The Control Authority may allow for verifiable estimates of these flows where justified by cost or feasibility considerations.
The request for a monitoring waiver must be signed in accordance with paragraph (l) of this section and include the certification statement in § 403.6(a)(2)(ii) . Non-detectable sample results may only be used as a demonstration that a pollutant is not present if the EPA approved method from 40 CFR part 136 with the lowest minimum detection level for that pollutant was used in the analysis.
Based on my inquiry of the person or persons directly responsible for managing compliance with the Pretreatment Standard for 40 CFR _______ [specify applicable National Pretreatment Standard part(s)], I certify that, to the best of my knowledge and belief, there has been no increase in the level of ______ [list pollutant(s)] in the wastewaters due to the activities at the facility since filing of the last periodic report under 40 CFR 403.12(e)(1) .
Subsequent months during which the Industrial User discharges more than such quantities of any hazardous waste do not require additional notification.
Based on my inquiry of the person or persons directly responsible for managing compliance with the categorical Pretreatment Standards under 40 CFR ____, I certify that, to the best of my knowledge and belief that during the period from ________ ____, to ________, ____ [month, days, year]:
(a) The facility described as ________ [facility name] met the definition of a non-significant categorical Industrial User as described in § 403.3(v)(2); (b) the facility complied with all applicable Pretreatment Standards and requirements during this reporting period; and (c) the facility never discharged more than 100 gallons of total categorical wastewater on any given day during this reporting period. This compliance certification is based upon the following information:
_______________________________
_______________________________
40 C.F.R. §403.12