Table 1 to Paragraph (c)-EPA-Approved South Carolina Laws and Regulations
State citation | Title/subject | State effective date | EPA approval date | Explanation |
Regulation No. 62.1 | Definitions and General Requirements | |||
Section I | Definitions | 4/24/2020 | 10/28/2021, 86 FR 59641 | |
Section II | Permit Requirements | 6/24/2005 | 6/2/2008, 73 FR 31369 | Except for Section II.L, approved on October 13, 2022 with a state effective date of September 23, 2016. |
Section III | Emissions Inventory and Emissions Statement | 4/24/2020 | 5/9/2022, 87 FR 27528 | |
Section IV | Source Tests | 6/27/2014 | 8/21/2017, 82 FR 39537 | |
Section V | Credible Evidence | 4/24/2020 | 5/9/2022, 87 FR 27528 | |
Regulation No. 62.2 | Prohibition of Open Burning | 12/27/2013 | 6/25/2018, 83 FR 29455 | |
Regulation No. 62.3 | Air Pollution Episodes | |||
Section I | Episode Criteria | 4/26/2013 | 8/21/2017, 82 FR 39541 | |
Section II | Emission Reduction Requirements | 4/22/1988 | 10/3/1989, 54 FR 40659 | |
Regulation No. 62.4 | Hazardous Air Pollution Conditions | 12/20/1978 | 1/29/1980, 45 FR 6572 | |
Regulation No. 62.5 | Air Pollution Control Standards | |||
Standard No. 1 | Emissions from Fuel Burning Operations | |||
Section I | Visible Emissions | 9/23/2016 | 10/13/2022, 87 FR 62037 | |
Section II | Particulate Matter Emissions | 6/27/2014 | 6/25/2018, 83 FR 29455 | |
Section III | Sulfur Dioxide Emissions | 6/27/2014 | 6/25/2018, 83 FR 29455 | |
Section IV | Opacity Monitoring Requirements | 9/23/2016 | 9/18/2020, 85 FR 58283 | |
Section V | Exemptions | 5/24/1985 | 10/3/1989, 54 FR 40659 | |
Section VI | Periodic Testing | 6/27/2014 | 6/25/2018, 83 FR 29455 | |
Standard No. 2 | Ambient Air Quality Standards | 4/24/2020 | 9/30/2021, 86 FR 54105 | |
Standard No. 4 | Emissions From Process Industries | |||
Section I | General | 2/28/1986 | 2/17/1987, 52 FR 4772 | |
Section II | Sulfuric Acid Manufacturing | 6/27/2014 | 6/25/2018, 83 FR 29455 | |
Section III | Kraft Pulp and Paper Manufacturing Plants | 6/27/2014 | 6/25/2018, 83 FR 29455 | |
Section V | Cotton Gins | 6/27/2014 | 6/25/2018, 83 FR 29455 | |
Section VI | Hot Mix Asphalt Manufacturing | 5/24/1985 | 10/3/1989, 54 FR 40659 | |
Section VII | Metal Refining | 2/28/1986 | 2/17/1987, 52 FR 4772 | |
Section VIII | Other Manufacturing | 6/24/2016 | 6/25/2018, 83 FR 29455 | |
Section IX | Total Reduced Sulfur Emissions of Kraft Pulp Mills | 9/23/2016 | 10/13/2022, 87 FR 62034 | |
Section X | Non-Enclosed Operations | 4/22/1988 | 7/2/1990, 55 FR 27226 | |
Section XI | Total Reduced Sulfur Emissions of Kraft Pulp Mills | 9/23/2016 | 10/13/2022, 87 FR 62037 | |
Section XII | Periodic Testing | 6/24/2016 | 6/25/2018, 83 FR 29455 | |
Standard No. 5 | Volatile Organic Compounds | |||
Section I | General Provisions | |||
Part A | Definitions | 4/26/2013 | 8/16/2017, 82 FR 38825 | |
Part B | General Applicability | 10/26/2001 | 5/7/2002, 67 FR 30594 | |
Part C | Alternatives and Exceptions to Control Requirements | 10/26/2001 | 5/7/2002, 67 FR 30594 | |
Part D | Compliance Schedules | 10/26/2001 | 5/7/2002, 67 FR 30594 | |
Part E | Volatile Organic Compound Compliance Testing | 6/26/1998 | 8/10/2004, 69 FR 48395 | |
Part F | Recordkeeping, Reporting, Monitoring | 10/26/2001 | 5/7/2002, 67 FR 30594 | |
Part G | Equivalency Calculations | 4/26/2013 | 8/16/2017, 82 FR 38825 | |
Section II | Provisions for Specific Sources | |||
Part A | Surface Coating of Cans | 11/27/2015 | 8/16/2017, 82 FR 38825 | |
Part B | Surface Coating of Coils | 11/27/2015 | 8/16/2017, 82 FR 38825 | |
