Current through November 30, 2024
Section 761.211 - [Effective 1/22/2025] Manifest system-Transporter requirements(a)(1) A transporter shall not accept PCB waste from a generator unless it is accompanied by a manifest signed by the generator in accordance with § 761.210(a)(1) , except that a manifest is not required if any one of the following conditions exists: (i) The shipment of PCB waste consists solely of PCB wastes with PCB concentrations below 50 ppm, unless the PCB concentration below 50 ppm was the result of dilution, in which case § 761.1(b) requires that the waste be managed as if it contained PCBs at the concentration prior to dilution.(ii) The PCB waste is accepted by the transporter for transport only to a storage or disposal facility owned or operated by the generator of the PCB waste.(b) Before transporting the PCB waste, the transporter must sign and date the manifest acknowledging acceptance of the PCB waste from the generator. The transporter must return a signed copy to the generator before leaving the generator's property.(c) The transporter shall ensure that the manifest accompanies the PCB waste.(d) A transporter who delivers PCB waste to another transporter or to the designated facility must: (1) Obtain the date of delivery and the signature of that transporter or of the owner or operator of the designated facility on the manifest; and(2) Retain one copy of the manifest in accordance with § 761.214 ; and(3) Give the remaining copies of the manifest to the accepting transporter or designated facility.(e) The requirements of paragraphs (c), (d) and (f) of this section do not apply to water (bulk shipment) transporters if: (1) The PCB waste is delivered by water (bulk shipment) to the designated facility; and(2) A shipping paper containing all the information required on the manifest (excluding EPA identification number, generator certification, and signatures) accompanies the PCB waste; and(3) The delivering transporter obtains the date of delivery and signature of the owner or operator of the designated facility on either the manifest or the shipping paper; and(4) The person delivering the PCB waste to the initial water (bulk shipment) transporter obtains the date of delivery and signature of the water (bulk shipment) transporter on the manifest and forwards it to the designated facility; and(5) A copy of the shipping paper or manifest is retained by each water (bulk shipment) transporter in accordance with § 761.214 .(f) For shipments involving rail transportation, the requirements of paragraphs (c), (d) and (e) do not apply and the following requirements do apply: (1) When accepting PCB waste from a non-rail transporter, the initial rail transporter must: (i) Sign and date the manifest acknowledging acceptance of the PCB waste;(ii) Return a signed copy of the manifest to the non-rail transporter;(iii) Forward at least three copies of the manifest to: (A) The next non-rail transporter, if any; or,(B) The designated facility, if the shipment is delivered to that facility by rail;(iv) Retain one copy of the manifest and rail shipping paper in accordance with § 761.214 .(2) Rail transporters must ensure that a shipping paper containing all the information required on the manifest (excluding the EPA identification numbers, generator certification, and signatures) accompanies the PCB waste at all times. Note: Intermediate rail transporters are not required to sign either the manifest or shipping paper.
(3) When delivering PCB waste to the designated facility, a rail transporter must: (i) Obtain the date of delivery and signature of the owner or operator of the designated facility on the manifest or the shipping paper (if the manifest has not been received by the facility); and(ii) Retain a copy of the manifest or signed shipping paper in accordance with § 761.214 .(4) When delivering PCB waste to a non-rail transporter a rail transporter must: (i) Obtain the date of delivery and the signature of the next non-rail transporter on the manifest; and(ii) Retain a copy of the manifest in accordance with § 761.214 .(5) Before accepting PCB waste from a rail transporter, a non-rail transporter must sign and date the manifest and provide a copy to the rail transporter.(g) If after a manifest has been originated electronically and signed electronically by the initial transporter, and the electronic manifest system should become unavailable for any reason, then the transporter must follow the replacement manifest procedures in accordance with § 263.20(a)(6) of this chapter. 77 FR 54832 , Sept. 6, 2012