State citation | Title/subject | State effective date | EPA approval date | Additional explanation/ § 52.2063 citation |
Title 25-Environmental Protection Article III-Air Resources | ||||
Chapter 121-General Provisions | ||||
Section 121.1 | Definitions | 1/16/2021 | 8/9/2023, 88 FR 53804 | Added the definition of "synthetic minor facility" |
Section 121.1 | Definitions | 4/23/16 | 5/9/19, 84 FR 20291 | Revises the following definitions: "CEMS-Continuous emission monitoring system," "Major NOX emitting facility," "Major VOC emitting facility," and "Stationary internal combustion engineor stationary reciprocating internal combustion engine." Adds new definitions for the following terms: "Process heater," "Refinery gas," "Regenerative cycle combustion turbine," "Simple cycle combustion turbine," and "Stationary combustion turbine." |
Section 121.1 | Definitions | 12/21/19 | 5/12/21, 86 FR 25953 | Revised definitions for "major facility," "regulated NSR pollutant," and "significant" to address 2016 PM2.5 Implementation Rule requirements. |
Section 121.2 | Purpose | 3/20/72 | 5/31/72, 37 FR 10842 | (c)(1). |
Section 121.3 | Applicability | 3/20/72 | 5/31/72, 37 FR 10842 | (c)(1). |
Section 121.4 | Regional Organization of the Department | 5/23/92 | 12/22/94, 59 FR 65971 | (c)(94). |
Section 121.7 | Prohibition of Air Pollution | 3/20/72 | 5/31/72, 37 FR 10842 | (c)(1). |
Section 121.8 | Compliance responsibilities | 8/13/77 | 12/17/79, 44 FR 73031 | (c)(21); correction published 8/22/80 (45 FR 56060). |
Section 121.9 | Circumvention | 3/20/72 | 5/31/72, 37 FR 10842 | (c)(1). |
Section 121.10 | Existing orders | 3/20/72 | 5/31/72, 37 FR 10842 | (c)(1). |
Section 121.11 | Severability clause | 3/20/72 | 5/31/72, 37 FR 10842 | (c)(1); no longer in PA DEP rules. |
Chapter 122-National Standards of Performance for New Stationary Sources | ||||
Section 122.1 | Purpose | 08/01/79 | 12/14/20, 85 FR 80624 | |
Section 122.2 | Scope | 08/01/79 | 12/14/20, 85 FR 80624 | |
Section 122.3 | Adoption of Standards | 12/26/97 | 12/14/20, 85 FR 80624 | |
Chapter 123-Standards for Contaminants | ||||
Fugitive Emissions | ||||
Section 123.1(a) through (c) | Prohibition of certain fugitive emissions | 8/29/77 | 12/17/79, 44 FR 73031 | (c)(21); Paragraph 123.1(d) is not in the SIP. |
Section 123.2 | Fugitive particulate matter | 8/13/83 | 7/27/84, 49 FR 30183 | (c)(60). |
Particulate Matter Emissions | ||||
Section 123.11 | Combustion units | 3/20/72 | 5/31/72, 37 FR 10842 | (c)(1). |
Appendix A [Graph] | Particulate Matter-Combustion Units | 3/20/72 | 5/31/72, 37 FR 10842 | (c)(1). |
Section 123.12 | Incinerators | 3/20/72 | 5/31/72, 37 FR 10842 | (c)(1). |
Section 123.13(a) through (c) | Processes | 8/27/80 | 11/13/81, 46 FR 55971 | (c)(39); paragraph 123.13(d) is not in the SIP. |
Section 123.14 | Outdoor wood-fired boilers | 10/2/10 | 9/20/11, 76 FR 58116 | New section. |
Appendix B [Graph] | Particulate Matter-Processes Listed in Table 1 | 3/20/72 | 5/31/72, 37 FR 10842 | (c)(1). |
Appendix C [Graph] | Particulate Matter-Processes Not Listed in Table 1 | 3/20/72 | 5/31/72, 37 FR 10842 | (c)(1). |
Sulfur Compound Emissions | ||||
Section 123.21 | General | 3/20/72 | 5/31/72, 37 FR 10842 | (c)(1). |
Section 123.22(a) | Combustion units. [General provisions-air basins and non-air basins] | 07/25/20 | 3/4/22, 87 FR 12405 | Amended sections 123.22(a) 123.22(b), 123.22(c), 123.22(d), 123.22(e), 123.22(f), and 123.22(g). Previous approval July 10, 2014. |
123.22(b) | Combustion units-Erie Air Basin | 08/01/79 | 08/08/79, 44 FR 46465 | (c)(20); correction published 1/23/80 (45 FR 5303). |
123.22(b) | Combustion units-Erie Air Basin | 07/25/20 | 3/4/22,87 FR 12405 | Amended sections 123.22(a) 123.22(b), 123.22(c), 123.22(d), 123.22(e), 123.22(f), and 123.22(g). Previous approval July 10, 2014. |
123.22(c) | Combustion units-Upper Beaver Valley Air Basin | 08/21/82 | 07/05/83, 48 FR 30630 | (c)(53). |
123.22(c) | Combustion units-Upper Beaver Valley Air Basin | 07/25/20 | 3/4/22, 87 FR 12405 | Amended sections 123.22(a) 123.22(b), 123.22(c), 123.22(d), 123.22(e), 123.22(f), and 123.22(g). Previous approval July 10, 2014. |
123.22(d) | Combustion units-Lower Beaver Valley Air Basin | 01/01/81 | 12/16/81, 46 FR 61267 | (c)(40). |
123.22(d) | Combustion units-Lower Beaver Valley Air Basin | 07/25/20 | 3/4/22, 87 FR 12405 | Amended sections 123.22(a) 123.22(b), 123.22(c), 123.22(d), 123.22(e), 123.22(f), and 123.22(g). Previous approval July 10, 2014. |
123.22(e) | Combustion units-Southeast PA Air Basin | 10/01/78 | 06/04/79, 44 FR 31980 | (c)(18). |
123.22(e) | Combustion units-Southeast PA Air Basin | 07/25/20 | 3/4/22, 87 FR 12405 | Amended sections 123.22(a) 123.22(b), 123.22(c), 123.22(d), 123.22(e), 123.22(f), and 123.22(g). Previous approval July 10, 2014. |
Section 123.22(f) | Combustion units-Sampling and testing | 07/25/20 | 3/4/22, 87 FR 12405 | Amended sections 123.22(a) 123.22(b), 123.22(c), 123.22(d), 123.22(e), 123.22(f), and 123.22(g). Previous approval July 10, 2014. |
Section 123.22(g) | Combustion units-Recordkeeping and reporting | 07/25/20 | 3/4/22, 87 FR 12405 | Amended sections 123.22(a) 123.22(b), 123.22(c), 123.22(d), 123.22(e), 123.22(f), and 123.22(g). Previous approval July 10, 2014. |
Figure 4 [Graph] | Sulfur Oxides-Combustion Units | 3/20/72 | 5/31/72, 37 FR 10842 | (c)(1). |
Section 123.24 | Primary zinc smelters | 8/11/75 | 4/30/76, 41 FR 18077 | (c)(14). |
Section 123.25 | Monitoring requirements | 10/27/90 | 6/30/93, 58 FR 34911 | (c)(81). |
Odor Emissions | ||||
Section 123.31 | Limitations | 3/20/72 | 5/31/72, 37 FR 10842 | (c)(1); SIP version of Section 123.31 is different from State version. |
Visible Emissions | ||||
Section 123.41 | Limitations | 3/20/72 | 5/31/72, 37 FR 10842 | (c)(1). |
Section 123.42 (Except paragraph 123.42(4)) | Exceptions | 3/20/72 | 5/31/72, 37 FR 10842 | (c)(1); Paragraph 123.42(4) is declared not in SIP at (c)(21). |
Section 123.43 | Measuring Techniques | 3/20/72 | 5/31/72, 37 FR 10842 | (c)(1). |
Section 123.44 | Limitations of visible fugitive air contaminants from operation of any coke oven battery | 12/27/97 | 6/11/02, 67 FR 39854 | (c)(189). |
Section 123.45 | Alternative opacity limitations | 6/20/81 | 1/19/83, 48 FR 2319 | (c)(48). |
Appendix D [Chart] | Alternate Opacity Limitation-Application | 6/20/81 | 1/19/83, 48 FR 2319 | (c)(48). |
Section 123.46 | Monitoring requirements | 6/20/81 | 1/19/83, 48 FR 2319 | (c)(48). |
Nitrogen Compound Emissions | ||||
Section 123.51 | Monitoring requirements | 10/20/90 | 9/23/92, 57 FR 43905 | (c)(74). |
NOXAllowance Requirements | ||||
Section 123.101 | Purpose | 11/1/97 | 6/6/00, 65 FR 35840 | (c)(145). |
Section 123.102 | Source NOX allowance requirements and NOX allowance control period | 11/1/97 | 6/6/00, 65 FR 35840 | (c)(145). |
Section 123.103 | General NOX allowance provisions | 11/1/97 | 6/6/00, 65 FR 35840 | (c)(145). |
Section 123.104 | Source authorized account representative requirements | 11/1/97 | 6/6/00, 65 FR 35840 | (c)(145). |
Section 123.105 | NATS provisions | 11/1/97 | 6/6/00, 65 FR 35840 | (c)(145). |
Section 123.106 | NOX allowance transfer protocol | 11/1/97 | 6/6/00, 65 FR 35840 | (c)(145). |
Section 123.107 | NOX allowance transfer procedures | 11/1/97 | 6/6/00, 65 FR 35840 | (c)(145). |
Section 123.108 | Source emissions monitoring requirements | 11/1/97 | 6/6/00, 65 FR 35840 | (c)(145). |
Section 123.109 | Source emissions reporting requirements | 11/1/97 | 6/6/00, 65 FR 35840 | (c)(145). |
Section 123.110 | Source compliance requirements | 11/1/97 | 6/6/00, 65 FR 35840 | (c)(145). |
Section 123.111 | Failure to meet source compliance requirements | 11/1/97 | 6/6/00, 65 FR 35840 | (c)(145). |
Section 123.112 | Source operating permit provision requirements | 11/1/97 | 6/6/00, 65 FR 35840 | (c)(145) |
Section 123.113 | Source recordkeeping requirements | 11/1/97 | 6/6/00, 65 FR 35840 | (c)(145). |
Section 123.114 | General NOX allocation provisions | 11/1/97 | 6/6/00, 65 FR 35840 | (c)(145). |
Section 123.115 | Initial NOX allowance NOX allocations | 3/11/00 | 6/6/00, 65 FR 35840 | (c)(145). |
Section 123.116 | Source opt-in provisions | 11/1/97 | 6/6/00, 65 FR 35840 | (c)(145). |
Section 123.117 | New NOX affected source provisions | 11/1/97 | 6/6/00, 65 FR 35840 | (c)(145). |
Section 123.118 | Emission reduction credit provisions | 11/1/97 | 6/6/00, 65 FR 35840 | (c)(145). |
Section 123.119 | Bonus NOX allowance awards | 11/1/97 | 6/6/00, 65 FR 35840 | (c)(145). |
Section 123.120 | Audit | 11/1/97 | 6/6/00, 65 FR 35840 | (c)(145). |
Appendix E [Chart] | Appendix E [NOX Allowances Chart] | 3/11/00 | 6/6/00, 65 FR 35840 | (c)(145). |
Chapter 126-Standard for Motor Fuels | ||||
Subchapter A-Oxygenate Content of Gasoline | ||||
Section 126.101 | General | 8/19/95 | 12/17/99, 64 FR 70589 | (c)(142). |
Section 126.102 | Sampling and testing | 8/19/95 | 12/17/99, 64 FR 70589 | (c)(142). |
Section 126.103 | Recordkeeping and reporting | 8/19/95 | 12/17/99, 64 FR 70589 | (c)(142). |
Section 126.104 | Labeling requirements | 8/19/95 | 12/17/99, 64 FR 70589 | (c)(142). |
Subchapter D-Motor Vehicle Emissions Control Program | ||||
General Provisions | ||||
Section 126.401 | Purpose | 12/9/06 | 1/24/12, 77 FR 3386. | |
Pennsylvania Clean Vehicles Program | ||||
Section 126.411 | General requirements | 12/9/06 | 1/24/12, 77 FR 3386. | |
Section 126.412 | Emission requirements | 12/9/06 | 1/24/12, 77 FR 3386. | |
Section 126.413 | Exemptions | 12/9/06 | 1/24/12, 77 FR 3386. | |
Applicable Motor Vehicle Testing | ||||
Section 126.421 | Exemptions | 12/9/06 | 1/24/12, 77 FR 3386. | |
Section 126.422 | New motor vehicle compliance testing | 12/9/06 | 1/24/12, 77 FR 3386. | |
Section 126.423 | Assembly line testing | 12/9/06 | 1/24/12, 77 FR 3386. | |
Section 126.424 | In-use motor vehicle enforcement testing | 12/9/06 | 1/24/12, 77 FR 3386. | |
Section 126.425 | In-use surveillance testing | 12/9/06 | 1/24/12, 77 FR 3386. | |
Motor Vehicle Manufacturers' Obligations | ||||
