40 C.F.R. § 63.1662-63 app Table 10 to Subpart HHHHH of Part 63

Current through September 30, 2024
Appendix Table 10 to Subpart HHHHH of Part 63 - Applicability of General Provisions to This Subpart

As specified in § 63.8095 , the parts of the general provisions that apply to you are shown in the following table:

Table 10 to Subpart HHHHH of Part 63-Applicability of General Provisions to This Subpart

Citation Subject Explanation
§ 63.1 ApplicabilityYes.
§ 63.2 DefinitionsYes.
§ 63.3 Units and AbbreviationsYes.
§ 63.4 Prohibited ActivitiesYes.
§ 63.5 Construction/ReconstructionYes.
§ 63.6(a) ApplicabilityYes.
§ 63.6(b)(1)-(4) Compliance Dates for New and Reconstructed sourcesYes.
§ 63.6(b)(5) NotificationYes.
§ 63.6(b)(6) [Reserved]
§ 63.6(b)(7) Compliance Dates for New and Reconstructed Area Sources That Become MajorYes.
§ 63.6(c)(1)-(2) Compliance Dates for Existing SourcesYes.
§ 63.6(c)(3)-(4) [Reserved]
§ 63.6(c)(5) Compliance Dates for Existing Area Sources That Become MajorYes.
§ 63.6(d) [Reserved]
§ 63.6(e)(1)(i) General Duty to Minimize EmissionsYes, before the compliance date specified in § 63.7995(e) . No, on and after the compliance date specified in § 63.7995(e) . See § 63.8000(e) for the general duty requirement.
§ 63.6(e)(1)(ii) Requirement to Correct Malfunctions as Soon as PossibleYes, before the compliance date specified in § 63.7995(e) . No, on and after the compliance date specified in § 63.7995(e) .
§ 63.6(e)(1)(iii)-(2) Operation and MaintenanceYes.
§ 63.6(e)(3) SSM PlanYes, before the compliance date specified in § 63.7995(e) . No, on and after the compliance date specified in § 63.7995(e) .
§ 63.6(f)(1) Compliance with Non-Opacity Standards Except During SSMNo. See § 63.8000(a) .
§ 63.6(f)(2)-(3) Methods for Determining ComplianceYes.
§ 63.6(g)(1)-(3) Alternative StandardYes.
§ 63.6(h)(1) Compliance with Opacity/Visible Emission (VE) Standards Except During SSMNo. See § 63.8000(a) .
§ 63.6(h)(2)-(9) Opacity/VE StandardsOnly for flares for which Method 22 of 40 CFR part 60, appendix A-7, observations are required as part of a flare compliance assessment.
§ 63.6(i)(1)-(14) Compliance ExtensionYes.
§ 63.6(j) Presidential Compliance ExemptionYes.
§ 63.7(a)(1)-(2) Performance Test DatesYes, except substitute 150 days for 180 days.
§ 63.7(a)(3)-(4) CAA Section 114 Authority, Force MajeureYes, and these paragraphs also apply to flare compliance assessments as specified under § 63.997(b)(2) .
§ 63.7(b)(1) Notification of Performance TestYes.
§ 63.7(b)(2) Notification of ReschedulingYes.
§ 63.7(c) Quality Assurance/Test PlanYes, except the test plan must be submitted with the notification of the performance test if the control device controls process vessels.
§ 63.7(d) Testing FacilitiesYes.
§ 63.7(e)(1) Conditions for Conducting Performance TestsYes, before the compliance date specified in § 63.7995(e) , except that performance tests for process vessels must be conducted under worst-case conditions as specified in § 63.8005 . No, on and after the compliance date specified in § 63.7995(e) . See § 63.8005(d) .
§ 63.7(e)(2) Conditions for Conducting Performance TestsYes.
§ 63.7(e)(3) Test Run DurationYes.
§ 63.7(f) Alternative Test MethodYes.
