Current through October 31, 2024
Section 60.39f - Recordkeeping guidelinesFor approval, a state plan must include the recordkeeping provisions in this section.
(a) Except as provided in § 60.38f(d)(2) , each owner or operator of an MSW landfill subject to the provisions of § 60.33f(e) must keep for at least 5 years up-to-date, readily accessible, on-site records of the design capacity report that triggered § 60.33f(e) , the current amount of solid waste in-place, and the year-by-year waste acceptance rate. Off-site records may be maintained if they are retrievable within 4 hours. Either paper copy or electronic formats are acceptable.(b) Except as provided in § 60.38f(d)(2) , each owner or operator of a controlled landfill must keep up-to-date, readily accessible records for the life of the control system equipment of the data listed in paragraphs (b)(1) through (5) of this section as measured during the initial performance test or compliance determination. Records of subsequent tests or monitoring must be maintained for a minimum of 5 years. Records of the control device vendor specifications must be maintained until removal. (1) Where an owner or operator subject to the provisions of this subpart seeks to demonstrate compliance with § 60.33f(b) : (i) The maximum expected gas generation flow rate as calculated in § 60.36f(a)(1) . The owner or operator may use another method to determine the maximum gas generation flow rate, if the method has been approved by the Administrator.(ii) The density of wells, horizontal collectors, surface collectors, or other gas extraction devices determined using the procedures specified in § 60.40f(a)(1) .(2) Where an owner or operator subject to the provisions of this subpart seeks to demonstrate compliance with § 60.33f(c) through use of an enclosed combustion device other than a boiler or process heater with a design heat input capacity equal to or greater than 44 megawatts: (i) The average temperature measured at least every 15 minutes and averaged over the same time period of the performance test.(ii) The percent reduction of NMOC determined as specified in § 60.33f(c)(2) achieved by the control device.(3) Where an owner or operator subject to the provisions of this subpart seeks to demonstrate compliance with § 60.33f(c)(2)(i) through use of a boiler or process heater of any size: A description of the location at which the collected gas vent stream is introduced into the boiler or process heater over the same time period of the performance testing.(4) Where an owner or operator subject to the provisions of this subpart seeks to demonstrate compliance with § 60.33f(c)(1) through use of a non-enclosed flare, the flare type (i.e., steam-assisted, air-assisted, or non-assisted), all visible emission readings, heat content determination, flow rate or bypass flow rate measurements, and exit velocity determinations made during the performance test as specified in § 60.18 ; and continuous records of the flare pilot flame or flare flame monitoring and records of all periods of operations during which the pilot flame or the flare flame is absent.(5) Where an owner or operator subject to the provisions of this subpart seeks to demonstrate compliance with § 60.33f(c)(3) through use of a landfill gas treatment system: (i)Bypass records. Records of the flow of landfill gas to, and bypass of, the treatment system.(ii)Site-specific treatment monitoring plan, to include: (A) Monitoring records of parameters that are identified in the treatment system monitoring plan and that ensure the treatment system is operating properly for each intended end use of the treated landfill gas. At a minimum, records should include records of filtration, de-watering, and compression parameters that ensure the treatment system is operating properly for each intended end use of the treated landfill gas.(B) Monitoring methods, frequencies, and operating ranges for each monitored operating parameter based on manufacturer's recommendations or engineering analysis for each intended end use of the treated landfill gas.(C) Documentation of the monitoring methods and ranges, along with justification for their use.(D) Identify who is responsible (by job title) for data collection.(E) Processes and methods used to collect the necessary data.(F) Description of the procedures and methods that are used for quality assurance, maintenance, and repair of all continuous monitoring systems.