Part C | Surface Coating of Paper, Vinyl, and Fabric | 8/24/1990 | 2/4/1992, 57 FR 4158 | |
Part D | Surface Coating of Metal Furniture and Large Appliances | 8/24/1990 | 2/4/1992, 57 FR 4158 | |
Part E | Surface Coating of Magnet Wire | 10/26/2001 | 5/7/2002, 67 FR 30594 | |
Part F | Surface Coating of Miscellaneous Metal Parts and Products | 10/26/2001 | 5/7/2002, 67 FR 30594 | |
Part G | Surface Coating of Flat Wood Paneling | 2/25/1983 | 10/31/1983, 48 FR 50078 | |
Part H | Graphic Arts-Rotogravure Flexography | 2/25/1983 | 10/31/1983, 48 FR 50078 | |
Part N | Solvent Metal Cleaning | 10/26/2001 | 5/7/2002, 67 FR 30594 | |
Part O | Petroleum Liquid Storage in Fixed Roof Tanks | 2/25/1983 | 10/31/1983, 48 FR 50078 | |
Part P | Petroleum Liquid Storage in External Floating Roof Tanks | 2/25/1983 | 10/31/1983, 48 FR 50078 | |
Part Q | Manufacture of Synthesized Pharmaceutical Products | 4/26/2013 | 8/16/2017, 82 FR 38825 | |
Part R | Manufacture of Pneumatic Rubber Tires | 2/25/1983 | 10/31/1983, 48 FR 50078 | |
Part S | Cutback Asphalt | 6/13/1979 | 12/16/1981, 46 FR 61268 | |
Part T | Bulk Gasoline Terminals and Vapor Collection Systems | 2/25/1983 | 10/31/1983, 48 FR 50078 | |
Standard No. 5.2 | Control of Oxides of Nitrogen (NOX) | 6/25/2004 | 8/26/2005, 70 FR 50195 | |
Standard No. 7 | Prevention of Significant Deterioration | 11/26/2021 | 10/4/2023, 88 FR 68468 | |
Standard No. 7.1 | Nonattainment New Source Review | 11/26/2021 | 10/4/2023, 88 FR 68468 | Except for the ethanol production facilities exclusion in paragraphs (A)(11)(t) and (B)(22)(c)(xx). |
Regulation No. 62.6 | Control of Fugitive Particulate Matter | |||
Section I | Control of Fugitive Particulate Matter in Non-Attainment Areas | 11/27/2015 | 8/21/2017, 82 FR 39541 | |
Section II | Control of Fugitive Particulate Matter in Problem Areas | 5/24/1985 | 10/3/1989, 54 FR 40659 | |
Section III | Control of Fugitive Particulate Matter Statewide | 12/27/2013 | 8/21/2017, 82 FR 39541 | |
Section IV | Effective Date | 5/24/1985 | 10/3/1989, 54 FR 40659 | |
Regulation No. 62.7 | Good Engineering Practice Stack Height | |||
Section I | General | 5/23/1986 | 5/28/1987, 52 FR 19858 | |
Section II | Applicability | 5/23/1986 | 5/28/1987, 52 FR 19858 | |
Section III | Definitions and Conditions | 5/23/1986 | 5/28/1987, 52 FR 19858 | |
Section IV | Public Participation | 5/23/1986 | 5/28/1987, 52 FR 19858 | |
Regulation No. 62.96 | Nitrogen Oxides (NOX) Budget Program | 1/25/2019 | 7/29/2020, 85 FR 45541 | |
Regulation No. 62.97 | Cross-State Air Pollution Rule (CSAPR) Trading Program | 8/25/2017 | 10/13/2017, 82 FR 47936 | |
Regulation No. 62.99 | Nitrogen Oxides (NOX) Budget Program Requirements for Stationary Sources Not in the Trading Program | 5/24/2002 | 6/28/2002, 67 FR 43546 | |
S.C. Code Ann | Ethics Reform Act | |||
Section 8-13-100(31) | Definitions | 1/1/1992 | 8/1/2012, 77 FR 45492 | |
Section 8-13-700(A) and (B) | Use of official position or office for financial gain; disclosure of potential conflict of interest | 1/1/1992 | 8/1/2012, 77 FR 45492 | |
Section 8-13-730 | Membership on or employment by regulatory agency of person associated with regulated business | 1/1/1992 | 8/1/2012, 77 FR 45492 |
Table 2 to Paragraph (d)-EPA-Approved South Carolina State Source-Specific Requirements
Name of source | Permit No. | State effective date | EPA approval date | Comments |
Transcontinental Gas Pipeline Corporation Station 140 | 2060-0179-CD | 4/27/2004 | 4/23/2009, 74 FR 18471 | This permit is incorporated in fulfillment of the NOx SIP Call Phase II requirements for South Carolina. |
