47 C.F.R. § 25.212

Current through September 30, 2024
Section 25.212 - Narrowband analog transmissions and digital transmissions in the GSO FSS
(a) Except as otherwise provided by this part, criteria for unacceptable levels of interference caused by other satellite networks shall be established on the basis of nominal operating conditions and with the objective of minimizing orbital separations between satellites.
(b) Emissions with an occupied bandwidth of less than 2 MHz are not protected from interference from wider bandwidth transmissions if the r.f. carrier frequency of the narrowband signal is within ±1 MHz of one of the frequencies specified in § 25.211(a) .
(c)
(1) An earth station, other than an ESIM, may be routinely licensed for analog transmissions in the conventional Ku-band or the extended Ku-band with bandwidths up to 200 kHz (or up to 1 MHz for command carriers at the band edge) if the input power spectral density into the antenna will not exceed -8 dBW/4 kHz, and the application includes certification pursuant to § 25.132(a)(1) of conformance with the antenna gain performance requirements in § 25.209(a) and (b) .
(2) An earth station may be routinely licensed for digital transmission, including digital video transmission, in the conventional Ku-band, or, except for an ESIM, in the extended Ku-band, if input power spectral density into the antenna will not exceed -14 dBW/4 kHz and the application includes certification pursuant to § 25.132(a)(1) of conformance with the antenna gain performance requirements in § 25.209(a) and (b) .
(d) An individual earth station may be routinely licensed for digital transmission in the conventional C-band or, except for an ESIM, in the extended C-band, if the applicant certifies conformance with relevant antenna performance standards in § 25.209(a) and (b) , and power density into the antenna will not exceed -2.7 dBW/4 kHz. An individual earth station, other than an ESIM, may be routinely licensed for analog transmission with carrier bandwidths up to 200 kHz (or up to 1 MHz for command carriers at the band edge) in the conventional C-band or the extended C-band, if the applicant certifies conformance with relevant antenna performance standards in § 25.209(a) and (b) , and power density into the antenna will not exceed +0.5 dBW/4 kHz.
(e) An earth station may be routinely licensed for digital transmission in the conventional or extended Ka-bands if the input power spectral density into the antenna will not exceed 3.5 dBW/MHz and the application includes certification pursuant to § 25.132(a)(1) of conformance with the antenna gain performance requirements in § 25.209(a) and (b) .
(f) In the 24.75-25.25 GHz band, an earth station that meets the antenna gain pattern requirements set forth in § 25.209(a) and (b) of this part may be routinely licensed if the maximum power density into the antenna does not exceed 3.5 dBW/MHz.
(g) A license application for earth station operation in a network using variable power density control of earth stations transmitting simultaneously in shared frequencies to the same target satellite receiving beam may be routinely processed if the applicant certifies that the aggregate off-axis EIRP density from all co-frequency earth stations transmitting simultaneously to the same target satellite receiving beam, not resulting from colliding data bursts transmitted pursuant to a contention protocol, will not exceed the applicable off-axis EIRP density limits permissible for a single earth station, as specified in § 25.218 .
(h) Applications for authority for fixed earth station operation in the conventional C-band, the extended C-band, the conventional Ku-band, the extended Ku-band, the conventional Ka-band, or the extended Ka-band that do not qualify for routine processing under relevant criteria in this section, § 25.211 , or § 25.218 are subject to the requirements in § 25.220 .

47 C.F.R. §25.212

58 FR 13421, Mar. 11, 1993, as amended at 62 FR 5931, Feb. 10, 1997; 62 FR 51378, Oct. 1, 1997; 70 FR 32256, June 2, 2005; 70 FR 33376, June 8, 2005; 72 FR 50030, Aug. 29, 2007; 73 FR 70902, Nov. 24, 2008; 78 FR 8428, Feb. 6, 2013; 79 FR 8323, Feb. 12, 2014; 81 FR 55338, Aug. 18, 2016; 84 FR 53655, Oct. 8, 2019; 87 FR 72406, Nov. 25, 2022
81 FR 55338, 9/19/2016; 84 FR 53655, 10/8/2019; 87 FR 72406, 12/27/2022