Table 1 to Paragraph (a) -Notification Via Sundry Notice Requirements
Sundry notice requirements | Reference |
Flaring of gas following removal of [GREATER THAN EQUAL TO]50 percent of the natural gas liquids from the gas stream on-lease | § 3179.41(b)(12). |
Other gas sample location for flare approved by the AO | § 3179.71(d)(3) and (e)(2). |
Unavoidable/avoidable determination of loss of oil and/or gas while drilling for loss of well control event | § 3179.80. |
Extension of time limit or volumetric limit for well completion or recompletion flaring, or exploratory coalbed methane dewatering flaring | § 3179.81(e). |
Extension of time limit for well testing subsequent to initial completion | § 3179.82. |
Within 45 days of start of an emergency, estimate the volume flared or vented beyond the first 48 hours of the emergency | § 3179.83(c). |
Delay of leak repair beyond 30 calendar days with good cause | § 3179.101(b) . |
Table 2 to Paragraph (b) -Information Required at the Request of the AO
Information required at the request of the AO | Reference |
Ultrasonic meter flare gas testing report | § 3179.71(c)(2)(i). |
Ultrasonic meter manufacturer's specifications including installation and operation specifications | § 3179.71(c)(2)(ii). |
Recordkeeping for vented or flared gas events | § 3179.72(c). |
Recordkeeping for leak detection and repair | § 3179.102(a) . |
Table 3 to Paragraph (c)-LDAR Program
Information required to be sent to the BLM State Office | Reference |
First submission of a leak detection and repair program to the BLM for review | § 3179.100(b) and (d). |
Annual review and update of the leak detection and repair program to the BLM | § 3179.100(e). |
43 C.F.R. §3179.43