Section 126.431 | Warranty and recall | 12/9/06 | 1/24/12, 77 FR 3386. | |
Section 126.432 | Reporting requirements | 12/9/06 | 1/24/12, 77 FR 3386. | |
Motor Vehicle Dealer Responsibilities | ||||
Section 126.441 | Responsibility of motor vehicle dealers | 12/9/06 | 1/24/12, 77 FR 3386. | |
Department Responsibilities | ||||
Section 126.451 | Responsibilities of the Department | 12/9/06 | 1/24/12, 77 FR 3386. | |
Chapter 127-Construction, Modification, Reactivation, and Operation of Sources | ||||
Subchapter A-General | ||||
Section 127.1 | Purpose | 11/26/94 | 7/30/96, 61 FR 39597 | (c)(110)(i)(C). |
Section 127.3 | Operational flexibility | 11/26/94 | 7/30/96, 61 FR 39597 | (c)(110)(i)(C). |
Subchapter B-Plan Approval Requirements | ||||
Section 127.11 | Plan approval requirements | 11/26/94 | 7/30/96, 61 FR 39597 | (c)(110)(i)(C). |
Section 127.11a | Reactivation of sources | 11/26/94 | 7/30/96, 61 FR 39597 | (c)(110)(i)(C). |
Section 127.12 | Content of applications | 11/26/94 | 7/30/96, 61 FR 39597 | (c)(110)(i)(C). |
Section 127.12a | Compliance review | 11/26/94 | 7/30/96, 61 FR 39597 | (c)(110)(i)(C). |
Section 127.12b | Plan Approval Terms and Conditions | 5/24/08 | 10/5/12, 77 FR 60910 | Revised; limited approval. |
Section 127.12c | Plan approval reporting requirements | 11/26/94 | 7/30/96, 61 FR 39597 | (c)(110)(i)(C). |
Section 127.12d | Completeness Determination | 5/24/08 | 10/5/12, 77 FR 60910 | Added; limited approval. |
Section 127.13 | Extensions | 5/19/07 | 5/14/12, 77 FR 28261 | Revised. |
Section 127.13a | Plan approval changes for cause | 11/26/94 | 7/30/96, 61 FR 39597 | (c)(110)(i)(C). |
Section 127.13b | Denial of Plan approval application | 11/26/94 | 7/30/96, 61 FR 39597 | (c)(110)(i)(C). |
Section 127.13c | Notice of basis for certain plan approval decisions | 11/26/94 | 7/30/96, 61 FR 39597 | (c)(110)(i)(C). |
Section 127.14 | Exemptions | 11/26/94 | 7/30/96, 61 FR 39597 | (c)(110)(i)(C). |
Section 127.25 | Compliance requirement | 11/26/94 | 7/30/96, 61 FR 39597 | (c)(110)(i)(C). |
Section 127.32 | Transfer of plan approvals | 11/26/94 | 7/30/96, 61 FR 39597 | (c)(110)(i)(C). |
Section 127.35 | Maximum achievable control technology standards for hazardous air pollutants | 11/26/94 | 7/30/96, 61 FR 39597 | (c)(110)(i)(C). |
Section 127.36 | Health risk-based emission standards and operating practice requirements | 11/26/94 | 7/30/96, 61 FR 39597 | (c)(110)(i)(C). |
Section 127.44 | Public Notice | 5/24/08 | 10/5/12, 77 FR 60910 | Revised; limited approval. |
Section 127.45 | Contents of Notice | 5/24/08 | 10/5/12, 77 FR 60910 | Revised; limited approval. |
Section 127.46 | Filing protests | 8/13/83 | 7/27/84, 49 FR 30183 | (c)(60). |
Section 127.47 | Consideration of protests | 11/26/94 | 7/30/96, 61 FR 39597 | (c)(110)(i)(C). |
Section 127.48 | Conferences and Hearings | 5/24/08 | 10/5/12, 77 FR 60910 | Revised; limited approval. |
Section 127.49 | Conference or hearing procedure | 11/26/94 | 7/30/96, 61 FR 39597 | (c)(110)(i)(C). |
Section 127.50 | Conference or hearing record | 11/26/94 | 7/30/96, 61 FR 39597 | (c)(110)(i)(C). |
Section 127.51 | Plan approval disposition | 11/26/94 | 7/30/96, 61 FR 39597 | (c)(110)(i)(C). |
Subchapter D-Prevention of Significant Deterioration of Air Quality | ||||
Section 127.81 | Purpose | 6/18/83 | 8/21/84, 49 FR 33127 | (c)(57). |
Section 127.82 | Scope | 6/18/83 | 8/21/84, 49 FR 33127 | (c)(57). |
Section 127.83 | Adoption of Program | 6/18/83 | 8/21/84, 49 FR 33127 | (c)(57). |
Subchapter E-New Source Review | ||||
Section 127.201 | General requirements | 9/3/11 | 7/13/12, 78 FR 41276 | Revised. |
Section 127.201a | Measurements, abbreviations and acronyms | 9/3/11 | 7/13/12, 77 FR 41276 | Revised. |
Section 127.202 | Effective date | 12/21/19 | 5/12/21, 86 FR 25953 | Revised to include VOC and ammonia as PM2.5 precursors. Previous approval was July 13, 2012. Docket No. EPA-R03-OAR-2011-0924. |
Section 127.203 | Facilities subject to special permit requirements | 9/3/11 | 7/13/12, 77 FR 41276 | Revised. |
Section 127.203a | Applicability determination | 12/21/19 | 5/12/21, 86 FR 25953 | Revised to include annual and 24-hour levels for "significant air quality impacts for PM2.5." Previous approval was July 13, 2012. Docket No. EPA-R03-OAR-2011-0924. |
Section 127.204 | Emissions subject to this Subchapter | 9/3/11 | 7/13/12, 77 FR 41276 | Revised. |
Section 127.205 | Special permit requirements | 5/19/07 | 5/14/12, 77 FR 28261 | Revised. |
Section 127.206 | ERC general requirements | 9/3/11 | 7/13/12, 77 FR 41276 | Revised. |
Section 127.207 | Creditable emissions decrease or ERC generation and creation | 5/19/07 | 5/14/12, 77 FR 28261 | Revised. |
Section 127.208 | ERC use and transfer requirements | 5/19/07 | 5/14/12, 77 FR 28261 | Revised. |
Section 127.209 | ERC registry system | 5/19/07 | 5/14/12, 77 FR 28261 | Revised. |
Section 127.210 | Offset ratios | 12/21/19 | 5/12/21, 86 FR 25953 | Revised to include PM2.5 offset ratios for both VOC and ammonia. Previous approval was July 13, 2012. Docket No. EPA-R03-OAR-2011-0924. |
Section 127.212 | Portable facilities | 5/19/07 | 5/14/12, 77 FR 28261 | Revised. |
Section 127.213 | Construction and demolition | 5/19/07 | 5/14/12, 77 FR 28261 | Revised. |
Section 127.215 | Reactivation | 5/19/07 | 5/14/12, 77 FR 28261 | Revised. |
Section 127.216 | Circumvention | 1/15/94 | 12/9/97, 62 FR 64722 | (c)(107). |
Section 127.217 | Clean Air Act Titles III-V applicability | 5/19/07 | 5/14/12, 77 FR 28261 | Revised. |
Section 127.218 | PALs | 5/19/07 | 5/14/12, 77 FR 28261 | New. |
Subchapter F-Operating Permit Requirements | ||||
General | ||||
Section 127.401 | Scope | 11/26/94 | 7/30/96, 61 FR 39597 | (c)(110)(i)(C). |
Section 127.402 | General provisions | 11/26/94 | 7/30/96, 61 FR 39597 | (c)(110)(i)(C). |
Section 127.403 | Permitting of sources operating lawfully without a permit | 11/26/94 | 7/30/96, 61 FR 39597 | (c)(110)(i)(C). |
Section 127.404 | Compliance schedule for repermitting | 11/26/94 | 7/30/96, 61 FR 39597 | (c)(110)(i)(C). |
Permit Applications | ||||
Section 127.411 | Content of applications. | 11/26/94 | 7/30/96, 61 FR 39597 | (c)(110)(i)(C). |
Section 127.412 | Compliance review forms | 11/26/94 | 7/30/96, 61 FR 39597 | (c)(110)(i)(C). |
Section 127.413 | Municipal notification | 11/26/94 | 7/30/96, 61 FR 39597 | (c)(110)(i)(C). |
Section 127.414 | Supplemental information | 11/26/94 | 7/30/96, 61 FR 39597 | (c)(110)(i)(C). |
Review of Applications | ||||
Section 127.421 | Review of Applications | 11/26/94 | 7/30/96, 61 FR 39597 | (c)(110)(i)(C). |
Section 127.422 | Denial of permits | 11/26/94 | 7/30/96, 61 FR 39597 | (c)(110)(i)(C). |
Section 127.423 | Notice of basis for certain operating permit decisions | 11/26/94 | 7/30/96, 61 FR 39597 | (c)(110)(i)(C). |
Section 127.424 | Public Notice | 1/16/2021 | 8/9/2023, 88 FR 53804 | Corrected a cross-reference error in public notice section. |
Section 127.425 | Contents of notice | 11/26/94 | 7/30/96, 61 FR 39597 | (c)(110)(i)(C). |
Section 127.426 | Filing protests | 11/26/94 | 7/30/96, 61 FR 39597 | (c)(110)(i)(C). |
Section 127.427 | Consideration of protest | 11/26/94 | 7/30/96, 61 FR 39597 | (c)(110)(i)(C). |
Section 127.428 | Conferences and hearings | 11/26/94 | 7/30/96, 61 FR 39597 | (c)(110)(i)(C). |
Section 127.429 | Conference or hearing procedure | 11/26/94 | 7/30/96, 61 FR 39597 | (c)(110)(i)(C). |
Section 127.430 | Conference or hearing record | 11/26/94 | 7/30/96, 61 FR 39597 | (c)(110)(i)(C). |
Section 127.431 | Operating permit disposition | 11/26/94 | 7/30/96, 61 FR 39597 | (c)(110)(i)(C). |
Operating Permit Conditions | ||||
Section 127.441 | Operating permit terms and conditions | 11/26/94 | 7/30/96, 61 FR 39597 | (c)(110)(i)(C). |
Section 127.442 | Reporting requirements | 11/26/94 | 7/30/96, 61 FR 39597 | (c)(110)(i)(C). |
Section 127.443 | Operating permit requirements | 11/26/94 | 7/30/96, 61 FR 39597 | (c)(110)(i)(C). |
Section 127.444 | Compliance requirements | 11/26/94 | 7/30/96, 61 FR 39597 | (c)(110)(i)(C). |
Section 127.445 | Operating permit compliance schedules | 11/26/94 | 7/30/96, 61 FR 39597 | (c)(110)(i)(C). |
Section 127.446 | Operating permit duration | 11/26/94 | 7/30/96, 61 FR 39597 | (c)(110)(i)(C). |
Section 127.447 | Alternate operating scenarios | 11/26/94 | 7/30/96, 61 FR 39597 | (c)(110)(i)(C). |
Section 127.448 | Emissions trading at facilities with Federally enforceable emissions cap | 11/26/94 | 7/30/96, 61 FR 39597 | (c)(110)(i)(C). |
Section 127.449 | De minimis emission increases | 11/26/94 | 7/30/96, 61 FR 39597 | (c)(110)(i)(C). |
Section 127.450 | Administrative operating permit amendments | 11/26/94 | 7/30/96, 61 FR 39597 | (c)(110)(i)(C). |
Operating Permit Modifications | ||||
Section 127.461 | Operating permit changes for cause | 11/26/94 | 7/30/96, 61 FR 39597 | (c)(110)(i)(C). |
Section 127.462 | Minor operating permit modifications | 11/26/94 | 7/30/96, 61 FR 39597 | (c)(110)(i)(C). |
Section 127.463 | Operating permit revisions to incorporate applicable standards | 11/26/94 | 7/30/96, 61 FR 39597 | (c)(110)(i)(C). |
Section 127.464 | Transfer of operating permits | 11/26/94 | 7/30/96, 61 FR 39597 | (c)(110)(i)(C). |
Section 127.465 | Significant operating permit modification procedures | 1/16/2021 | 8/9/2023,88 FR 53804 | Added section 127.465 to establish the procedures the owner or operator of a stationary air contamination source or facility shall follow to make a significant modification to an applicable operating permit |
Subchapter H-General Plan Approvals and Operating Permits | ||||
General | ||||
Section 127.601 | Scope | 11/26/94 | 7/30/96, 61 FR 39594 | (c)(111). |
Issuance of General Plan Approvals and General Operating Permits | ||||
Section 127.611 | General plan approvals and general operating permits | 11/26/94 | 7/30/96, 61 FR 39594 | (c)(111). |
Section 127.612 | Public notice and review period | 11/26/94 | 7/30/96, 61 FR 39594 | (c)(111). |
Use of General Plan Approvals and Permits | ||||