§ 63.7(g) Performance Test Data AnalysisYes.
§ 63.7(h) Waiver of TestsYes.
§ 63.8(a)(1) Applicability of Monitoring RequirementsYes.
§ 63.8(a)(2) Performance SpecificationsYes.
§ 63.8(a)(3) [Reserved]
§ 63.8(a)(4) Monitoring with FlaresYes.
§ 63.8(b)(1) MonitoringYes.
§ 63.8(b)(2)-(3) Multiple Effluents and Multiple Monitoring SystemsYes.
§ 63.8(c)(1) Monitoring System Operation and MaintenanceYes.
§ 63.8(c)(1)(i) Maintain and operate CMSYes, before the compliance date specified in § 63.7995(e) . No, on and after the compliance date specified in § 63.7995(e) . See § 63.8000(e) for the general duty to maintain and operate each CMS.
§ 63.8(c)(1)(ii) Routine repairsYes.
§ 63.8(c)(1)(iii) Requirement to develop SSM plan for CMSYes, before the compliance date specified in § 63.7995(e) . No, on and after the compliance date specified in § 63.7995(e) .
§ 63.8(c)(2)-(3) Monitoring System InstallationYes.
§ 63.8(c)(4) RequirementsOnly for CEMS; requirements for CPMS are specified in referenced subpart SS of this part. This subpart does not contain requirements for continuous opacity monitoring systems (COMS).
§ 63.8(c)(4)(i) CMS RequirementsNo. This subpart does not require COMS.
§ 63.8(c)(4)(ii) CMS requirementsYes.
§ 63.8(c)(5) COMS Minimum ProceduresNo. This subpart does not contain opacity or VE limits.
§ 63.8(c)(6) CMS RequirementsOnly for CEMS; requirements for CPMS are specified in referenced subpart SS of this part.
§ 63.8(c)(7)-(8) CMS RequirementsOnly for CEMS. Requirements for CPMS are specified in referenced subpart SS of this part.
§ 63.8(d)(1)-(2) CMS Quality ControlOnly for CEMS; requirements for CPMS are specified in referenced subpart SS of this part.
§ 63.8(d)(3) Written procedures for CMSYes, before the compliance date specified in § 63.7995(e) . No, on and after the compliance date specified in § 63.7995(e) . See § 63.8000(d)(8) .
§ 63.8(e) CMS Performance EvaluationSection 63.8(e)(6)(ii) does not apply because this subpart does not require COMS. Other sections apply only for CEMS; requirements for CPMS are specified in referenced subpart SS of this part.
§ 63.8(f)(1)-(5) Alternative Monitoring MethodYes, except you may also request approval using the precompliance report.
§ 63.8(f)(6) Alternative to Relative Accuracy TestOnly for CEMS.
§ 63.8(g)(1)-(4) Data ReductionOnly when using CEMS, except § 63.8(g)(2) does not apply because data reduction requirements for CEMS are specified in § 63.8000(d)(4)(iv) .
The requirements for COMS do not apply because this subpart has no opacity or VE limits.
§ 63.8(g)(5) Data ReductionNo. Requirements for CEMS are specified in § 63.8000(d)(4) . Requirements for CPMS are specified in referenced subpart SS of this part.
§ 63.9(a) Notification RequirementsYes.
§ 63.9(b)(1)-(5) Initial NotificationsYes.
§ 63.9(c) Request for Compliance ExtensionYes.
§ 63.9(d) Notification of Special Compliance Requirements for New SourceYes.
§ 63.9(e) Notification of Performance TestYes.
§ 63.9(f) Notification of VE/Opacity TestNo. This subpart does not contain opacity or VE limits.
§ 63.9(g) Additional Notifications When Using CMSOnly for CEMS; requirements for CPMS are specified in referenced subpart SS of this part.