(c) Except as provided in § 60.38f(d)(2) , each owner or operator of a controlled landfill subject to the provisions of this subpart must keep for 5 years up-to-date, readily accessible continuous records of the equipment operating parameters specified to be monitored in § 60.37f as well as up-to-date, readily accessible records for periods of operation during which the parameter boundaries established during the most recent performance test are exceeded. (1) The following constitute exceedances that must be recorded and reported under § 60.38f : (i) For enclosed combustors except for boilers and process heaters with design heat input capacity of 44 megawatts (150 million British thermal unit per hour) or greater, all 3-hour periods of operation during which the average temperature was more than 28 degrees Celsius (82 degrees Fahrenheit) below the average combustion temperature during the most recent performance test at which compliance with § 60.33f(c) was determined.(ii) For boilers or process heaters, whenever there is a change in the location at which the vent stream is introduced into the flame zone as required under paragraph (b)(3) of this section.(2) Each owner or operator subject to the provisions of this subpart must keep up-to-date, readily accessible continuous records of the indication of flow to the control system and the indication of bypass flow or records of monthly inspections of car-seals or lock-and-key configurations used to seal bypass lines, specified under § 60.37f .(3) Each owner or operator subject to the provisions of this subpart who uses a boiler or process heater with a design heat input capacity of 44 megawatts or greater to comply with § 60.33f(c) must keep an up-to-date, readily accessible record of all periods of operation of the boiler or process heater. (Examples of such records could include records of steam use, fuel use, or monitoring data collected pursuant to other state, local, tribal, or federal regulatory requirements.)(4) Each owner or operator seeking to comply with the provisions of this subpart by use of a non-enclosed flare must keep up-to-date, readily accessible continuous records of the flame or flare pilot flame monitoring specified under § 60.37f(c) , and up-to-date, readily accessible records of all periods of operation in which the flame or flare pilot flame is absent.(5) Each owner or operator of a landfill seeking to comply with § 60.33f(e) using an active collection system designed in accordance with § 60.33f(b) must keep records of periods when the collection system or control device is not operating.(d) Except as provided in § 60.38f(d)(2) , each owner or operator subject to the provisions of this subpart must keep for the life of the collection system an up-to-date, readily accessible plot map showing each existing and planned collector in the system and providing a unique identification location label on each collector that matches the labeling on the plot map. (1) Each owner or operator subject to the provisions of this subpart must keep up-to-date, readily accessible records of the installation date and location of all newly installed collectors as specified under § 60.36f(b) .(2) Each owner or operator subject to the provisions of this subpart must keep readily accessible documentation of the nature, date of deposition, amount, and location of asbestos-containing or nondegradable waste excluded from collection as provided in § 60.40f(a)(3)(i) as well as any nonproductive areas excluded from collection as provided in § 60.40f(a)(3)(ii) .(e) Except as provided in § 60.38f(d)(2) , each owner or operator subject to the provisions of this subpart must keep for at least 5 years up-to-date, readily accessible records of the items in paragraphs (e)(1) through (5) of this section. Each owner or operator that chooses to comply with the provisions in §§ 63.1958 , 63.1960 , and 63.1961 of this chapter, as allowed in §§ 60.34f , 60.36f , and 60.37f , must keep the records in paragraph (e)(6) of this section and must keep records according to § 63.1983(e)(1) through (5) of this chapter in lieu of paragraphs (e)(1) through (5) of this section. (1) All collection and control system exceedances of the operational standards in § 60.34f , the reading in the subsequent month whether or not the second reading is an exceedance, and the location of each exceedance.(2) Each owner or operator subject to the provisions of this subpart must also keep records of each wellhead temperature monitoring value of 55 degrees Celsius (131 degrees Fahrenheit) or above, each wellhead nitrogen level at or above 20 percent, and each wellhead oxygen level at or above 5 percent.(3) For any root cause analysis for which corrective actions are required in § 60.36f(a)(3) or (5) , keep a record of the root cause analysis conducted, including a description of the recommended corrective action(s) taken, and the date(s) the corrective action(s) were completed.(4) For any root cause analysis for which corrective actions are required in § 60.36f(a)(3)(ii) or (a)(5)(ii) , keep a record of the root cause analysis conducted, the corrective action analysis, the date for corrective action(s) already completed following the positive pressure reading or high temperature reading, and, for action(s) not already completed, a schedule for implementation, including proposed commencement and completion dates.