Section 127.621 | Application for use of general plan approvals and general operating permits | 11/26/94 | 7/30/96, 61 FR 39594 | (c)(111). |
Section 127.622 | Compliance with general plan approvals and general operating permits | 11/26/94 | 7/30/96, 61 FR 39594 | (c)(111). |
Subchapter I-Plan Approval and Operating Permit Fees | ||||
Section 127.701 | General provisions | 12/14/13 | 3/27/15, 80 FR 16286 | Paragraphs (b) and (c) revised. |
Section 127.702 | Plan approval fees | 1/16/2021 | 8/9/2023, 88 FR 53804 | Amended section 127.702 |
Section 127.703 | Operating permit fees under subchapter F | 1/16/2021 | 8/9/2023, 88 FR 53804 | Amended section 127.703 |
Section 127.707 | Failure to pay fee | 11/26/94 | 7/30/96, 61 FR 39597 | (c)(110)(i)(C). |
Section 127.709 | Fees for requests for determination | 1/16/2021 | 8/9/2023, 88 FR 53804 | Added section 127.709 to establish fees for requests for determination |
Section 127.710 | Fees for the use of general plan approvals and general operating permits under Subchapter H. | 1/16/2021 | 8/9/2023, 88 FR 53804 | Added section 127.710 to establish application fees for the use of general plan approvals and general operating permits for stationary or portable sources |
Subchapter J-General Conformity | ||||
Section 127.801 | Purpose | 11/9/96 | 9/29/97, 62 FR 50870 | (c)(126). |
Section 127.802 | Adoption of Standards | 11/9/96 | 9/29/97, 62 FR 50870 | (c)(126). |
Chapter 129-Standards for Sources | ||||
Miscellaneous Sources | ||||
Section 129.11 | Nitric acid plants | 3/20/72 | 5/31/72, 37 FR 10842 | (c)(1). |
Section 129.12 | Sulfuric acid plants | 3/20/72 | 5/31/72, 37 FR 10842 | (c)(1). |
Section 129.13 | Sulfur recovery plants | 3/20/72 | 5/31/72, 37 FR 10842 | (c)(1). |
APPENDIX A | Allowable emissions, sulfur oxides-sulfur recovery plants | 4/23/94 | 3/23/98, 63 FR 13789 | (c)(129). |
Section 129.14 | Open burning operations | 8/9/76 | 8/19/80, 45 FR 55178 | (c)(33). |
Section 129.15 | Coke pushing operations | 8/29/77,12/31/77 | 12/17/79, 44 FR 73031 | (c)(21); correction published 8/22/80, 45 FR 56060. |
Section 129.16 | Door maintenance, adjustment and replacement practices | 12/12/77 | 7/17/79, 44 FR 41429 | (c)(19). |
Section 129.18 | Municipal waste incinerators | 10/27/90 | 6/30/93, 58 FR 34911 | (c)(81). |
Sources of VOCs | ||||
Section 129.51 | General | 8/11/18 | 8/16/2024, 89 FR 66602 | After reconsideration of previous approval, removing references to Section 129.63a. |
Section 129.52 | Surface coating processes | 10/22/16 | 8/10/18, 83 FR 39604 | Revised 129.52(g) and added Subsection 129.52(k) . |
Section 129.52a | Control of VOC emissions from large appliance and metal furniture surface coating processes | 9/11/10 | 8/24/2011, 76 FR 52870 | New section is added. |
Section 129.52b | Control of VOC emissions from paper, film, and foil surface coating processes | 11/20/10 | 5/23/11, 76 FR 29649 | New section is added. |
Section 129.52c | Control of VOC emissions from flat wood paneling surface coating processes | 12/18/10 | 6/2/11, 76 FR 31855 | New section is added. |
Section 129.52d | Control of VOCs from Miscellaneous Metal Parts Surface Coating Processes, Miscellaneous Plastic Parts Surface Coating Processes and Pleasure Craft Surface Coatings | 10/22/16 | 8/10/18, 83 FR 39604 | New section 129.52d is added. This section does not remove or replace any permits approved under 52.2020(d). |
Section 129.52e | Control of VOC emissions from automobile and light-duty truck assembly coating operations and heavier vehicle coating operations | 10/22/16 | 3/23/18, 83 FR 12676 | New section is added. This section does not remove or replace any permits approved under 52.2020(d). |
Section 129.54 | Seasonal operation of auxiliary incineration equipment | 8/3/91 | 5/13/93, 58 FR 28362 | (c)(79). |
Section 129.55 | Petroleum refineries-specific sources | 6/20/81 | 1/19/83, 48 FR 2319 | (c)(48). |
Section 129.56 | Storage tanks greater than 40,000 gallons capacity containing VOCs | 9/5/98 | 7/26/00, 65 FR 45920 | (c)(147). |
Section 129.57 | Storage tanks less than or equal to 40,000 gallons capacity containing VOCs | 6/20/81 | 1/19/83, 48 FR 2319 | (c)(48). |
Section 129.58 | Petroleum refineries-fugitive sources | 8/13/83 | 7/27/84, 49 FR 30183 | (c)(60). |
Section 129.59 | Bulk gasoline terminals | 8/3/91 | 5/13/93, 58 FR 28362 | (c)(79). |
Section 129.60 | Bulk gasoline plants | 8/3/91 | 5/13/93, 58 FR 28362 | (c)(79). |
Section 129.61 | Small gasoline storage tank control (Stage I control) | 8/3/91 | 5/13/93, 58 FR 28362 | (c)(79). |
Section 129.62 | General standards for bulk gasoline terminals, bulk gasoline plants, and small gasoline storage tanks | 5/23/94 | 12/22/94, 59 FR 65971 | (c)(94). |
Section 129.63 | Degreasing operations | 12/22/01 | 1/16/03, 68 FR 2208 | (c)(195)(i)(B)(2). |
Section 129.64 | Cutback asphalt paving | 8/13/83 | 7/27/84, 49 FR 30183 | (c)(60). |
Section 129.65 | Ethylene production plants | 8/1/79 | 5/20/80 | (c)(22). |
Section 129.66 | Compliance schedules and final compliance dates | 12/18/10 | 6/2/11, 76 FR 31855 | This section is amended. |
Section 129.67 | Graphic arts systems | 10/22/16 | 8/10/18, 83 FR 39604 | Revised Subsection 129.67(a)(1) . |
129.67a | Control of VOC emissions from flexible package printing presses | 6/28/2014 | 6/25/2015, 80 FR 36482 | Adds section 129.67a . |
129.67b | Control of VOC emissions from offset lithographic printing presses and letterpress printing presses | 6/28/2014 | 6/25/2015, 80 FR 36482 | Adds section 129.67b . |
Section 129.68 | Manufacture of synthesized pharmaceutical products | 8/3/91 | 5/13/93, 58 FR 28362 | (c)(79). |
Section 129.69 | Manufacture of pneumatic rubber tires | 5/23/92 | 12/22/94, 59 FR 65971 | (c)(94). |
Section 129.71 | Synthetic organic chemical and polymer manufacturing-fugitive sources | 5/23/92 | 12/22/94, 59 FR 65971 | (c)(94). |
Section 129.72 | Manufacture of surface active agents | 5/23/92 | 12/22/94, 59 FR 65971 | (c)(94). |
Section 129.73 | Aerospace manufacturing and rework | 8/11/18 | 12/14/20, 85 FR 80624 | Correction to numbering in Table II. |
Section 129.74 | Control of VOC emissions from fiberglass boat manufacturing materials | 12/19/15 | 8/17/16, 81 FR 54744 | New section is added; the requirements of section 129.74 supersede the requirements of a RACT permit issued under sections 129.91-95 prior to December 19, 2015, to the owner or operator of a source subject to section 129.74 to control, reduce or minimize VOCs from a fiberglass boat manufacturing process, except to the extent the RACT permit contains more stringent requirements. |
Section 129.75 | Mobile equipment repair and refinishing | 10/22/16 | 8/10/18, 83 FR 39604 | Revised Subsection 129.75(b)(1) . Previous approval 8/14/00 (c) 148. |
129.77 | Control of emissions from the use or application of adhesives, sealants, primers and solvents | 6/28/2014 | 6/25/2015, 80 FR 36482 | Amends section 129.77 . |
Mobile Sources | ||||
Section 129.81 | Organic liquid cargo vessel loading and ballasting | 9/28/91 | 9/28/93, 58 FR 50517 | (c)(84). |
Section 129.82 | Control of VOCs from gasoline dispensing facilities (Stage II) | 4/10/99 | 5/21/01, 66 FR 27875 | (c)(153). |
Stationary Sources of NOXand VOCs | ||||
Section 129.91 | Control of major sources of NOX and VOCs | 6/10/00 | 7/20/01, 66 FR 37908 | (c)(152). |
Section 129.92 | RACT proposal requirements | 4/23/94 | 3/23/98, 63 FR 13789 | (c)(129). |
Section 129.93 [Except for 129.93(c)(6) &(7)] | Presumptive RACT emission limitations | 4/23/94 | 3/23/98, 63 FR 13789 | (c)(129). |
Section 129.94 | NOX RACT emission averaging general requirements | 4/23/94 | 3/23/98, 63 FR 13789 | (c)(129). |
Section 129.95 | Recordkeeping | 4/23/94 | 3/23/98, 63 FR 13789 | (c)(129). |
Additional RACT Requirements for Major Sources of NOXand VOCs | ||||
Section 129.96 | Applicability | 8/11/18 | 12/14/20, 85 FR 80624 | Subsections (a) and (b) are revised. |
Section 129.97 | Presumptive RACT requirements, RACT emission limitations, and petition for alternative compliance schedule | 4/23/16 | 8/16/2022, 87 FR 50259 | Partial Disapproval. See 40 CFR 52.2023(o) . |
Section 129.98 | Facility-wide or system-wide NOX emissions averaging plan general requirements | 4/23/16 | 5/9/19, 84 FR 20291 | Conditionally approved. See 40 CFR 52.2023(m) . |
Section 129.99 | Alternative RACT proposal and petition for alternative compliance schedule | 8/11/18 | 12/14/20, 85 FR 80624 | Section 129.99(i)(1)(ii) is revised. |
Section 129.100 | Compliance demonstration and recordkeeping requirements | 8/11/18 | 12/14/20, 85 FR 80624 | Section 129.100(a) is revised. |
Wood Furniture Manufacturing Operations | ||||
Section 129.101 | General provisions and applicability | 6/10/00 | 7/20/01, 66 FR 37908 | (c)(152). |
Section 129.102 | Emission standards | 6/10/00 | 7/20/01, 66 FR 37908 | (c)(152). |
Section 129.103 | Work practice standards | 6/10/00 | 7/20/01, 66 FR 37908 | (c)(152). |
Section 129.104 | Compliance procedures and monitoring requirements | 6/10/00 | 7/20/01, 66 FR 37908 | (c)(152). |
Section 129.105 | Recordkeeping requirements | 6/10/00 | 7/20/01, 66 FR 37908 | (c)(152). |
Section 129.106 | Reporting requirements | 6/10/00 | 7/20/01, 66 FR 37908 | (c)(152). |
Section 129.107 | Special provisions for facilities using an emissions averaging approach | 6/10/00 | 7/20/01, 66 FR 37908 | (c)(152). |
Additional NOXRequirements | ||||
Section 129.201 | Boilers | 4/12/08 | 12/10/09, 74 FR 65446 | Revised section. |
Section 129.202 | Stationary combustion turbines | 4/12/08 | 12/10/09, 74 FR 65446 | Revised section. |
Section 129.203 | Stationary internal combustion engines | 12/11/04 | 9/29/06, 71 FR 57428 | SIP-effective date is 10/30/06. |
Section 129.204 | Emission accountability | 4/12/08 | 12/10/09, 74 FR 65446 | Revised section. |
Section 129.205 | Zero emission renewable energy production credit | 12/11/04 | 9/29/06, 71 FR 57428 | SIP-effective date is 10/30/06. |
Control of NOXEmissions From Glass Melting Furnaces | ||||
