The decrease in freeboard allowed in § 45.63 is limited as follows:
Sheer Calculation-Table 4
Station | Actual ordinate | S. M. | Product |
After Half: | |||
AP | 1 | ||
L/6-AP | 3 | ||
L/3-AP | 3 | ||
Midship | 1 | ______________ | |
Sum of Aft Products | |||
After Standard Sheer .2665L + 26.651 | ______________ | ||
Difference: Sum-STD | ______________ + Excess/-Deficiency | ||
AFT Sheer: Diff ÷ 8 | ______________ Excess/Deficiency | ||
Fwd. Half: | |||
FP | 1 | ||
L/6-FP | 3 | ||
L/3-FP | 3 | ||
Midships | 1 | ______________ | |
Sum of Fwd Products | |||
Fwd Standard Sheer .5330L + 53.301 | ______________ | ||
Difference: Sum-STD | ______________ + Excess/-Deficiency | ||
FWD Sheer: Diff ÷ 8 | ______________ Excess/Deficiency |
1 L in Standard Sheer = L or 500 whichever is less.
Sheer Summation
Aft Sheer± | ______________ |
Fwd Sheer± | ______________ |
Net Sheer± | ______________ |
Mean: Net-2 | ______________ Excess/Deficiency |
S=vL'/3L
Where
s = sheer credit, to be deducted from the deficiency or added to the excess of sheer.
v = difference between actual and standard height of superstructure at the end ordinate.
L' = mean enclosed length of poop or forecastle up to a maximum length of 0.5 L.
The superstructure deck must not be less than standard height above this curve at any point. This curve must be used in determining the sheer profile for forward and after halves of the vessel.
46 C.F.R. §45.65