Where:
CESCombined = The combined emission stream limit based upon monitoring after the emission streams are combined, in pounds.
M30day = The 30-operating day total mass sent to controls for the combined emission stream (i.e., monitoring data at the inlet of the control system), as calculated using equation A-3 and determined in accordance with appendix A to this subpart. The term "M30day" as used in this equation is equivalent to the term "E30day" as designated in equation A-3.
Max(ER) = The most stringent emission reduction standard specified in tables 1 through 5 of this subpart applicable to any of the constituent streams, in decimal format.
Where:
CESStreams = The combined emission stream limit based upon monitoring before the emission streams are combined, in pounds.
Mc,i = The 30-operating day total mass sent to controls for each non-SCV constituent emission stream (i.e., monitoring data at the inlet of the control system), as calculated using equation A-3 and determined in accordance with appendix A to this subpart. The term "Mc,i" as used in this equation is equivalent to the term "E30day" as designated in equation A-3.
ERi = The applicable emission reduction standard from tables 2 through 5 of this subpart to each non-SCV constituent emission stream i.
i = Non-SCV constituent emission stream index.
n = Total number of non-SCV constituent emission streams.
Mc,j = The 30-operating day total mass sent to controls for each SCV emission stream, as determined in accordance with equation 10 of § 63.364(f)(1)(i)(C) (1).
ERj = The applicable SCV emission reduction standard in table 1 to this subpart, in decimal format.
j = SCV emission stream index.
m = Total number of SCV emission streams.
Where:
SWELFac = SWEL based upon facility EtO use, in pounds.
MFac = Facility EtO use over the previous 30 operating days, in pounds, as determined in accordance with equation 11 of § 63.364(i)(2) .
0.99 = Adjustment factor for EtO residual in sterilized product.
ERSCV = The applicable SCV emission reduction standard in table 1 to this subpart, in decimal format.
Where:
EFac = The total emissions from the facility over the previous 30-operating days, in pounds.
Eo,i = The 30-operating day rolling sum of emissions calculated at each exhaust stack, i, monitored by an EtO CEMS, as calculated using equation A-3 of appendix A to this subpart.
i = Exhaust stack index
n = Total number of exhaust stacks
Where:
SWELStreams = SWEL based upon individual emissions streams, in pounds.
Mc,i = The 30-operating day total mass sent to controls (i.e., monitoring data at the inlet of the control system) for each non-SCV emission stream, as calculated using equation A-3 and determined in accordance with appendix A to this subpart. The term "Mc,i" as used in this equation is equivalent to the term "E30day" as designated in equation A-3.
ERi = The applicable emission reduction standard to each non-SCV emission stream, i, specified in tables 1 through 5 of this subpart, in decimal format.
i = Non-SCV emission streams index.
n = Total number of non-SCV emission streams.
Mc,j = The 30-operating day total mass sent to controls for each SCV emission stream, as determined in accordance with equation 10 in § 63.364(f)(1)(i)(C) (1).
ERj = The applicable SCV emission reduction standard in table 1 to this subpart, in decimal format.
j = SCV emission stream index.
m = Total number of SCV emission streams.
40 C.F.R. §63.362