44 C.F.R. § 80.21

Current through October 31, 2024
Section 80.21 - Closeout requirements

Upon closeout of the grant, the subrecipient, through the recipient, must provide FEMA, with the following:

(a) A copy of the deed recorded for each property, demonstrating that each property approved in the original application was mitigated and that the deed restrictions recorded are consistent with the FEMA model deed restriction language to meet the requirements of this part;
(b) A photo of each property site after project completion;
(c) The latitude-longitude coordinates of each property site;
(d) Identification of each property as a repetitive loss structure, if applicable; and
(e) Other information as determined by the Administrator.

44 C.F.R. §80.21

73 FR 61743 , Oct. 31, 2007, as amended at 86 FR 50672 , Sept. 10, 2021
86 FR 50653 , 10/12/2021