Total cost. The total cost of a Federal award is the sum of the allowable direct and allocable indirect costs less any applicable credits.
45 C.F.R. §75.402
Total cost. The total cost of a Federal award is the sum of the allowable direct and allocable indirect costs less any applicable credits.
45 C.F.R. §75.402