Transportation Conformity Emissions Budgets for the Washington, DC-MD-VA Area
Type of control strategy SIP | Year | VOC (TPD) | NOX (TPD) | Effective date of adequacy determination or SIP approval |
Rate of Progress Plan | 2008 | 70.8 | 159.8 | September 21, 2009 (74 FR 45853), published September 4, 2009. |
Transportation Conformity Emissions Budgets for the Washington, DC-MD-VA Area
Type of control strategy SIP | Year | VOC (TPD) | NOX (TPD) | Effective date of adequacy determination or SIP approval |
Attainment Demonstration | 2009 | 66.5 | 146.1 | February 22, 2013 (78 FR 9044), published February 7, 2013. |
Contingency Measures Plan | 2010 | 144.3 | February 22, 2013 (78 FR 9044), published February 7, 2013. |
Table 3 to Paragraph (m)-Motor Vehicle Emissions Budgets for the Washington, DC-MD-VA Area
Type of control strategy SIP | Year | VOC (TPD) | NOX (TPD) | Effective date of adequacy determination of SIP approval |
Maintenance Plan | 2014 2025 2030 | 61.3 33.2 24.1 | 136.8 40.7 27.4 | 5/15/2019. |
Table 4 to Paragraph (m)-Motor Vehicle Emissions Budgets With Transportation Buffers for the Washington, DC-MD-VA Area
Type of control strategy SIP | Year | VOC (TPD) | NOX (TPD) | Effective date of adequacy determination of SIP approval |
Maintenance Plan | 2014 2025 2030 | 61.3 39.8 28.9 | 136.8 48.8 32.9 | Contingent and effective upon interagency consultation. |
40 C.F.R. §52.2428