(5) For any root cause analysis for which corrective actions are required in § 60.36f(a)(3)(iii) or (a)(5)(iii) , keep a record of the root cause analysis conducted, the corrective action analysis, the date for corrective action(s) already completed following the positive pressure reading or high temperature reading, for action(s) not already completed, a schedule for implementation, including proposed commencement and completion dates, and a copy of any comments or final approval on the corrective action analysis or schedule from the regulatory agency.(6) Each owner or operator that chooses to comply with the provisions in §§ 63.1958 , 63.1960 , and 63.1961 of this chapter, as allowed in §§ 60.34f , 60.36f , and 60.37f , must keep records of the date upon which the owner or operator started complying with the provisions in §§ 63.1958 , 63.1960 , and 63.1961 .(f) Landfill owners or operators who convert design capacity from volume to mass or mass to volume to demonstrate that landfill design capacity is less than 2.5 million megagrams or 2.5 million cubic meters, as provided in the definition of "design capacity", must keep readily accessible, on-site records of the annual recalculation of site-specific density, design capacity, and the supporting documentation. Off-site records may be maintained if they are retrievable within 4 hours. Either paper copy or electronic formats are acceptable.(g) Landfill owners or operators seeking to demonstrate that site-specific surface methane emissions are below 500 parts per million by conducting surface emission monitoring under the Tier 4 procedures specified in § 60.35f(a)(6) must keep for at least 5 years up-to-date, readily accessible records of all surface emissions monitoring and information related to monitoring instrument calibrations conducted according to sections 8 and 10 of Method 21 of appendix A of this part, including all of the following items: (1) Calibration records: (i) Date of calibration and initials of operator performing the calibration.(ii) Calibration gas cylinder identification, certification date, and certified concentration.(iii) Instrument scale(s) used.(iv) A description of any corrective action taken if the meter readout could not be adjusted to correspond to the calibration gas value.(v) If an owner or operator makes their own calibration gas, a description of the procedure used.(2) Digital photographs of the instrument setup. The photographs must be time and date-stamped and taken at the first sampling location prior to sampling and at the last sampling location after sampling at the end of each sampling day, for the duration of the Tier 4 monitoring demonstration.(3) Timestamp of each surface scan reading: (i) Timestamp should be detailed to the nearest second, based on when the sample collection begins.(ii) A log for the length of time each sample was taken using a stopwatch (e.g., the time the probe was held over the area).(4) Location of each surface scan reading. The owner or operator must determine the coordinates using an instrument with an accuracy of at least 4 meters. Coordinates must be in decimal degrees with at least five decimal places.(5) Monitored methane concentration (parts per million) of each reading.(6) Background methane concentration (parts per million) after each instrument calibration test.(7) Adjusted methane concentration using most recent calibration (parts per million).(8) For readings taken at each surface penetration, the unique identification location label matching the label specified in paragraph (d) of this section.(9) Records of the operating hours of the gas collection system for each destruction device.(h) Except as provided in § 60.38f(d)(2) , each owner or operator subject to the provisions of this subpart must keep for at least 5 years up-to-date, readily accessible records of all collection and control system monitoring data for parameters measured in § 60.37f(a)(1), (2), and (3) .(i) Any records required to be maintained by this subpart that are submitted electronically via the EPA's CDX may be maintained in electronic format.(j) For each owner or operator reporting leachate or other liquids addition under § 60.38f(l) , keep records of any engineering calculations or company records used to estimate the quantities of leachate or liquids added, the surface areas for which the leachate or liquids were applied, and the estimates of annual waste acceptance or total waste in place in the areas where leachate or liquids were applied. 81 FR 59313 , Aug. 29, 2016, as amended at 85 FR 17260 , Mar. 26, 2020 81 FR 59313, 10/28/2016; as amended at 85 FR 17260, 3/26/2020