40 C.F.R. § Table 6 to Subpart O of Part 63

Current through November 30, 2024
Appendix Table 6 to Subpart O of Part 63 - Applicability of General Provisions to This Subpart

As specified in § 63.360 , the parts of the General Provisions that apply to you are shown in the following table:

CitationSubjectApplies to subpart O
§ 63.1(a)(1) ApplicabilityYes, additional terms defined in § 63.361 ; when overlap between subparts A and O occurs, subpart O takes precedence.
§ 63.1(a)(2)-(3) Yes.
§ 63.1(a)(4) Yes. Subpart O clarifies the applicability of each paragraph in subpart A to facilities subject to subpart O.
§ 63.1(a)(5) [Reserved]No.
§ 63.1(a)(6)-(8) Yes.
§ 63.1(a)(9) [Reserved]
§ 63.1(a)(10)-(14) Yes.
§ 63.1(b)(1)-(2) Yes.
§ 63.1(b)(3) No.
§ 63.1(c)(1) No. Subpart O clarifies the applicability of each paragraph in subpart A to facilities subject to subpart O in this table.
§ 63.1(c)(2) Yes.
§ 63.1(c)(3) [Reserved]No.
§ 63.1(c)(4) Yes.
§ 63.1(c)(5) No. § 63.360 specifies applicability.
§ 63.1(c)(6) Yes.
§ 63.1(d) [Reserved]No.
§ 63.1(e) Yes.
§ 63.2 DefinitionsYes, additional terms defined in § 63.361 ; when overlap between subparts A and O occurs, subpart O takes precedence.
§ 63.3 Units and abbreviationsYes, other units used in subpart O are defined in the text of subpart O.
§ 63.4(a)(1)-(3) Prohibited activitiesYes.
§ 63.5(a) Construction/ReconstructionNo. § 63.366(b)(1) contains applicability requirements for constructed or reconstructed facilities.
§ 63.5(b)(1) Yes.
§ 63.5(b)(2) [Reserved]
§ 63.5(b)(3) No. See § 63.366(b)(2) .
§ 63.5(b)(4)-(6) Yes.
§ 63.5(c) [Reserved]
§ 63.5(d)(1)-(2) No. See § 63.366(b)(3) .
§ 63.5(d)(3)-(4) Yes.
§ 63.5(e) Yes.
§ 63.5(f)(1)-(2) No. See § 63.366(b)(4) .
§ 63.6(a) ApplicabilityYes.
§ 63.6(b)-(c) No. § 63.360(j) specifies compliance dates for facilities.
§ 63.6(d) [Reserved]
§ 63.6(e)(1)(i) No.
§ 63.6(e)(1)(ii) Requirement to correct malfunctions ASAPNo.
§ 63.6(e)(1)(iii) Yes.
§ 63.6(e)(2) [Reserved]No.
§ 63.6(e)(3) SSM Plan RequirementsNo.
§ 63.6(f)(1) SSM exemptionNo.
§ 63.6(f)(2)(i) Methods for Determining ComplianceYes.
§ 63.6(f)(2)(ii) No. § 63.363 specifies parameters for determining compliance.
§ 63.6(f)(2)(iii)-(iv) Yes.
§ 63.6(f)(2)(v) No.
§ 63.6(f)(3) Yes.
§ 63.6(g) Alternative StandardYes.
§ 63.6(h) Compliance with opacity and visible emission standardsNo. Subpart O does not contain any opacity or visible emission standards.
§ 63.6(i)(1)-(14), and (16) Compliance ExtensionYes.
§ 63.6(j) Presidential Compliance ExemptionYes.
§ 63.7(a) Applicability and Performance Test DatesYes.
§ 63.7(b) Notification of Performance TestYes.
§ 63.7(c) Quality Assurance/Test PlanYes.
§ 63.7(d) Testing FacilitiesYes.
§ 63.7(e)(1) SSM exemptionNo.
§ 63.7(e)(2)-(4) Conduct of Performance TestsYes. § 63.365 also contains test methods specific to facilities subject to the emissions standards.
§ 63.7(f) Alternative Test MethodYes.
§ 63.7(g) Performance Test Data AnalysisYes, except this subpart specifies how and when the performance test and performance evaluation results are reported.
§ 63.7(h) Waiver of TestsYes.
§ 63.8(a)(1) Applicability of Monitoring RequirementsYes.
§ 63.8(a)(2) Performance SpecificationsYes.
§ 63.8(a)(3) [Reserved]No.
§ 63.8(a)(4) Monitoring with FlaresYes.
§ 63.8(b)(1) MonitoringYes.
§ 63.8(b)(2)-(3) Multiple Effluents and Multiple Monitoring SystemsYes.
§ 63.8(c)(1)(i) General duty to minimize emissions and CMS operationNo.
§ 63.8(c)(1)(ii) No. A startup, shutdown, and malfunction plan is not required for these standards.
§ 63.8(c)(1)(iii) Requirement to develop SSM Plan for CMSNo.
§ 63.8(c)(2)-(3) Yes.
§ 63.8(c)(4)-(5) No. Frequency of monitoring measurements is provided in § 63.364 ; opacity monitors are not required for these standards.
§ 63.8(c)(6) No. Performance specifications are contained in § 63.365 .
§ 63.8(c)(7)(i)(A)-(B) No. Performance specifications are contained in § 63.365 .
§ 63.8(c)(7)(i)(C) No. Opacity monitors are not required for these standards.
§ 63.8(c)(7)(ii) No. Performance specifications are contained in § 63.365 .