Section 129.301 | Purpose | 6/19/10 | 8/22/11, 76 FR 52283 | New section |
Section 129.302 | Applicability | 6/19/10 | 8/22/11, 76 FR 52283 | New section |
Section 129.303 | Exemptions | 6/19/10 | 8/22/11, 76 FR 52283 | New section |
Section 129.304 | Emission requirements | 6/19/10 | 8/22/11, 76 FR 52283 | New section |
Section 129.305 | Start-up requirements | 6/19/10 | 8/22/11, 76 FR 52283 | New section |
Section 129.306 | Shutdown requirements | 6/19/10 | 8/22/11, 76 FR 52283 | New section |
Section 129.307 | Idling requirements | 6/19/10 | 8/22/11, 76 FR 52283 | New section |
Section 129.308 | Compliance determination | 6/19/10 | 8/22/11, 76 FR 52283 | New section |
Section 129.309 | Compliance demonstration | 6/19/10 | 8/22/11, 76 FR 52283 | New section |
Section 129.310 | Recordkeeping | 6/19/10 | 8/22/11, 76 FR 52283 | New section |
Chapter 130-Standards for Products | ||||
Subchapter B-Consumer Products | ||||
General Provisions | ||||
Section 130.201 | Applicability | 10/11/08 | 10/18/10, 75 FR 63717 | |
Section 130.202 | Definitions | 10/11/08 | 10/18/10, 75 FR 63717 | |
Standard | ||||
Section 130.211 | Table of standards | 10/11/08 | 10/18/10, 75 FR 63717 | |
Section 130.212 | Products diluted prior to use | 10/5/02 | 12/8/04, 69 FR 70895 | (c)(230). |
Section 130.213 | Products registered under FIFRA | 10/11/08 | 10/18/10, 75 FR 63717 | |
Section 130.214 | Requirements for charcoal lighter materials | 10/11/08 | 10/18/10, 75 FR 63717 | |
Section 130.215 | Requirements for aerosol adhesives | 10/11/08 | 10/18/10, 75 FR 63717 | |
Section 130.216 | Requirements for floor wax strippers | 10/5/02 | 12/8/04, 69 FR 70895 | (c)(230). |
Section 130.217 | Sell-through of products | 10/11/08 | 10/18/10, 75 FR 63717 | Adds section to allow for the sell-through of product manufactured prior to applicable effective dates. |
Exemptions | ||||
Section 130.331 | Products for shipment and use outside this Commonwealth | 10/11/08 | 10/18/10, 75 FR 63717. | |
Section 130.332 | Antiperspirants and deodorants | 10/11/08 | 10/18/10, 75 FR 63717. | |
Section 130.333 | LVP-VOC | 10/5/02 | 12/8/04, 69 FR 70895 | (c)(230). |
Section 130.334 | Products registered under FIFRA | 10/11/08 | 10/18/10, 75 FR 63717. | |
Section 130.335 | Air fresheners | 10/11/08 | 10/18/10, 75 FR 63717. | |
Section 130.336 | Adhesives | 10/5/02 | 12/8/04, 69 FR 70895 | (c)(230). |
Section 130.337 | Bait station insecticides | 10/5/02 | 12/8/04, 69 FR 70895 | (c)(230). |
Section 130.338 | Fragrances | 10/11/08 | 10/18/10, 75 FR 63717 | Added section. |
Innovative Products | ||||
Section 130.351 | Innovative products exemption | 10/5/02 | 12/8/04, 69 FR 70895 | (c)(230). |
Section 130.352 | Request for exemption | 10/5/02 | 12/8/04, 69 FR 70895 | (c)(230). |
Administrative Requirements | ||||
Section 130.371 | Code-dating | 10/11/08 | 10/18/10, 75 FR 63717. | |
Section 130.372 | Most restrictive limit | 10/11/08 | 10/18/10, 75 FR 63717 | |
Section 130.373 | Additional labeling requirements for aerosol adhesives | 10/11/08 | 10/18/10, 75 FR 63717 | |
Reporting Requirements | ||||
Section 130.391 | Required reporting of information to the Department | 10/5/02 | 12/8/04, 69 FR 70895 | (c)(230). |
Section 130.392 | Confidentiality | 10/5/02 | 12/8/04, 69 FR 70895 | (c)(230). |
Variances | ||||
Section 130.411 | Application for variance | 10/11/08 | 10/18/10, 75 FR 63717. | |
Section 130.412 | Variance orders | 10/11/08 | 10/18/10, 75 FR 63717. | |
Section 130.413 | Termination of variance | 10/5/02 | 12/8/04, 69 FR 70895 | (c)(230). |
Section 130.414 | Modification of variance | 10/11/08 | 10/18/10, 75 FR 63717. | |
TEST METHODS | ||||
Section 130.431 | Testing for compliance | 10/5/02 | 12/8/04, 69 FR 70895 | (c)(230). |
ACP for Consumer Products | ||||
Section 130.451 | Alternative methods of compliance | 10/5/02 | 12/8/04, 69 FR 70895 | (c)(230) |
Section 130.452 | Exemption | 10/11/08 | 10/18/10, 75 FR 63717. | |
Section 130.453 | Request for exemption | 10/11/08 | 10/18/10, 75 FR 63717. | |
Section 130.454 | Application for an ACP | 10/11/08 | 10/18/10,75 FR 63717. | |
Section 130.455 | Recordkeeping and availability of requested information | 10/11/08 | 10/18/10, 75 FR 63717. | |
Section 130.456 | Surplus reductions and surplus trading | 10/5/02 | 12/8/04, 69 FR 70895 | (c)(230). |
Section 130.457 | Limited-use surplus reduction credits for early reformulations of ACP products | 10/11/08 | 10/18/10, 75 FR 63717. | |
Section 130.458 | Reconciliation of shortfalls | 10/11/08 | 10/18/10, 75 FR 63717. | |
Section 130.459 | Notification of modifications to an ACP by the responsible ACP party | 10/5/02 | 12/8/04, 69 FR 70895 | (c)(230). |
Section 130.460 | Modifications that require Department preapproval | 10/11/08 | 10/18/10, 75 FR 63717. | |
Section 130.461 | Other modifications | 10/5/02 | 12/8/04, 69 FR 70895 | (c)(230). |
Section 130.462 | Modification of an ACP by the Department | 10/11/08 | 10/18/10, 75 FR 63717. | |
Section 130.463 | Cancellation of an ACP | 10/5/02 | 12/8/04, 69 FR 70895 | (c)(230). |
Section 130.464 | Treatment of information | 10/5/02 | 12/8/04, 69 FR 70895 | (c)(230). |
Section 130.465 | Other applicable requirements | 10/11/08 | 10/18/10, 75 FR 63717. | |
Public Hearing Requirements | ||||
Section 130.471 | Public hearings | 10/11/08 | 10/18/10, 75 FR 63717. | |
Subchapter C-Architectural and Industrial Maintenance Coatings | ||||
Section 130.601 | Applicability | 10/25/03 | 11/23/04, 69 FR 68080 | (c)(227). |
Section 130.602 | Definitions | 10/11/08 | 10/18/10, 75 FR 63717. | |
Section 130.603 | Standards | 10/25/03 | 11/23/04, 69 FR 68080 | (c)(227). |
Section 130.604 | Container labeling requirements | 10/25/03 | 11/23/04, 69 FR 68080 | (c)(227). |
Section 130.605 | Reporting requirements | 10/25/03 | 11/23/04, 69 FR 68080 | (c)(227). |
Section 130.606 | Application for variance | 10/25/03 | 11/23/04, 69 FR 68080 | (c)(227). |
Section 130.607 | Variance orders | 10/25/03 | 11/23/04, 69 FR 68080 | (c)(227). |
Section 130.608 | Termination of variance | 10/25/03 | 11/23/04, 69 FR 68080 | (c)(227). |
Section 130.609 | Extension, modification or revocation of variance | 10/25/03 | 11/23/04, 69 FR 68080 | (c)(227). |
Section 130.610 | Public hearings | 10/25/03 | 11/23/04, 69 FR 68080 | (c)(227). |
Section 130.611 | Compliance provisions and test methods | 10/25/03 | 11/23/04, 69 FR 68080 | (c)(227). |
Subchapter D-Adhesives, Sealants, Primers and Solvents | ||||
Section 130.701 | Applicability | 12/25/10 | 9/26/12, 77 FR 59090 | New section is added. |
Section 130.702 | Emission standards | 12/25/10 | 9/26/12, 77 FR 59090 | New section is added. |
130.703 | Exemptions and exceptions | 6/28/2014 | 6/25/2015, 80 FR 36482 | Amends section 130.703 . |
Section 130.704 | Recordkeeping requirements | 12/25/10 | 9/26/12, 77 FR 59090 | New section is added. |
Section 130.705 | Compliance procedures and test methods | 12/25/10 | 9/26/12, 77 FR 59090 | New section is added. |
Section 130.706 | Container labeling | 12/25/10 | 9/26/12, 77 FR 59090 | New section is added. |
Section 130.707 | Product dating | 12/25/10 | 9/26/12, 77 FR 59090 | New section is added. |
Section 130.708 | Sell-through of products | 12/25/10 | 9/26/12, 77 FR 59090 | New section is added. |
Chapter 131-Ambient Air Quality Standards | ||||
Section 131.1 | Purpose | 3/20/72 | 5/31/72, 37 FR 10842 | (c)(1). |
Section 131.2 | National Ambient Air Quality Standards | 3/20/72 | 5/31/72, 37 FR 10842 | (c)(1). |
Section 131.3 | Ambient air quality standards | 8/13/83 | 7/27/84, 49 FR 30183 | (c)(60); Amendment removed a lead standard provision. The remaining standards are not SIP-related. |
Section 131.4 | Application of ambient air quality standards | 3/20/72 | 5/31/72, 37 FR 10842 | (c)(1). |
Chapter 135-Reporting of Sources | ||||
General | ||||
Section 135.1 | Definitions | 3/20/72 | 5/31/72, 37 FR 10842 | (c)(1). |
Section 135.2 | Applicability [of sources] | 3/20/72 | 5/31/72, 37 FR 10842 | (c)(1). |
Section 135.3 | Reporting | 3/20/72 | 5/31/72, 37 FR 10842 | (c)(1). |
Section 135.4 | Reporting forms and guides | 3/20/72 | 5/31/72, 37 FR 10842 | (c)(1). |
Section 135.5 | Recordkeeping | 10/10/92 | 1/12/95, 60 FR 2081 | (c)(96). |
Emission Statements | ||||
Section 135.21 | Emission statements | 10/10/92 | 1/12/95, 60 FR 2081 | (c)(96). |
Chapter 137-Air Pollution Episodes | ||||
General | ||||
Section 137.1 | Purpose | 1/28/72 | 5/31/72, 37 FR 10842 | (c)(1). |
Section 137.2 | Monitoring facilities | 1/28/72 | 5/31/72, 37 FR 10842 | (c)(1). |
Section 137.3 | Episode criteria | 6/9/90 | 6/16/93, 58 FR 33203 | (c)(75). |
Section 137.4 | Standby plans | 12/27/97 | 6/11/02, 67 FR 39854 | (c)(189). |
Section 137.5 | Implementation of emission reduction procedures | 1/28/72 | 5/31/72, 37 FR 10842 | (c)(1). |
Level Actions | ||||
Section 137.11 | Forecast level actions | 1/28/72 | 5/31/72, 37 FR 10842 | (c)(1). |
Section 137.12 | Alert level actions | 1/28/72 | 5/31/72, 37 FR 10842 | (c)(1). |
Section 137.13 | Warning level actions | 1/28/72 | 5/31/72, 37 FR 10842 | (c)(1). |
Section 137.14 | Emergency level actions | 1/28/72 | 5/31/72, 37 FR 10842 | (c)(1). |
Chapter 139-Sampling and Testing | ||||
Subchapter A-Sampling and Testing Methods and Procedures | ||||
General | ||||
Section 139.1 | Sampling facilities | 3/20/72 | 5/31/72, 37 FR 10842 | (c)(1). |
Section 139.2 | Sampling by others | 3/20/72 | 5/31/72, 37 FR 10842 | (c)(1). |
Section 139.3 | General requirements | 8/1/79 | 8/8/79, 44 FR 46465 | (c)(20); Correction published 1/23/80 (45 FR 5303). |
Section 139.4 | References | 02/09/13 | 07/10/14, 79 FR 39333 | Amended and added references. |
Section 139.5 | Revisions to the source testing manual and continuous source monitoring manual | 11/26/94 | 7/30/96, 61 FR 39597 | (c)(110)(i)(D). |
Stationary Sources | ||||
Section 139.11 | General requirements | 3/20/72 | 5/31/72, 37 FR 10842 | (c)(1). |
Section 139.12 | Emissions of particulate matter | 4/12/14 | 8/1/16, 81 FR 50359 | Amends section 139.12 . |
