To verify if a proposed contractor is current with its submission of the VETS-4212 Report, the contracting officer may-
48 C.F.R. §22.1304
To verify if a proposed contractor is current with its submission of the VETS-4212 Report, the contracting officer may-
48 C.F.R. §22.1304