After a claim is filed with the appropriate contractor in the manner and form described in subpart C of part 424 of this chapter, the contractor must-
42 C.F.R. §405.920
After a claim is filed with the appropriate contractor in the manner and form described in subpart C of part 424 of this chapter, the contractor must-
42 C.F.R. §405.920