 25.108(d), the CCO may make the non-availability determination if the items cost less than the SAT. The HCA may make the non-availability determination when the cost of the items exceeds the SAT.
(b) [Reserved]

48 C.F.R. § 1425.202