The following table summarizes the required and recommended calibrations and verifications described in this subpart and indicates when these have to be performed:
Table 1 of § 1065.303 -Summary of Required Calibration and Verifications
Type of calibration or verification | Minimum frequency a |
§ 1065.305 : Accuracy, repeatability and noise | Accuracy: Not required, but recommended for initial installation. Repeatability: Not required, but recommended for initial installation. |
Noise: Not required, but recommended for initial installation. | |
§ 1065.307 : Linearity verification | |
Speed: Upon initial installation, within 370 days before testing and after major maintenance. | |
Torque: Upon initial installation, within 370 days before testing and after major maintenance. | |
Electrical power, current, and voltage: Upon initial installation, within 370 days before testing and after major maintenance.b | |
Fuel mass flow rate: Upon initial installation, within 370 days before testing, and after major maintenance. | |
Fuel mass scale: Upon initial installation, within 370 days before testing, and after major maintenance. | |
DEF mass flow rate: Upon initial installation, within 370 days before testing, and after major maintenance.c | |
DEF mass scale: Upon initial installation, within 370 days before testing, and after major maintenance. | |
Intake-air, dilution air, diluted exhaust, and batch sampler flow rates: Upon initial installation, within 370 days before testing and after major maintenance.d | |
Raw exhaust flow rate: Upon initial installation, within 185 days before testing and after major maintenance.d | |
Gas dividers: Upon initial installation, within 370 days before testing, and after major maintenance. | |
Gas analyzers (unless otherwise noted): Upon initial installation, within 35 days before testing and after major maintenance. | |
FTIR and photoacoustic analyzers: Upon initial installation, within 370 days before testing and after major maintenance. | |
GC-ECD: Upon initial installation and after major maintenance. | |
PM balance: Upon initial installation, within 370 days before testing and after major maintenance. | |
Pressure, temperature, and dewpoint: Upon initial installation, within 370 days before testing and after major maintenance. | |
§ 1065.308 : Continuous gas analyzer system response and updating-recording verification-for gas analyzers not continuously compensated for other gas species | Upon initial installation or after system modification that would affect response. |
§ 1065.309 : Continuous gas analyzer system-response and updating-recording verification-for gas analyzers continuously compensated for other gas species | Upon initial installation or after system modification that would affect response. |
§ 1065.310 : Torque | Upon initial installation and after major maintenance. |
§ 1065.315 : Pressure, temperature, dewpoint | Upon initial installation and after major maintenance. |
§ 1065.320 : Fuel flow | Upon initial installation and after major maintenance. |
§ 1065.325 : Intake flow | Upon initial installation and after major maintenance. |
§ 1065.330 : Exhaust flow | Upon initial installation and after major maintenance. |
§ 1065.340 : Diluted exhaust flow (CVS) | Upon initial installation and after major maintenance. |
§ 1065.341 : CVS and PFD flow verification (propane check) | Upon initial installation, within 35 days before testing, and after major maintenance.e |
§ 1065.342 Sample dryer verification | For thermal chillers: Upon installation and after major maintenance. For osmotic membranes; upon installation, within 35 days of testing, and after major maintenance. |
§ 1065.345 : Vacuum leak | For laboratory testing: Upon initial installation of the sampling system, within 8 hours before the start of the first test interval of each duty-cycle sequence, and after maintenance such as pre-filter changes. |
For field testing: After each installation of the sampling system on the vehicle, prior to the start of the field test, and after maintenance such as pre-filter changes. | |
§ 1065.350 : CO2 NDIR H2O interference | Upon initial installation and after major maintenance. |
§ 1065.355 : CO NDIR CO2 and H2O interference | Upon initial installation and after major maintenance. |
§ 1065.360 : FID calibration THC FID optimization, and THC FID verification | Calibrate all FID analyzers: upon initial installation and after major maintenance. |
Optimize and determine CH4 response for THC FID analyzers: upon initial installation and after major maintenance. | |
Verify CH4 response for THC FID analyzers: upon initial installation, within 185 days before testing, and after major maintenance. | |
Verify C2H6 response for THC FID analyzers if used for NMNEHC determination: upon initial installation, within 185 days before testing, and after major maintenance. | |
§ 1065.362 : Raw exhaust FID O2 interference | For all FID analyzers: upon initial installation, and after major maintenance. |
For THC FID analyzers: upon initial installation, after major maintenance, and after FID optimization according to § 1065.360 . | |
§ 1065.365 : Nonmethane cutter penetration | Upon initial installation, within 185 days before testing, and after major maintenance. |
§ 1065.366 : Interference verification for FTIR analyzers | Upon initial installation and after major maintenance. |
§ 1065.369 : H2O, CO, and CO2 interference verification for ethanol photoacoustic analyzers | Upon initial installation and after major maintenance. |
§ 1065.370 : CLD CO2 and H2O quench | Upon initial installation and after major maintenance. |
§ 1065.372 : NDUV HC and H2O interference | Upon initial installation and after major maintenance. |
§ 1065.375 : N2O analyzer interference | Upon initial installation and after major maintenance. |
§ 1065.376 : Chiller NO2 penetration | Upon initial installation and after major maintenance. |
§ 1065.378 : NO2-to-NO converter conversion | Upon initial installation, within 35 days before testing, and after major maintenance. |
§ 1065.390 : PM balance and weighing | Independent verification: Upon initial installation, within 370 days before testing, and after major maintenance. |
Zero, span, and reference sample verifications: Within 12 hours of weighing, and after major maintenance. | |
§ 1065.395 : Inertial PM balance and weighing | Independent verification: Upon initial installation, within 370 days before testing, and after major maintenance. |
Other verifications: Upon initial installation and after major maintenance. |
a Perform calibrations and verifications more frequently than we specify, according to measurement system manufacturer instructions and good engineering judgment.
b Perform linearity verification either for electrical power or for current and voltage.
c Linearity verification is not required if DEF flow rate comes directly from the ECM signal as described in § 1065.247(b) .
d Linearity verification is not required if the flow signal's accuracy is verified by carbon balance error verification as described in § 1065.307(e)(5) or a propane check as described in § 1065.341 .
e CVS and PFD flow verification (propane check) is not required for measurement systems verified by linearity verification as described in § 1065.307 or carbon balance error verification as described in § 1065.341(h) .
40 C.F.R. §1065.303