§ 63.8(c)(8) No.
§ 63.8(d)(1)-(2) Yes.
§ 63.8(d)(3) Written procedures for CMSNo.
§ 63.8(e)(1) CMS Performance EvaluationYes, but only applies for CEMS, except this subpart specifies how and when the performance evaluation results are reported.
§ 63.8(e)(2) Yes.
§ 63.8(e)(3) Yes.
§ 63.8(e)(4) Yes.
§ 63.8(e)(5)(i) Yes.
§ 63.8(e)(5)(ii) No. Opacity monitors are not required for these standards.
§ 63.8(f)(1)-(5) Yes.
§ 63.8(f)(6) No.
§ 63.8(g)(1) Yes.
§ 63.8(g)(2) No.
§ 63.8(g)(3)-(5) Yes.
§ 63.9(a) Notification requirementsYes.
§ 63.9(b)(1)-(i) Yes.
§ 63.9(b)(1)(ii)-(iii) Initial NotificationsNo. § 63.366(c)(1)(i) contains language for facilities that increase usage such that the source becomes subject to the emissions standards.
§ 63.9(b)(2)-(3) Initial NotificationsYes. § 63.366(c)(3) contains additional information to be included in the initial report for existing and new facilities.
§ 63.9(b)(4)-(5) Initial NotificationsNo. § 63.366(c)(1)(ii) and (iii) contains requirements for new or reconstructed facilities subject to the emissions standards.
§ 63.9(c) Request for Compliance ExtensionYes.
§ 63.9(d) Notification of Special Compliance Requirements for New SourcesNo.
§ 63.9(e) Notification of Performance TestYes.
§ 63.9(f) Notification of VE/Opacity TestNo. Opacity monitors are not required for these standards.
§ 63.9(g)(1) Additional Notifications When Using CMSYes.
§ 63.9(g)(2)-(3) Additional Notifications When Using CMSNo. Opacity monitors and relative accuracy testing are not required for these standards.
§ 63.9(h)(1)-(3) Notification of Compliance StatusYes, except § 63.9(h)(5) does not apply because § 63.366(c)(2) instructs facilities to submit actual data.
§ 63.9(i) Adjustment of Submittal DeadlinesYes.
§ 63.9(j) Change in previous informationYes.
§ 63.9(k) Electronic reporting proceduresYes, as specified in § 63.9(j) .
§ 63.10(a) Recordkeeping/ReportingYes.
§ 63.10(b)(1) Recordkeeping/ReportingYes.
§ 63.10(b)(2)(i) Recordkeeping for startup and shutdownNo. See 63.367(f) for recordkeeping requirements.
§ 63.10(b)(2)(ii) Recordkeeping for SSM and failures to meet standardsNo. See 63.367(f) for recordkeeping requirements.
§ 63.10(b)(2)(iii) Records related to maintenance of air pollution control equipmentYes.
§ 63.10(b)(2)(iv)-(v) Actions taken to minimize emissions during SSMNo.
§ 63.10(b)(2)(vi) CMS RecordsYes.
§ 63.10(b)(2)(vii)-(ix) RecordsYes.
§ 63.10(b)(2)(x)-(xi) CMS RecordsYes.
§ 63.10(b)(2)(xii) RecordsYes.
§ 63.10(b)(2) (xiii)RecordsYes.
§ 63.10(b)(2)(xiv) RecordsYes.
§ 63.10(b)(3) RecordsYes.
§ 63.10(c)(1)-(14) RecordsYes.
§ 63.10(c)(15) Use of SSM PlanNo.
§ 63.10(d)(1) General Reporting RequirementsYes.
§ 63.10(d)(2) Report of Performance Test ResultsNo. This subpart specifies how and when the performance test results are reported.
§ 63.10(d)(3) Reporting Opacity or VE ObservationsNo. Subpart O does not contain opacity or visible emissions standards.
§ 63.10(d)(4) Progress ReportsYes.
§ 63.10(d)(5) SSM ReportsNo. See § 63.366 for malfunction reporting requirements.
§ 63.10(e)(1) Additional CEMS ReportsYes.
§ 63.10(e)(2)(i) Additional CMS ReportsYes, except this subpart specifies how and when the performance evaluation results are reported.
§ 63.10(e)(2)(ii) Additional COMS ReportsNo. Opacity monitors are not required for these standards.
§ 63.10(e)(3)(i)-(iv) ReportsYes.
§ 63.10(e)(3)(v) Excess Emissions ReportsNo. § 63.366(b) and (c) specify contents and submittal dates for excess emissions and monitoring system performance reports.
§ 63.10(e)(3)(vi) -(viii)Excess Emissions Report and Summary ReportYes.
§ 63.10(e)(4) Reporting COMS dataNo. Opacity monitors are not required for these standards.
§ 63.10(f) Waiver for Recordkeeping/ReportingYes.
§ 63.11 Control device requirements for flares and work practice requirements for equipment leaksYes.
§ 63.12 DelegationYes.
§ 63.13 AddressesYes.
§ 63.14 Incorporation by ReferenceYes.
§ 63.15 Availability of InformationYes.

40 C.F.R. §Table 6 to Subpart O of Part 63

89 FR 24172 , 4/5/2024