Section 139.13 (Except Provisions applicable to H2S and TRS) | Emissions of SO2, H2S, TRS and NO2 | 11/26/94 | 7/30/96, 61 FR 39597 | (c)(110)(i)(D). |
Section 139.14 | Emissions of VOCs | 6/10/00 | 7/20/01, 66 FR 37908 | (c)(152). |
Section 139.16 | Sulfur in fuel oil | 02/09/13 | 07/10/14, 79 FR 39333 | Amended to add cross references. |
Section 139.17 | General requirements | 6/20/81 | 1/19/83, 48 FR 2319 | (c)(48). |
Section 139.18 | Calculation of alternative opacity limitations | 6/20/81 | 1/19/83, 48 FR 2319 | (c)(48). |
Ambient Levels of Air Contaminants | ||||
Section 139.31 | General | 3/20/72 | 5/31/72, 37 FR 10842 | (c)(1). |
Section 139.32 | Sampling and analytical procedures | 11/26/94 | 7/30/96, 61 FR 39597 | (c)(110)(i)(D). |
Section 139.33 | Incorporation of Federal procedures | 3/20/72 | 5/31/72, 37 FR 10842 | (c)(1). |
Subchapter B-Monitoring Duties of Certain Sources | ||||
General | ||||
Section 139.51 | Purpose | 8/29/77 | 7/17/79, 44 FR 41429 | (c)(19). |
Section 139.52 | Monitoring methods and techniques | 8/29/77 | 7/17/79, 44 FR 41429 | (c)(19). |
Section 139.53 | Filing monitoring reports | 4/12/14 | 8/1/16, 81 FR 50359 | Amends section 139.53 . |
Subchapter C-Requirements for Continuous In-Stack Monitoring for Stationary Sources | ||||
Section 139.101 | General Requirements | 3/7/98 | 6/11/02, 67 FR 39854 | (c)(189). |
Section 139.102 | References | 11/26/94 | 7/30/96, 61 FR 39597 | (c)(110)(i)(D). |
Section 139.103 | Opacity monitoring requirements | 11/26/94 | 7/30/96, 61 FR 39597 | (c)(110)(i)(D). |
Section 139.111 | Waste incinerator monitoring requirements | 12/27/97 | 6/11/02, 67 FR 39854 | (c)(189). |
Chapter 141-Alternate Standards | ||||
Section 141.1 | Imposing alternate standards authorized | 5/14/88 | 9/17/92, 57 FR 42894 | (c)(73). |
Chapter 145-Interstate Pollution Transport Reduction | ||||
Subchapter A-NOXBudget Trading Program | ||||
General Provisions | ||||
Section 145.1 | Purpose | 9/23/00 | 8/21/01, 66 FR 43795 | (c)(168). |
Section 145.2 | Definitions | 9/23/00 | 8/21/01, 66 FR 43795 | (c)(168). |
Section 145.3 | Measurements, abbreviations and acronyms | 9/23/00 | 8/21/01, 66 FR 43795 | (c)(168). |
Section 145.4 | Applicability | 9/23/00 | 8/21/01, 66 FR 43795 | (c)(168). |
Section 145.5 | Retired unit exemption | 9/23/00 | 8/21/01, 66 FR 43795 | (c)(168). |
Section 145.6 | Standard requirements | 9/23/00 | 8/21/01, 66 FR 43795 | (c)(168). |
Section 145.7 | Computation of time | 9/23/00 | 8/21/01, 66 FR 43795 | (c)(168). |
Section 145.8 | Transition to CAIR NOX Trading Programs | 4/12/08 | 12/10/09, 74 FR 65446 | New section. |
NOXAccount | ||||
Section 145.10 | Authorization and responsibilities of the NOX authorized account representative | 9/23/00 | 8/21/01, 66 FR 43795 | (c)(168). |
Section 145.11 | Alternate NOX authorized account representative | 9/23/00 | 8/21/01, 66 FR 43795 | (c)(168). |
Section 145.12 | Changing the NOX authorized account representative; and changes in the Alternate NOX authorized account representative; changes in the owners and operators | 9/23/00 | 8/21/01, 66 FR 43795 | (c)(168). |
Section 145.13 | Account certificate of representation | 9/23/00 | 8/21/01, 66 FR 43795 | (c)(168). |
Section 145.14 | Objections concerning the NOX authorized account representative | 9/23/00 | 8/21/01, 66 FR 43795 | (c)(168). |
Compliance Certification | ||||
Section 145.30 | Compliance certification report | 9/23/00 | 8/21/01, 66 FR 43795 | (c)(168). |
Section 145.31 | Department's action on compliance certifications | 9/23/00 | 8/21/01, 66 FR 43795 | (c)(168). |
NOXAllowance Allocations | ||||
Section 145.40 | State Trading Program budget | 9/23/00 | 8/21/01, 66 FR 43795 | (c)(168). |
Section 145.41 | Timing Requirements for NOX allowance allocations | 9/23/00 | 8/21/01, 66 FR 43795 | (c)(168). |
Section 145.42 | NOX Allowance allocations | 12/11/04 | 9/29/06, 71 FR 57428 | Revised; SIP-effective date is 10/30/06. |
Section 145.43 | Compliance supplement pool | 9/23/00 | 8/21/01, 66 FR 43795 | (c)(168). |
Accounting Process for Deposit Use and Transfer of Allowances | ||||
Section 145.50 | NOX Allowance Tracking System accounts | 9/23/00 | 8/21/01, 66 FR 43795 | (c)(168). |
Section 145.51 | Establishment of accounts | 9/23/00 | 8/21/01, 66 FR 43795 | (c)(168). |
Section 145.52 | NOX Allowance Tracking System responsibilities of NOX authorized account representative | 9/23/00 | 8/21/01, 66 FR 43795 | (c)(168). |
Section 145.53 | Recordation of NOX allowance allocations | 9/23/00 | 8/21/01, 66 FR 43795 | (c)(168). |
Section 145.54 | Compliance | 9/23/00 | 8/21/01, 66 FR 43795 | (c)(168). |
Section 145.55 | Banking | 9/23/00 | 8/21/01, 66 FR 43795 | (c)(168). |
Section 145.56 | Account error | 9/23/00 | 8/21/01, 66 FR 43795 | (c)(168). |
Section 145.57 | Closing of general accounts | 9/23/00 | 8/21/01, 66 FR 43795 | (c)(168). |
NOXAllowance Transfers | ||||
Section 145.60 | Submission of NOX allowance transfers | 9/23/00 | 8/21/01, 66 FR 43795 | (c)(168). |
Section 145.61 | NOX transfer recordation | 9/23/00 | 8/21/01, 66 FR 43795 | (c)(168). |
Section 145.62 | Notification | 9/23/00 | 8/21/01, 66 FR 43795 | (c)(168). |
Recording and Recordkeeping Requirements | ||||
Section 145.70 | General monitoring requirements | 9/23/00 | 8/21/01, 66 FR 43795 | (c)(168). |
Section 145.71 | Initial certification and recertification procedures | 9/23/00 | 8/21/01, 66 FR 43795 | (c)(168). |
Section 145.72 | Out of control periods | 9/23/00 | 8/21/01, 66 FR 43795 | (c)(168). |
Section 145.73 | Notifications | 9/23/00 | 8/21/01, 66 FR 43795 | (c)(168). |
Section 145.74 | Recordkeeping and reporting | 9/23/00 | 8/21/01, 66 FR 43795 | (c)(168). |
Section 145.75 | Petitions | 9/23/00 | 8/21/01, 66 FR 43795 | (c)(168). |
Section 145.76 | Additional requirements to provide heat input data | 9/23/00 | 8/21/01, 66 FR 43795 | (c)(168). |
Opt-In Process | ||||
Section 145.80 | Applicability for opt-in sources | 9/23/00 | 8/21/01, 66 FR 43795 | (c)(168). |
Section 145.81 | Opt-in source general provisions | 9/23/00 | 8/21/01, 66 FR 43795 | (c)(168). |
Section 145.82 | NOX authorized account representative for opt-in sources | 9/23/00 | 8/21/01, 66 FR 43795 | (c)(168). |
Section 145.83 | Applying for a NOX budget opt-in approval | 9/23/00 | 8/21/01, 66 FR 43795 | (c)(168). |
Section 145.84 | Opt-in process | 9/23/00 | 8/21/01, 66 FR 43795 | (c)(168). |
Section 145.85 | NOX budget opt-in application contents | 9/23/00 | 8/21/01, 66 FR 43795 | (c)(168). |
Section 145.86 | Opt-in source withdrawal from NOX Budget Trading Program | 9/23/00 | 8/21/01, 66 FR 43795 | (c)(168). |
Section 145.87 | Opt-in unit change in regulatory status | 9/23/00 | 8/21/01, 66 FR 43795 | (c)(168). |
Section 145.88 | NOX allowance allocations to opt-in units | 9/23/00 | 8/21/01, 66 FR 43795 | (c)(168). |
Emission Reduction Credit Provisions | ||||
Section 145.90 | Emission reduction credit provisions | 9/23/00 | 8/21/01, 66 FR 43795 | (c)(168). |
Interstate Pollution Transport Reduction Requirements | ||||
Section 145.100 | Applicability to upwind states | 9/23/00 | 8/21/01, 66 FR 43795 | (c)(168). |
Subchapter B-Emissions of NOXfrom Stationary Internal Combustion Engines | ||||
Section 145.111 | Applicability | 12/11/04 | 9/29/06, 71 FR 57428 | New Section SIP-effective date is 10/30/06. |
Section 145.112 | Definitions | 12/11/04 | 9/29/06, 71 FR 57428 | New Section SIP-effective date is 10/30/06. |
Section 145.113 | Standard requirements | 4/12/08 | 12/10/09, 74 FR 65446 | New subsection d. |
Subchapter C-Emissions of NOXfrom Cement Manufacturing | ||||
Section 145.141 | Applicability | 12/11/04 | 9/29/06, 71 FR 57428 | New Section SIP-effective date is 10/30/06. |
Section 145.142 | Definitions | 6/19/10 | 7/19/11, 76 FR 42558 | Added new definitions and terms. |
Section 145.143 | Standard requirements | 6/19/10 | 7/19/11, 76 FR 42558 | Added compliance dates and allowable emissions of NOX. |
Section 145.144 | Compliance determination | 6/19/10 | 7/19/11, 76 FR 42558 | New section. |
Section 145.145 | Compliance demonstration and reporting requirements | 6/19/10 | 7/19/11, 76 FR 42558 | New section. |
Section 145.146 | Recordkeeping | 6/19/10 | 7/19/11, 76 FR 42558 | New section. |
Subchapter D. CAIR NOXand SO2Trading Programs-General Provisions | ||||
Section 145.201 | Purpose | 4/12/08 | 12/10/09, 74 FR 65446 | |
Section 145.202 | Definitions | 4/12/08 | 12/10/09, 74 FR 65446 | |
Section 145.203 | Applicability | 4/12/08 | 12/10/09, 74 FR 65446 | |
Section 145.204 | Incorporation of Federal regulations by reference | 4/12/08 | 12/10/09, 74 FR 65446 | |
Additional Requirements for Chapter 127 Emission Reduction Credit Provisions | ||||
Section 145.205 | Emission reduction credit provisions | 4/12/08 | 12/10/09, 74 FR 65446 | |
Additional Requirements for CAIR NOXAnnual Trading Program | ||||
Section 145.211 | Timing Requirements for CAIR NOX allowance allocations | 4/12/08 | 12/10/09, 74 FR 65446 | |
Section 145.212 | CAIR NOX allowance allocations | 4/12/08 | 12/10/09, 74 FR 65446 | |
Section 145.213 | Supplemental monitoring, recordkeeping and reporting requirements for gross electrical output and useful thermal energy for units subject to 40 CFR 96.170-96.175 | 4/12/08 | 12/10/09, 74 FR 65446 | |
ADDITIONAL REQUIREMENTS FOR CAIR NOXOZONE SEASON TRADING PROGRAM | ||||
Section 145.221 | Timing requirements for CAIR NOX ozone season allowance allocations | 4/12/08 | 12/10/09, 74 FR 65446 | |
Section 145.222 | CAIR NOX Ozone Season allowance allocations | 4/12/08 | 12/10/09, 74 FR 65446 | |
Section 145.223 | Supplemental monitoring, recordkeeping and reporting requirements for gross electrical output and useful thermal energy for units subject to 40 CFR 96.370-96.375 | 4/12/08 | 12/10/09, 74 FR 65446 | |
Title 65 Pennsylvania Statute-Public Officers | ||||
Part II-Accountability | ||||
Chapter 11-Ethics, Standards, and Financial Disclosure | ||||
Section 1101 | Short title of chapter | 12/14/98 | 10/16/14, 79 FR 62005 | Addresses CAA section 128. |