§ 63.9(h)(1)-(6) Notification of Compliance StatusYes, except this subpart has no opacity or VE limits, and § 63.9(h)(2) does not apply because § 63.8075(d) specifies the required contents and due date of the notification of compliance status report.
§ 63.9(i) Adjustment of Submittal DeadlinesYes.
§ 63.9(j) Change in previous informationYes, for change in major source status, otherwise § 63.8075(e)(8) specifies reporting requirements for process changes.
§ 63.9(k) Electronic reporting proceduresYes, as specified in § 63.9(j) .
§ 63.10(a) Recordkeeping/ReportingYes.
§ 63.10(b)(1) Recordkeeping/ReportingYes.
§ 63.10(b)(2)(i)-(ii) Records related to SSMNo. Before the compliance date specified in § 63.7995(e) , see § 63.998(c)(1)(ii)(D) through (G) and (d)(3) for recordkeeping requirements for periods of SSM. On and after the compliance date specified in § 63.7995(e) , see § 63.8080(i) .
§ 63.10(b)(2)(iii) Records related to maintenance of air pollution control equipmentYes.
§ 63.10(b)(2)(iv)-(v) Records related to SSMYes, before the compliance date specified in § 63.7995(e) . No, on and after the compliance date specified in § 63.7995(e) .
§ 63.10(b)(2)(vi), (x), and (xi) CMS RecordsOnly for CEMS; requirements for CPMS are specified in referenced subpart SS of this part.
§ 63.10(b)(2)(vii)-(ix) RecordsYes.
§ 63.10(b)(2)(xii) RecordsYes.
§ 63.10(b)(2) (xiii)RecordsYes.
§ 63.10(b)(2)(xiv) RecordsYes.
§ 63.10(b)(3) RecordsYes.
§ 63.10(c)(1)-(6), (9)-(14) RecordsOnly for CEMS; requirements for CPMS are specified in referenced subpart SS of this part.
§ 63.10(c)(7)-(8), (15) RecordsNo. Recordkeeping requirements are specified in § 63.8080 .
§ 63.10(d)(1) General Reporting RequirementsYes.
§ 63.10(d)(2) Report of Performance Test ResultsYes.
§ 63.10(d)(3) Reporting Opacity or VE ObservationsNo. This subpart does not contain opacity or VE limits.
§ 63.10(d)(4) Progress ReportsYes.
§ 63.10(d)(5)(i) SSM ReportsNo. Before the compliance date specified in § 63.7995(e) , see § 63.8075(e)(5) and (6) for the SSM reporting requirements. On and after the compliance date specified in § 63.7995(e) , these requirements no longer apply.
§ 63.10(d)(5)(ii) Immediate SSM reportsNo.
§ 63.10(e)(1)-(2) Additional CMS ReportsOnly for CEMS, but § 63.10(e)(2)(ii) does not apply because this subpart does not require COMS.
§ 63.10(e)(3) ReportsNo. Reporting requirements are specified in § 63.8075 .
§ 63.10(e)(3)(i)-(iii) ReportsNo. Reporting requirements are specified in § 63.8075 .
§ 63.10(e)(3)(iv)-(v) Excess Emissions ReportsNo. Reporting requirements are specified in § 63.8075 .
§ 63.10(e)(3) (vi-viii)Excess Emissions Report and Summary ReportNo. Reporting requirements are specified in § 63.8075 .
§ 63.10(e)(4) Reporting COMS dataNo. This subpart does not contain opacity or VE limits.
§ 63.10(f) Waiver for Recordkeeping/ReportingYes.
§ 63.11 Control and work practice requirementsYes.
§ 63.12 DelegationYes.
§ 63.13 AddressesYes.
§ 63.14 Incorporation by ReferenceYes.
§ 63.15 Availability of InformationYes.

40 C.F.R. 63.1662-63 app Table 10 to Subpart HHHHH of Part 63

85 FR 49749, Aug. 14, 2020, as amended at 85 FR 73914, Nov. 19, 2020
85 FR 49749, 8/14/2020; 85 FR 73914, 1/19/2021