Section 53.209-1 - Responsible prospective contractors

The following forms are prescribed for use in conducting preaward surveys of prospective contractors, as specified in 9.106-1, 9.106-2, and 9.106-4. These forms are authorized for local reproduction and can be found at the GSA Forms Library at https://www.gsa.gov/forms.

(a) SF 1403 (Rev. 01/2014), Preaward Survey of Prospective Contractor (General).
(b) SF 1404 (Rev. 01/2014), Preaward Survey of Prospective Contractor-Technical.
(c) SF 1405 (Rev. 01/2014), Preaward Survey of Prospective Contractor-Production.
(d) SF 1406 (Rev. 01/2014), Preaward Survey of Prospective Contractor-Quality Assurance.
(e) SF 1407 (Rev. 01/2014), Preaward Survey of Prospective Contractor-Financial Capability.
(f) SF 1408 (Rev. 01/2014), Preaward Survey of Prospective Contractor-Accounting System.