Section 3263.11 - What information must I give BLM to approve my Sundry Notice for abandoning a well?Send us a Sundry Notice with:
(a) All the information required in the well completion report (see § 3264.10 ), unless we already have that information;(b) A detailed description of the proposed work, including: (1) Type, depth, length, and interval of plugs;(2) Methods you will use to verify the plugs (tagging, pressure testing, etc.);(3) Weight and viscosity of mud that you will use in the uncemented portions;(4) Perforating or removing casing; and(5) Restoring the surface; and(c) Any other information that we may require.