Example: Penalty-In 1996 the District delivers 90 percent of the maximum headgate entitlement or 194,703 acre-feet 216,337 * .90) but actually diverts 308,000 acre-feet. The efficiency of the Project is 63.2 percent (194,703 divided by 308,000). Since the established efficiency of 65.1 percent would have required a diversion of only 299,083 acre-feet (194,703 divided by .651) the District has operated the system with 8,917 acre-feet of excess losses. Therefore, 8,917 acre-feet was borrowed and must be added to the actual storage quantities of Lahontan Reservoir for calculating target storage levels and Truckee River diversions.
43 C.F.R. §418.37