Provision | State effective date | EPA approval date | Explanation |
Cherokee County Ozone Attainment Demonstration and Ten-year Maintenance Plan | 6/26/1998 | 12/18/1998, 63 FR 70019 | |
Cherokee County Ozone Ten Year Maintenance Plan | 1/31/2002 | 4/26/2002, 67 FR 20647 | |
Transportation Conformity | 10/24/2003 | 1/29/2004, 69 FR 4245 | |
Attainment Demonstration for the Appalachian, Catawba, Pee Dee, Waccamaw, Santee Lynches, Berkeley-Charleston-Dorchester, Low Country, Lower Savannah, Central Midlands, and Upper Savannah Early Action Compact Areas | 6/25/2004 | 8/26/2005, 70 FR 50195 | |
South Carolina Transportation Conformity Air Quality Implementation Plan | 11/19/2008 | 7/28/2009, 74 FR 37168 | |
Cherokee County 110(a)(1) Maintenance Plan for the 1997 8-Hour Ozone Standard | 12/13/2007 | 7/31/2009, 74 FR 26099 | |
South Carolina 110(a)(1) and (2) Infrastructure Requirements for the 1997 8-Hour Ozone National Ambient Air Quality Standards | 12/13/2007 | 07/13/2011, 76 FR 41111 | For the 1997 8-hour ozone NAAQS. |
Applicability of Reasonably Available Control Technology for the Portion of York County, South Carolina | 8/31/2007 | 11/28/11 76 FR 72844 | Demonstration for Bowater Coated Paper Division; for Cytec Carbon Fibers; and for Georgia-Pacific-Catawba Hardboard Plant. |
Negative Declaration for Applicability of Groups I Control Techniques Guidelines for York County, South Carolina | 8/31/2007 | 11/28/11 76 FR 72844 | Applicable to the 1997 8-hour Ozone boundary in York County only (Rock Hill-Fort Mill Area Transportation Study Metropolitan Planning Organization Area). |
Negative Declaration for Applicability of Group II Control Techniques Guidelines for York County, South Carolina | 8/31/2007 | 11/28/11 76 FR 72844 | Applicable to the 1997 8-hour Ozone boundary in York County only (Rock Hill-Fort Mill Area Transportation Study Metropolitan Planning Organization Area). |
Negative Declaration for Applicability of Group III Control Techniques Guidelines for York County, South Carolina | 2/23/2009 | 11/28/11 76 FR 72844 | Applicable to the 1997 8-hour Ozone boundary in York County only (Rock Hill-Fort Mill Area Transportation Study Metropolitan Planning Organization Area). |
Negative Declaration for Applicability of Group IV Control Techniques Guidelines for York County, South Carolina | 7/7/2009 | 11/28/11 76 FR 72844 | Applicable to the 1997 8-hour Ozone boundary in York County only (Rock Hill-Fort Mill Area Transportation Study Metropolitan Planning Organization Area). |
South Carolina portion of bi-state Charlotte; 1997 8-Hour Ozone 2002 Base Year Emissions Inventory | 4/29/2010 | 05/18/2012, 77 FR 29540 | Applicable to the 1997 8-hour Ozone boundary in York County only (Rock Hill-Fort Mill Area Transportation Study Metropolitan Planning Organization Area). |
Regional haze plan | 12/17/2007 | 6/28/2012 | 77 FR 38509. |
South Carolina portion of bi-state Charlotte; 1997 8-Hour Ozone Emissions Statement | 4/29/2010 | 6/25/2012, 77 FR 37815 | Applicable to the 1997 8-hour Ozone boundary in York County only (Rock Hill-Fort Mill Area Transportation Study Metropolitan Planning Organization Area). |
110(a)(1) and (2) Infrastructure Requirements for 1997 Fine Particulate Matter National Ambient Air Quality Standards | 4/14/2008 | 8/1/2012, 77 FR 45494 | |
110(a)(1) and (2) Infrastructure Requirements for 2006 Fine Particulate Matter National Ambient Air Quality Standards | 9/18/2009 | 8/1/2012, 77 FR 45494 | |