Section 1102 | Definitions | 1/1/07 | 10/16/14, 79 FR 62005 | Addresses CAA section 128. |
Section 1104 | Statement of financial interests required to be filed | 12/14/98 | 10/16/14, 79 FR 62005 | Addresses CAA section 128. |
Section 1105 | Statement of financial interests | 1/1/07 | 10/16/14, 79 FR 62005 | Addresses CAA section 128. |
Section 1109 | Penalties | 12/14/98 | 10/16/14, 79 FR 62005 | Addresses CAA section 128. |
Title 67-Transportation | ||||
Part I-Department of Transportation | ||||
Subpart A-Vehicle Code Provisions | ||||
Article VII-Vehicle Characteristics | ||||
Chapter 175-Vehicle Equipment and Inspection | ||||
Subchapter A-General Provisions | ||||
Section 175.2 | Definitions | 9/27/97 | 6/17/99, 64 FR 32411 | "Temporary Inspection Approval Indicator" only. |
Section 175.2 | Definitions | 12/3/88 | 10/6/05, 70 FR 58313 | Definitions which apply to safety inspection program in non-I/M counties. |
Section 175.3 | Application of equipment rules | 12/3/88 | 10/6/05, 70 FR 58313 | Applies to safety inspection program in non-I/M counties. |
Section 175.4 | Vehicles required to be inspected | 12/3/88 | 10/6/05, 70 FR 58313 | Applies to safety inspection program in non-I/M counties. |
Section 175.6 | Annual inspection | 12/3/88 | 10/6/05, 70 FR 58313 | Applies to safety inspection program in non-I/M counties. |
Section 175.7 | Inspection of vehicle reentering this Commonwealth | 12/3/88 | 10/6/05, 70 FR 58313 | Applies to safety inspection program in non-I/M counties. |
Section 175.8 | Newly purchased vehicles | 2/19/94 | 10/6/05, 70 FR 58313 | Applies to safety inspection program in non-I/M counties. |
Section 175.11 | Coordination of safety and emission inspection | 9/27/97 | 6/17/99, 64 FR 32411 | (c)(139). |
Subchapter B-Official Inspection Stations | ||||
Section 175.21 | Appointment | 12/3/88 | 10/6/05, 70 FR 58313 | Applies to safety inspection program in non-I/M counties. |
Section 175.22 | Making application | 12/3/88 | 10/6/05, 70 FR 58313 | Applies to safety inspection program in non-I/M counties. |
Section 175.23(a) and (c) | Approval | 12/3/88 | 10/6/05, 70 FR 58313 | Applies to safety inspection program in non-I/M counties. |
Section 175.24 | Required certificates and station signs | 12/3/88 | 10/6/05, 70 FR 58313 | Applies to safety inspection program in non-I/M counties. |
Section 175.25(a), (b)(1), (b)(3), and (c) | Inspection area | 12/3/88 | 10/6/05, 70 FR 58313 | Applies to safety inspection program in non-I/M counties. |
Section 175.26(a) introductory sentence and (a)(3) | Tools and equipment | 9/28/96 | 10/6/05, 70 FR 58313 | Applies to safety inspection program in non-I/M counties. |
Section 175.27 | Hours | 12/3/88 | 10/6/05, 70 FR 58313 | Applies to safety inspection program in non-I/M counties. |
Section 175.28 [Except for (c)(2), (g)(2), (g)(3), and (g)(5)-((9)] | Certified Inspection Mechanics | 12/3/88 | 10/6/05, 70 FR 58313. | Applies to safety inspection program in non-I/M counties. |
Section 175.29(f)(4) | Obligations and responsibilities of station | 9/27/97 | 6/17/99, 64 FR 32411 | (c)(139). |
Section 175.29 | Obligations and responsibilities of stations | 9/27/97 | 10/6/05, 70 FR 58313 | Applies to safety inspection program in non-I/M counties (except for (f)(4), which applies to I/M and non-I/M programs). |
Section 175.31 | Fleet inspection stations | 12/3/88 | 10/6/05, 70 FR 58313 | Applies to safety inspection program in non-I/M counties. |
Subchapter C-Certificate of Inspection | ||||
Section 175.41(a), (b)(1), (b)(3), (c), (d), (e)(1), (e)(3), (e)(5), and (f)(4) | Procedure | 9/27/97 | 10/6/05, 70 FR 58313 | Applies statewide; To I/M program and non-I/M safety inspection program. |
Section 175.42 | Recording inspection | 9/27/97 | 6/17/99, 64 FR 32411 | |
Section 175.43 | Security | 9/27/97 | 6/17/99, 64 FR 32411 | |
Section 175.44 | Ordering certificates of inspection | 9/27/97 | 6/17/99, 64 FR 32411 | |
Section 175.45 | Violation of use of certificate of inspection | 9/27/97 | 6/17/99, 64 FR 32411 | |
Subchapter D-Schedule of Penalties and Suspensions: Official Inspection Stations and Certified Mechanics | ||||
Section 175.51 | Cause for suspension | 2/19/94 | 10/6/05, 70 FR 58313 | New section; Applies to safety inspection program in non-I/M counties. |
Section 175.52 | Reapplication | 12/3/88 | 10/6/05, 70 FR 58313 | New section; Applies to safety inspection program in non-I/M counties. |
Subchapter E-Passenger Cars and Light Trucks | ||||
Section 175.61 | Application of subchapter | 12/3/88 | 10/6/05, 70 FR 58313 | New section; Applies to safety inspection program in non-I/M counties. |
Section 175.72(d) | Fuel systems | 12/3/88 | 10/6/05, 70 FR 58313 | New section; Applies to safety inspection program in non-I/M counties. |
Section 175.80(d) | Inspection procedure | 5/13/99 | 10/6/05, 70 FR 58313 | New section; Applies to safety inspection program in non-I/M counties. |
Subchapter H-Motorcycles | ||||
Section 175.141 | Application of subchapter | 12/3/88 | 10/6/05, 70 FR 58313 | New section; Applies to safety inspection program in non-I/M counties. |
Subchapter J-Motor-Driven Cycles and Motorized Pedalcycles | ||||
Section 175.171 | Application | 12/3/88 | 10/6/05, 70 FR 58313 | New section; Applies to safety inspection program in non-I/M counties. |
Subchapter K-Street Rods, Specially Constructed and Reconstructed Vehicles | ||||
Section 175.201 | Application of subchapter | 12/3/88 | 10/6/05, 70 FR 58313 | New section; Applies to safety inspection program in non-I/M counties. |
Section 175.202 | Conditions | 12/3/88 | 10/6/05, 70 FR 58313 | Applies to safety inspection program in non-I/M counties. |
Section 175.220(d) [introductory sentence only] | Inspection procedure | 5/13/99 | 10/6/05, 70 FR 58313 | Applies to safety inspection program in non-I/M counties. |
Subchapter L-Animal-Drawn Vehicles, Implements of Husbandry and Special Mobile Equipment | ||||
Section 175.221 | Application | 12/3/88 | 10/6/05, 70 FR 58313 | |
Chapter 177-Enhanced Emission Inspection Program | ||||
Subchapter A-General Provisions | ||||
Section 177.1 | Purpose | 10/1/97 | 6/17/99, 64 FR 32411 | (c)(139). |
Section 177.2 | Application of equipment rules | 10/1/97 | 6/17/99, 64 FR 32411 | (c)(139). |
Section 177.3 | Definitions | 11/22/03 | 10/6/05, 70 FR 58313 | |
Implementation of Emission Inspection Program | ||||
Section 177.22 | Commencement of inspections | 11/22/03 | 10/6/05, 70 FR 58313 | Retitled and revised. |
Section 177.23 | Notification of requirement for emission inspection | 11/22/03 | 10/6/05, 70 FR 58313 | |
Section 177.24 | Program evaluation | 11/22/03 | 10/6/05, 70 FR 58313 | |
I/M Program | ||||
Section 177.51 | Program requirements | 11/22/03 | 10/6/05, 70 FR 58313 | Excludes paragraphs (c)(1), (c)(2), and (c)(3), and reference to those paragraphs. |
Section 177.52 | Emission inspection prerequisites | 11/22/03 | 10/6/05, 70 FR 58313 | |
Section 177.53 | Vehicle inspection process | 11/22/03 | 10/6/05, 70 FR 58313 | |
Subchapter B-Subject Vehicles | ||||
Section 177.101 | Subject vehicles | 11/22/03 | 10/6/05, 70 FR 58313 | |
Section 177.102 | Inspection of vehicles reentering this Commonwealth | 9/27/97 | 6/17/99, 64 FR 32411 | (c)(139). |
Section 177.103 | Used vehicles after sale or resale | 9/27/97 | 6/17/99, 64 FR 32411 | (c)(139). |
Section 177.104 | Vehicles registered in nondesignated areas or other states | 9/27/97 | 6/17/99, 64 FR 32411 | (c)(139). |
Section 177.105 | Vehicles requiring emission inspection due to change of address | 11/22/03 | 10/6/05, 70 FR 58313 | |
Subchapter C-Emission Test Procedures and Emission Standards | ||||
General | ||||
Section 177.201 | General requirements | 11/22/03 | 10/6/05, 70 FR 58313 | |
Section 177.202 | Emission test equipment | 11/22/03 | 10/6/05, 70 FR 58313 | |
Section 177.202a | OBD-I/M check equipment | 11/22/03 | 10/6/05, 70 FR 58313 | New section. |
Section 177.202b | Equipment for gas cap test and visual inspection | 11/22/03 | 10/6/05, 70 FR 58313 | New section. |
Section 177.203 | Test procedures | 11/22/03 | 10/6/05, 70 FR 58313 | |
Section 177.204 | Basis for failure | 11/22/03 | 10/6/05, 70 FR 58313 | Retitled and revised. |
Recall Provisions | ||||
Section 177.231 | Requirements regarding manufacturer recall notices | 9/27/97 | 6/17/99, 64 FR 32411 | (c)(139). |
Section 177.232 | Compliance with recall notices | 9/27/97 | 6/17/99, 64 FR 32411 | (c)(139). |
Section 177.233 | Failure to comply | 9/27/97 | 6/17/99, 64 FR 32411 | (c)(139). |
Emission Inspection Report | ||||
Section 177.251 | Record of test results | 9/27/97 | 6/17/99, 64 FR 32411 | (c)(139). |
Section 177.252 | Emission inspection report | 11/22/03 | 10/6/05, 70 FR 58313 | Retitled and revised. |
Section 177.253 | Responsibility of the station owner for vehicles which fail the emission inspection | 11/22/03 | 10/6/05, 70 FR 58313 | Retitled and revised. |
Retest | ||||
Section 177.271 | Procedure | 11/22/03 | 10/6/05, 70 FR 58313 | |
Section 177.272 | Prerequisites | 11/22/03 | 10/6/05, 70 FR 58313 | |
Section 177.273 | Content of repair data form | 11/22/03 | 10/6/05, 70 FR 58313 | |
Section 177.274 | Retest fees | 11/22/03 | 10/6/05, 70 FR 58313 | |
Section 177.275 | Repair technician training and certification | 11/22/03 | 10/6/05, 70 FR 58313 | New section. |
Issuance of Waiver | ||||
Section 177.281 | Issuance of waiver | 11/22/03 | 10/6/05, 70 FR 58313 | |
Section 177.282 | Annual adjustment of minimum waiver expenditure for emission inspection | 11/22/03 | 10/6/05, 70 FR 58313 | Excludes/removes the sentence and partial sentence, "The minimum expenditure for the first 2 years after commencement of the program in an affected area is $150. Beginning with the 3rd year of the program in an affected area". |
Procedures Relating to Certificates of Emission Inspection | ||||
Section 177.291 | Procedures relating to certificates of emission inspection | 11/22/03 | 10/6/05, 70 FR 58313 | Retitled and revised. |
Section 177.292 | Recording inspection | 11/22/03 | 10/6/05, 70 FR 58313 | |
