48 C.F.R. § 48.105

Current through November 30, 2024
Section 48.105 - Relationship to other incentives

Contractors should be offered the fullest possible range of motivation, yet the benefits of an accepted VECP should not be rewarded both as value engineering shares and under performance, design-to-cost, or similar incentives of the contract. To that end, when performance, design-to-cost, or similar targets are set and incentivized, the targets of such incentives affected by the VECP are not to be adjusted because of the acceptance of the VECP. Only those benefits of an accepted VECP not rewardable under other incentives are rewarded under a value engineering clause.

48 C.F.R. §48.105

48 FR 42443, Sept. 19, 1983, as amended at 54 FR 5057, Jan. 31, 1989