110(a)(1) and (2) Infrastructure Requirements for 1997 and 2006 Fine Particulate Matter National Ambient Air Quality Standards Elements 110(a)(1) and (2) (E)(ii) and (G) | 4/3/2012 | 8/1/2012, 77 FR 45494 | |
110(a)(2)(D)(i)(I) Infrastructure Requirements for the 2006 24-hour PM2.5 NAAQS | 9/18/2009 | 10/11/2012, 77 FR 61727 | EPA partially disapproved this SIP submission to the extent that it relied on the Clean Air Interstate Rule to meet the 110(a)(2)(D)(i)(I) requirements for the 2006 24-hour PM2.5 NAAQS. |
York County 1997 8-hour ozone reasonable further progress plan | 08/31/07 | 10/15/12, 77 FR 62454 | Original submission. |
Update for York County 1997 8-hour ozone reasonable further progress plan | 4/29/10 | 10/15/12, 77 FR 62454 | Original submission updated to include required 2008 VOC MVEB. |
1997 8-hour ozone Maintenance Plan for the South Carolina portion of the bi-state Charlotte Area | June 1, 2011 | 12/26/12, 77 FR 75862 | Applicable to the 1997 8-hour ozone boundary in York County only (Rock Hill-Fort Mill Area Transportation Study Metropolitan Planning Organization Area). |
110(a)(1) and (2) Infrastructure Requirements for 1997 Fine Particulate Matter National Ambient Air Quality Standards | 4/14/2008 | 4/12/2013, 78 FR 21845 | Addressing element 110(a)(2)(D)(i)(II) prong 3 only |
110(a)(1) and (2) Infrastructure Requirements for 2006 Fine Particulate Matter National Ambient Air Quality Standards | 9/18/2009 | 4/12/2013, 78 FR 21845 | Addressing element 110(a)(2)(D)(i)(II) prong 3 only |
110(a)(1) and (2) Infrastructure Requirements for 1997 Fine Particulate Matter National Ambient Air Quality Standards | 4/14/2008 | 5/7/2014, 79 FR 26149 | Addressing prong 4 of section 110(a)(2)(D)(i) only. |
110(a)(1) and (2) Infrastructure Requirements for 2006 Fine Particulate Matter National Ambient Air Quality Standards | 9/18/2009 | 5/7/2014, 79 FR 26149 | Addressing prong 4 of section 110(a)(2)(D)(i) only. |
110(a)(1) and (2) Infrastructure Requirements for the 2008 8-Hour Ozone National Ambient Air Quality Standards | 7/17/2012 | 3/2/2015, 80 FR 11138 | With the exception of PSD permitting requirements for major sources of sections 110(a)(2)(C) and (J); interstate transport requirements of section 110(a)(2)(D)(i)(I) and (II), and the visibility requirements of section 110(a)(2)(J). |
110(a)(1) and (2) Infrastructure Requirements for the 2008 Lead NAAQS | 9/20/2011 | 3/18/2015 80 FR 14023 | Addressing the PSD permitting requirements of sections 110(a)(2)(C), 110(a)(2)(D)(i)(II) (prong 3) and 110(a)(2)(J) only. |
110(a)(1) and (2) Infrastructure Requirements for the 2008 Ozone NAAQS | 7/17/2012 | 3/18/2015 80 FR 14023 | Addressing the PSD permitting requirements of sections 110(a)(2)(C), 110(a)(2)(D)(i)(II) (prong 3) and 110(a)(2)(J) only. |
110(a)(1) and (2) Infrastructure Requirements for the 2010 NO2 NAAQS | 4/30/2014 | 3/18/2015 80 FR 14023 | Addressing the PSD permitting requirements of sections 110(a)(2)(C), 110(a)(2)(D)(i)(II) (prong 3) and 110(a)(2)(J) only. |
2011 Base Year Emissions Inventory for the South Carolina portion of the bi-state Charlotte 2008 8-Hour Ozone Nonattainment Area | 8/22/2014 | 6/12/2015 80 FR 33417 | |
110(a)(1) and (2) Infrastructure Requirements for the 2008 Ozone NAAQS | 7/17/2012 | 8/12/2015, 80 FR 48259 | Addressing the visibility requirements of 110(a)(2)(J) only. |
110(a)(1) and (2) Infrastructure Requirements for the 2008 Lead National Ambient Air Quality Standards | 9/20/2011 | 9/24/2015, 80 FR 57541 | With the exception of provisions pertaining to PSD permitting requirements in sections 110(a)(2)(C), prong 3 of D(i) and (J). |
