As prescribed in 36.523, insert a provision substantially the same as the following:
Site Visit (Construction) (FEB 1995)
Name: _______________________________
Address: _______________________________
_______________________________
Telephone:_______________________________
(End of provision)
Alternate I (FEB 1995). If an organized site visit will be conducted, substitute a paragraph substantially the same as the following for paragraph (b) of the basic provision:
_______________________________
[Insert date and time]
_______________________________
[Insert location]
(End of provision)
48 C.F.R. §§52.236-27