Registration Recall Procedure for Violation of §§ 177.301-177 .305 (Relating to On-Road Testing) | ||||
Section 177.301 | Authorization to conduct on-road emission testing | 9/27/97 | 6/17/99, 64 FR 32411 | (c)(139). |
Section 177.302 | On-road testing devices | 9/27/97 | 6/17/99, 64 FR 32411 | (c)(139). |
Section 177.304 | Failure of on-road emission test | 11/22/03 | 10/6/05, 70 FR 58313 | |
Section 177.305 | Failure to produce proof of correction of on-road emission test failure | 9/27/97 | 6/17/99, 64 FR 32411 | (c)(139). |
Subchapter D-Official Emission Inspection Station Requirements | ||||
General | ||||
Section 177.401 | Appointment | 11/22/03 | 10/6/05, 70 FR 58313 | |
Section 177.402 | Application | 9/27/97 | 6/17/99, 64 FR 32411 | (c)(139). |
Section 177.403 | Approval of emission inspection station | 9/27/97 | 6/17/99, 64 FR 32411 | (c)(139). |
Section 177.404 | Required certificates and station signs | 11/22/03 | 10/6/05, 70 FR 58313 | |
Section 177.405 | Emission inspection areas | 11/22/03 | 10/6/05, 70 FR 58313 | |
Section 177.406 | Equipment | 11/22/03 | 10/6/05, 70 FR 58313 | Retitled and revised. |
Section 177.407 | Hours of operation | 11/22/03 | 10/6/05, 70 FR 58313 | |
Section 177.408 | Certified emission inspectors | 11/22/03 | 10/6/05, 70 FR 58313 | |
Obligations and Responsibilities of Station Owners/Agents | ||||
Section 177.421 | Obligations and responsibilities of station owners/agents | 11/22/03 | 10/6/05, 70 FR 58313 | |
Section 177.422 | Commonwealth emission inspection stations | 11/22/03 | 10/6/05, 70 FR 58313 | Retitled and revised. |
Section 177.423 | Fleet emission inspection stations | 11/22/03 | 10/6/05, 70 FR 58313 | Retitled and revised. |
Section 177.424 | General emission inspection stations | 11/22/03 | 10/6/05, 70 FR 58313 | |
Section 177.425 | Security | 11/22/03 | 10/6/05, 70 FR 58313 | |
Section 177.426 | Ordering certificates of emission inspection | 9/27/97 | 6/17/99, 64 FR 32411 | (c)(139). |
Section 177.427 | Violations of use of certificate of emission inspection | 9/27/97 | 6/17/99, 64 FR 32411 | (c)(139). |
Quality Assurance | ||||
Section 177.431 | Quality assurance | 11/22/03 | 10/6/05, 70 FR 58313 | |
Subchapter E-Equipment Manufacturers' and Contractors' Requirements and Obligations | ||||
Equipment Manufacturers' Requirements | ||||
Section 177.501 | Equipment approval procedures | 11/22/03 | 10/6/05, 70 FR 58313 | |
Section 177.502 | Service commitment | 11/22/03 | 10/6/05, 70 FR 58313 | |
Section 177.503 | Performance commitment | 11/22/03 | 10/6/05, 70 FR 58313 | |
Section 177.504 | Revocation of approval | 9/27/97 | 6/17/99, 64 FR 32411 | (c)(139). |
Contractor Obligations | ||||
Section 177.521 | Contractor obligations and responsibilities | 11/22/03 | 10/6/05, 70 FR 58313 | |
Subchapter F-Schedule of Penalties and Hearing Procedure | ||||
Schedule of Penalties and Suspensions | ||||
Section 177.601 | Definitions | 11/22/03 | 10/6/05, 70 FR 58313 | New section. |
Section 177.602 | Schedule of penalties for emission inspection stations | 11/22/03 | 10/6/05, 70 FR 58313 | |
Section 177.603 | Schedule of penalties for emission inspectors | 11/22/03 | 10/6/05, 70 FR 58313 | |
Additional Violations | ||||
Section 177.605 | Subsequent violations | 11/22/03 | 10/6/05, 70 FR 58313 | |
Section 177.606 | Multiple violations | 9/27/97 | 6/17/99, 64 FR 32411 | (c)(139). |
Departmental Hearing Procedure | ||||
Section 177.651 | Notice of alleged violation and opportunity to be heard prior to immediate suspension | 11/22/03 | 10/6/05, 70 FR 58313 | Retitled and revised. |
Section 177.652 | Official documents | 9/27/97 | 6/17/99, 64 FR 32411 | (c)(139). |
Restoration After Suspension | ||||
Section 177.671 | Restoration of certification of an emission inspector after suspension | 9/27/97 | 6/17/99, 64 FR 32411 | (c)(139). |
Section 177.672 | Restoration of certification of an emission inspection station after suspension | 9/27/97 | 6/17/99, 64 FR 32411 | (c)(139). |
Section 177.673 | Restoration of certification of certified repair technician after suspension | 9/27/97 | 6/17/99, 64 FR 32411 | (c)(139). |
Registration Recall Procedure for Violation of §§ 177.301-177 .305 (Relating to on-Road Testing) | ||||
Section 177.691 | Registration Recall Committee | 11/22/03 | 10/6/05, 70 FR 58313 | |
Appendix A | Acceleration Simulation Mode: Pennsylvania Procedures, Standards, Equipment Specifications and Quality Control Requirements | 11/22/03 | 10/6/05, 70 FR 58313 | Replaces previous Appendix A. |
Appendix B | Department Procedures and Specifications | 11/22/03 | 10/6/05, 70 FR 58313 | Replaces previous Appendix B. |
Title 35 Pennsylvania Statute-Health and Safety | ||||
Chapter 23B-Diesel-Powered Motor Vehicle Idling Act | ||||
Section 4601 | Short title | 2/6/09 | 8/1/11, 76 FR 45708 | |
Section 4602 | Definitions | 2/6/09 | 8/1/11, 76 FR 45708 | |
Section 4603 | Restrictions on idling | 2/6/09 | 8/1/11, 76 FR 45708 | |
Section 4604 | Increase of weight limit | 2/6/09 | 8/1/11, 76 FR 45708 | |
Section 4605 | Penalties | 2/6/09 | 8/1/11, 76 FR 45708 | |
Section 4606 | Disposition of fines | 2/6/09 | 8/1/11, 76 FR 45708 | |
Section 4607 | Enforcement | 2/6/09 | 8/1/11, 76 FR 45708 | |
Section 4608 | Permanent idling restriction signs | 2/6/09 | 8/1/11, 76 FR 45708 | |
Section 4609 | Preemption | 2/6/09 | 8/1/11, 76 FR 45708 | |
Section 4610 | Applicability | 2/6/09 | 8/1/11, 76 FR 45708 |
Article XX or XXI citation | Title/subject | State effective date | EPA approval date | Additional explanation/ § 52.2063 citation |
Part A-General | ||||
2101.01 | Short Titles | 10/20/95 | 11/14/02, 67 FR 68935 | In SIP at 52.2020(c)(92); citation change only at (c)(192). |
2101.02.a, .02.c | Declaration of Policy and Purpose | 10/20/95 | 11/14/02, 67 FR 68935 | (c)(192). |
2101.03 | Effective Date and Repealer | 10/20/95 | 11/14/02, 67 FR 68935 | In SIP at (c)(92); citation change only at (c)(192). |
2101.04 | Existing Orders | 10/20/95 | 11/14/02, 67 FR 68935 | (c)(192). |
2101.05 | Existing Permits and Licenses | 3/31/98 | 8/30/04, 69 FR 52831 | 52.2420(c)(209). |
2101.06 | Construction and Interpretation | 10/20/95 | 11/14/02, 67 FR 68935 | (c)(192). |
2101.07 (Except paragraphs .07.c.2 and c.8) | Administration and Organization | 06/19/15 | 05/31/17, 82 FR 24861 | Revised name of Allegheny County Health Department Bureau of Environmental Quality to Allegheny County Health Department Bureau of Environmental Health. |
Previous approval 11/14/02, 67 FR 68935 (c)(192) | ||||
2101.10 (except paragraph b) | Ambient Air Quality Standards | 9/25/13 | 4/8/20, 85 FR 19669 | This action is only approving the ACHD incorporations of EPA NAAQS under 40 CFR part 50 cited under this section. |
2101.11 | Prohibition of Air Pollution | 10/20/95 | 11/14/02, 67 FR 68935 | (c)(192). |
2101.12 | Interstate Air Pollution | 10/20/95 | 11/14/02, 67 FR 68935 | (c)(192). |
2101.13 | Nuisances | 10/20/95 | 11/14/02, 67 FR 68935 | (c)(192). |
2101.14 | Circumvention | 10/20/95 | 11/14/02, 67 FR 68935 | (c)(192). |
2101.20 | Definitions | 10/20/95 | 11/14/02, 67 FR 68935 | (c)(192); See Part I of the IBR document. |
2101.20 | Definitions | 5/15/98, 9/1/99 | 4/17/01, 66 FR 19724 | (c)(151); See Part I of the IBR document. |
2101.20 | Definitions | 7/10/03 | 6/24/05, 70 FR 36511 | See Part II of the IBR document. |
2101.20 | Definitions | 5/24/10 | 12/28/10, 75 FR 81480 | Addition of four new definitions: Exterior panels, interior panels, flat wood panel coating, and tileboard. See Part III of the IBR document. |
2101.20 | Definitions | 5/24/10 | 1/2/14, 79 FR 54 | Addition of "PM2.5" definition. |
2101.20 | Definitions | 6/8/13 | 11/6/14, 79 FR 65905 | Added seven definitions related to Outdoor Wood-Fired Boilers. |
2101.20 | Definitions | 4/3/2012 | 3/30/2015, 80 FR 16570 | Revise the latest entry dated 11/26/14, 79 FR 70471 by revising the existing definition of "Major Source" and "Major Modification". |
2101.20 | Definitions | 06/19/15 | 05/31/17, 82 FR 24861 | Revised definition of "County Executive" to mean "the Chief Executive of Allegheny County, Pennsylvania, as defined in the Allegheny County Home Rule Charter". |
2101.20 | Definitions | 01/01/15 | 8/10/17, 82 FR 37318 | Revised existing definition of "Open burning." All remaining definitions are unchanged as approved on June 24, 2015 (80 FR 36239). |
2101.20 | Definitions | 12/08/2017 | 5/2/2019, 84 FR 18739 | Revised and added definitions relating to sale and usage of commercial fuel oil. |
2101.20 | Definitions | 9/25/13 | 4/8/20, 85 FR 19669 | Addition of definition for "County Council." |
2101.20 | Definitions | 3/3/19 | 6/15/20, 85 FR 36164 | Adding "Significant air quality impact" for PM2.5. |
Part B-Permits Generally | ||||
2102.01 | Certification | 10/20/95 | 11/14/02, 67 FR 68935 | (c)(192). |
2102.02 | Applicability | 10/20/95 | 11/14/02, 67 FR 68935 | (c)(192). |
2102.03.a through .k | Permits Generally | 10/20/95 | 11/14/02, 67 FR 68935 | (c)(192). |
2102.04 | Permits Generally | 4/3/2012 | 3/30/2015, 80 FR 16570 | |
2102.05 | Installation Permits for New and Modified Major Sources | 10/20/95 | 11/14/02, 67 FR 68935 | (c)(192). |
2102.06 | Major Sources Locating in or Impacting a Nonattainment Area | 3/3/19 | 6/15/20, 85 FR 36164 | Adding requirements for 2012 PM2.5 NAAQS, as it relates to NNSR. Specifically, SO2, NOX, VOC, and ammonia are considered PM2.5 precursors in Allegheny County, PA. Previous approval was March 30, 2015. Docket No. EPA-R03-OAR-2015-0636. |
As per letter from PADEP dated 2/20/2013, the June 25, 2012 SIP submission inadvertently deleted language from the end of subsection (f) of the regulation submitted with SIP submittal. The SIP revision incorporating Article XXI § 2102.06(f) should read as follows "f. Requirements for Modeling. Where air quality models are used to meet the provisions of this section, modeling shall be based on the applicable models and other requirements specified in 40 CFR Part 51 Appendix W (Guideline on Air Quality Models). Where an air quality model is inappropriate, the model may be modified or another model may be substituted only on a case-by-case basis at the Department's discretion upon written approval by the administrator of EPA. In addition, use of a modified or substituted model must be subject to notice and opportunity for public comment under procedures set forth in 40 CFR 51.102 ." | ||||