2008 8-hour ozone Maintenance Plan for the York County, South Carolina portion of the bi-state Charlotte Area | 4/17/2015 | 12/11/2015, 80 FR 76867 | |
South Carolina Transportation Conformity Air Quality Implementation Plan | 10/23/2015 | 4/5/2016, 81 FR 19498 | |
110(a)(1) and (2) Infrastructure Requirements for the 2010 1-hour SO2 NAAQS | 5/8/2014 | 5/24/2016, 81 FR 32652 | With the exception of interstate transport requirements of section 110(a)(2)(D)(i)(I) and (II) (prongs 1, 2, and 4). |
110(a)(1) and (2) Infrastructure Requirements for the 2010 1-hour NO2 NAAQS | 4/30/2014 | 09/16/2016, 81 FR 63705 | With the exception of sections 110(a)(2)(C), prong 3 of D(i), and (J) and sections 110(a)(2)(D)(i)(I) and (II) (prongs 1, 2, and 4). |
110(a)(1) and (2) Infrastructure Requirements for the 2012 Annual PM2.5 NAAQS | 12/14/2015 | 4/07/2017, 82 FR 16931 | With the exception of section 110(a)(2)(D)(i)(I) and (II) (prongs 1, 2 and 4). |
110(a)(1) and (2) Infrastructure Requirements for the 2010 1-hour NO2 NAAQS | 12/7/2016 | 10/3/2017, 82 FR 45995 | Addressing Prongs 1 and 2 of section 110(a)(2)(D)(i) only. |
December 2012 Regional Haze Progress Report | 12/28/2012 | 10/12/2017, 82 FR 47393 | |
110(a)(1) and (2) Infrastructure Requirements for the 2008 8-hour Ozone NAAQS | 7/17/2012 | 9/24/2018, 83 FR 48239 | Addressing prong 4 of section 110(a)(2)(D)(i)(II) only. |
110(a)(1) and (2) Infrastructure Requirements for the 2010 1-hour NO2 NAAQS | 4/30/2014 | 9/24/2018, 83 FR 48239 | Addressing prong 4 of section 110(a)(2)(D)(i)(II) only. |
110(a)(1) and (2) Infrastructure Requirements for the 2010 1-hour SO2 NAAQS | 5/8/2014 | 9/24/2018, 83 FR 48239 | Addressing prong 4 of section 110(a)(2)(D)(i)(II) only. |
110(a)(1) and (2) Infrastructure Requirements for the 2012 Annual PM2.5 NAAQS | 12/18/2015 | 9/24/2018, 83 FR 48239 | Addressing prong 4 of section 110(a)(2)(D)(i)(II) only. |
Regional Haze Plan Revision | 9/5/2017 | 9/24/2018, 83 FR 48239 | |
110(a)(1) and (2) Infrastructure Requirements for the 2012 Annual PM2.5 NAAQS | 12/14/2015 | 9/25/2018, 83 FR 48390 | Addressing Prongs 1 and 2 of section 110(a)(2)(D)(i)(I) only. |
110(a)(1) and (2) Infrastructure Requirements for the 2010 1-hour SO2 NAAQS | 6/25/2018 | 10/10/2019, 84 FR 54502 | Addressing Prongs 1 and 2 of section 110(a)(2)(D)(i) only. |
110(a)(1) and (2) Infrastructure Requirements for the 2008 8-Hour Ozone NAAQS | 6/18/2018 | 1/2/2020, 85 FR 7 | Addressing prongs 1 and 2 of section 110(a)(2)(D)(i)(I) only. |
110(a)(1) and (2) Infrastructure Requirements for the 2015 8-Hour Ozone NAAQS | 9/7/2018 | 2/6/2020, 85 FR 6810 | With the exception of 110(a)(2)(D)(i)(I) (prongs 1 and 2). |
110(a)(1) and (2) Infrastructure Requirements for the 2015 8-Hour Ozone NAAQS | 9/7/2018 | 12/2/2021, 86 FR 68421 | Addressing Prongs 1 and 2 of section 110(a)(2)(D)(i)(I) only. |
1997 8-hour ozone Maintenance Plan for the Catawba Indian Nation portion of the bi-state Charlotte Area | 7/7/2020 | 1/25/2022, 87 FR 3675 | Applicable only to the Catawba Indian Nation Reservation portion within the 1997 8-hour ozone boundary in York County, South Carolina (within the Rock Hill-Fort Mill Area Transportation Study Metropolitan Planning Organization Area). |
40 C.F.R. §52.2120
For FEDERAL REGISTER citations affecting § 52.2120 , see the List of CFR Sections Affected, which appears in the Finding Aids section of the printed volume and at www.govinfo.gov.