40 C.F.R. § 192.03

Current through September 30, 2024
Section 192.03 - Monitoring

A groundwater monitoring plan shall be implemented, to be carried out over a period of time commencing upon completion of remedial actions taken to comply with the standards in § 192.02 , and of a duration which is adequate to demonstrate that future performance of the system of disposal can reasonably be expected to be in accordance with the design requirements of § 192.02(c) . This plan and the length of the monitoring period shall be modified to incorporate any corrective actions required under § 192.04 or § 192.12(c) .

40 C.F.R. §192.03

60 FR 2866, Jan. 11, 1995