Current through October 31, 2024
Section 3809.334 - What if I temporarily stop conducting operations under a notice?(a) If you stop conducting operations for any period of time, you must-(1) Maintain public lands within the project area, including structures, in a safe and clean condition;(2) Take all steps necessary to prevent unnecessary or undue degradation; and(3) Maintain an adequate financial guarantee.(b) If the period of non-operation is likely to cause unnecessary or undue degradation, BLM, in writing, will-(1) Require you to take all steps necessary to prevent unnecessary or undue degradation; and(2) Require you, after an extended period of non-operation for other than seasonal operations, to remove all structures, equipment, and other facilities and reclaim the project area.