2102.07 | Prevention of Significant Deterioration | 3/31/98 | 2/28/13, 78 FR 13493 | Added. |
2102.08 | Emission Offset Registration | 4/3/2012 | 3/30/2015, 80 FR 16570 | |
2102.10 | Installation Permit Application And Administration Fees | 7/26/2009 | 6/24/2015, 80 FR 36239 | |
Part C-Operating Permits | ||||
2103.01 | Transition | 10/20/95 | 8/30/04, 69 FR 52831 | (c)(209). |
Subpart 1-Operating Permits (All Major and Minor Permits) | ||||
2103.10.a., b | Applicability, Prohibitions, Records | 10/20/95 | 11/14/02, 67 FR 68935 | (c)(192). |
2103.11 | Applications | 10/20/95 | 8/30/04, 69 FR 52831 | (c)(209). |
2103.12 | Issuance, Standard Conditions | 3/31/98 | 8/30/04, 69 FR 52831 | (c)(209). |
2103.13 | Expiration, Renewals, Reactivation | 10/20/95 | 8/30/04, 69 FR 52831 | (c)(209). |
2103.14 | Revisions, Amendments, Modifications | 1/12/01 | 8/30/04, 69 FR 52831 | (c)(209). |
2103.15 | Reopenings, Revocations | 10/20/95 | 8/30/04, 69 FR 52831 | (c)(209). |
Subpart 2-Additional Requirements for Major Permits | ||||
2103.20.b.4 | Applicability, Prohibitions, Records | 10/20/95 | 11/14/02, 67 FR 68935 | (c)(192). |
Part D-Pollutant Emission Standards | ||||
2104.01 | Visible Emissions | 10/20/95 | 11/14/02, 67 FR 68935 | (c)(192). |
2104.02 | Particulate Mass Emissions | 8/15/97 | 6/12/98, 63 FR 32126 | (c)(133)(i)(B)(1); Citation changes approved on 11/12/02 (67 FR 68935) at (c)(192). |
2104.03 | Sulfur Oxide Emissions | 7/10/03 | 7/21/04, 69 FR 43522 | (c)(216)(i)(C). |
2104.05 | Materials Handling | 10/20/95 | 11/14/02, 67 FR 68935 | (c)(192). |
2104.06 | Violations | 10/20/95 | 11/14/02, 67 FR 68935 | (c)(192). |
2104.07 | Stack Heights | 10/20/95 | 11/14/02, 67 FR 68935 | (c)(192). |
2104.09 | Outdoor Wood-Fired Boilers | 6/8/13 | 11/6/14, 79 FR 65905 | Added new regulation. |
2104.10 | Commercial Fuel Oil | 09/01/20 | 05/17/22, 87 FR 29839 | Amended sections 2104.10 (a) , and 2104.10(d) . Previous approval (5/2/2019, 84 FR 18739). |
Part E-Source Emission and Operating Standards | ||||
2105.01 | Equivalent Compliance Techniques | 7/10/03 | 6/24/05, 70 FR 36511 | |
2105.02 | Other Requirements Not Affected | 10/20/95 | 11/14/02, 67 FR 68935 | (c)(192). |
2105.03 | Operation and Maintenance | 10/20/95 | 11/14/02, 67 FR 68935 | (c)(192). |
2105.04 | Temporary Shutdown of Incineration Equipment | 10/20/95 | 11/14/02, 67 FR 68935 | (c)(192). |
2105.06 | Major Sources of Nitrogen Oxides and Volatile Organic Compounds | 10/20/95 | 10/7/02, 67 FR 62389 | (c)(157). |
Subpart 1-VOC Sources | ||||
2105.10 | Surface Coating Processes | 6/8/13 | 11/26/14, 79 FR 70471 | Revision to Applicability, section 2105.10(a) . |
2105.11 | Graphic Arts Systems | 6/8/13 | 10/6/14, 79 FR 60061, 10/6/14 | Revision to Exempt Other, section 2105.11(f) . |
2105.12 | Volatile Organic Compound Storage Tanks | 10/20/95 | 11/14/02, 67 FR 68935 | (c)(192). |
2105.13 | Gasoline Loading Facilities | 10/20/95 | 11/14/02, 67 FR 68935 | (c)(192). |
2105.14 | Gasoline Dispensing Facilities-Stage II Control | 7/10/05 | 1/17/08, 73 FR 3190 | |
2105.15 | Degreasing Operations | 10/20/95 | 11/14/02, 67 FR 68935 | (c)(192). |
2105.16 | Cutback Asphalt Paving | 10/20/95 | 11/14/02, 67 FR 68935 | (c)(192). |
2105.17 | Ethylene Production Processes | 10/20/95 | 11/14/02, 67 FR 68935 | (c)(192). |
2105.19 | Synthetic Organic Chemical & Polymer Manufacturing-Fugitive Sources | 10/20/95 | 11/14/02, 67 FR 68935 | (c)(192). |
Subpart 2-Stag, Coke, and Miscellaneous Sulfur Sources | ||||
2105.20 | Slag Quenching | 10/20/95 | 11/14/02, 67 FR 68935 | (c)(192). |
2105.21 | Coke Ovens and Coke Oven Gas | 4/1/07 | 7/13/09, 74 FR 33329 | Revision to paragraph 2105.21.f (Combustion Stacks). |
2. EPA approved revisions effective 10/20/95 on 11/14/02 (67 FR 68935) at (c)(192). | ||||
2105.22 | Miscellaneous Sulfur Emitting Processes | 10/20/95 | 11/14/02, 67 FR 68935 | (c)(192). |
Subpart 3-Incineration and Combustion Sources | ||||
2105.30 (except paragraphs .b.3 and .f) | Incinerators | 10/20/95 | 11/14/02, 67 FR 68935 | (c)(192); Section 2105.30 .f. is federally enforceable as part of the applicable section 111(d) plan. |
Subpart 4-Miscellaneous Fugitive Sources | ||||
2105.40 | Permit Source Premises | 10/20/95 | 11/14/02, 67 FR 68935 | (c)(192). |
2105.41 | Non-Permit Premises | 10/20/95 | 11/14/02, 67 FR 68935 | (c)(192). |
2105.42 | Parking Lots and Roadways | 10/20/95 | 11/14/02, 67 FR 68935 | (c)(192). |
2105.43 | Permit Source Transport | 10/20/95 | 11/14/02, 67 FR 68935 | (c)(192). |
2105.44 | Non-Permit Source Transport | 10/20/95 | 11/14/02, 67 FR 68935 | (c)(192). |
2105.45 | Construction and Land Clearing | 10/20/95 | 11/14/02, 67 FR 68935 | (c)(192). |
2105.46 | Mining | 10/20/95 | 11/14/02, 67 FR 68935 | (c)(192). |
2105.47 | Demolition | 10/20/95 | 11/14/02, 67 FR 68935 | (c)(192). |
2105.48 | Areas Subject to Sections 2105.40 Through 2105.47 | 10/20/95 | 11/14/02, 67 FR 68935 | (c)(192). |
2105.49.a, .b | Fugitive Emissions | 10/20/95 | 11/14/02, 67 FR 68935 | (c)(192). |
Subpart 5-Open Burning and Abrasive Blasting Sources | ||||
2105.50 | Open Burning | 11/25/2021 | 4/4/2024, 89 FR 23525 | |
Article XX, Section 533 | Abrasive Blasting | 10/9/86 | 10/19/87, 51 FR 38758 | (c)(69). |
Subpart 7-Miscellaneous VOC Sources | ||||
2105.70 | Petroleum Refineries | 10/20/95 | 11/14/02, 67 FR 68935 | (c)(192). |
2105.71 | Pharmaceutical Products | 10/20/95 | 11/14/02, 67 FR 68935 | (c)(192). |
2105.72 | Manufacturer of Pneumatic Rubber Tires | 10/20/95 | 11/14/02, 67 FR 68935 | (c)(192). |
2105.74 | Aerospace Manufacturing and Rework | 7/10/03 | 6/24/05, 70 FR 36511 | |
2105.75 | Mobile Equipment Repair and Refinishing | 7/10/03 | 6/24/05, 70 FR 36511 | |
2105.76 | Wood Furniture Manufacturing Operations | 7/10/03 | 6/24/05, 70 FR 36511 | |
2105.77 | Control of VOC Emissions from Large Appliance and Metal Furniture Surface Coating Processes | 5/24/10 | 12/28/10, 75 FR 81480 | New Regulation. |
2105.78 | Control of VOC Emissions from Flat Wood Paneling Coating Processes | 5/24/10 | 12/28/10, 75 FR 81480 | New Regulation. |
2105.79 | Control of VOC Emissions from Paper, Film, and Foil Surface Coating Processes | 5/24/10 | 12/28/10, 75 FR 81480 | New Regulation. |
2105.80 | Control of VOC Emissions from Offset Lithographic Printing and Letterpress Printing | 6/8/13 | 10/6/14, 79 FR 60059, 10/6/14 | New Regulation |
2105.81 | Control of VOC Emissions from Flexible Package Printing | 6/8/13 | 10/6/14,79 FR 60059, 10/6/14 | New Regulation |
2105.82 | Control of VOC Emissions from Industrial Solvent Cleaning Operations | 6/8/13 | 10/6/14,79 FR 60059, 10/6/14 | New Regulation |
2105.83 | Control of VOC Emissions from Miscellaneous Metal and/or Plastic Parts Surface Coating Processes | 6/8/13 | 1/20/16, 81 FR 2993 | New regulation. |
2105.84 | Control of VOC Emissions from Automobile and Light-Duty Truck Assembly Coatings | 6/8/13 | 1/20/16, 81 FR 2993 | New regulation. |
2105.85 | Control of VOC Emissions from Miscellaneous Industrial Adhesives | 6/8/13 | 1/20/16, 81 FR 2993 | New regulation. |
2105.86 | Control of VOC Emissions from Fiberglass Boat Manufacturing Materials | 6/19/15 | 1/20/16, 81 FR 2993 | New regulation. |
Subpart 8-Additional Miscellaneous VOC Sources | ||||
2105.88 | Consumer Products | 4/3/12 | 11/29/12, 77 FR 71115 | New section is added. |
Subpart 10-NOXSources | ||||
2105.101 | Control of NOX Emissions from Glass Melting Furnaces | 4/3/12 | 11/29/12, 77 FR 71117 | New subpart and section are added. |
Part F-Air Pollution Episodes | ||||
2106.01 | Air Pollution Episode System | 10/20/95 | 11/14/02, 67 FR 68935 | (c)(192). |
2106.02 | Air Pollution Source Curtailment Plans | 10/20/95 | 11/14/02, 67 FR 68935 | (c)(192). |
2106.03 | Episode Criteria | 10/20/95 | 11/14/02, 67 FR 68935 | (c)(192). |
2106.04 | Episode Actions | 10/20/95 | 11/14/02, 67 FR 68935 | (c)(192). |
2106.05 | USX-Clairton Works PM-10 Self Audit Emergency Action Plan | 8/15/97 | 6/12/98, 63 FR 32126 | (c)(133)(i)(B)(3). |
2106.06 | Mon Valley Air Pollution Episode | 11/25/2021 | 4/4/2024, 89 FR 23525 | |
Part G-Methods | ||||
2107.01 | General | 10/20/95 | 1/14/02, 67 FR 68935 | (c)(192). |
2107.02 | Particulate Matter | 10/20/95 | 11/14/02, 67 FR 68935 | (c)(192). |
2107.03 | Sulfur Oxides | 10/20/95 | 11/14/02, 67 FR 68935 | (c)(192). |
2107.04 (except paragraph .04.h) | Volatile Organic Compounds | 10/20/95 | 11/14/02, 67 FR 68935 | (c)(192). |
2107.05 | Nitrogen Oxides | 10/20/95 | 11/14/02, 67 FR 68935 | (c)(192). |
2107.06 | Incinerator Temperatures | 10/20/95 | 11/14/02, 67 FR 68935 | (c)(192). |
2107.07 | Coke Oven Emissions | 10/20/95 | 11/14/02, 67 FR 68935 | (c)(192). |
2107.08 | Coke Oven Gas | 10/20/95 | 11/14/02, 67 FR 68935 | (c)(192). |
2107.10 | Sulfur Content of Coke | 10/20/95 | 11/14/02, 67 FR 68935 | (c)(192). |
2107.11 | Visible Emissions | 4/1/07 | 7/13/09, 74 FR 3329 | |
2107.16 | Sulfur in Fuel Oil | 12/08/2017 | 5/2/2019, 84 FR 18739 | |
2107.20.c, .g through .j, .m and .n | Ambient Measurements | 10/20/95 | 11/14/02, 67 FR 68935 | (c)(192). |
Part H-Reporting, Testing & Monitoring | ||||
2108.01 | Reports Required | 10/20/95 | 11/14/02, 67 FR 68935 | (c)(192). |
2108.01.a. | Termination of Operation | 10/20/95 | 11/14/02, 67 FR 68935 | (c)(192). |
2108.01.b | Shutdown of Control Equipment | 10/20/95 | 11/14/02, 67 FR 68935 | (c)(192). |
2108.01.c | Breakdowns | 10/20/95 | 11/14/02, 67 FR 68935 | (c)(192). |
2108.01.d. | Cold Start | 10/20/95 | 11/14/02, 67 FR 68935 | (c)(192). |
2108.01.e (Except paragraphs e.1.A &.B) | Emissions Inventory Statements | 10/20/95 | 11/14/02, 67 FR 68935 | (c)(192). |
2108.01.f | Orders | 10/20/95 | 11/14/02, 67 FR 68935 | (c)(192). |
2108.01.g | Violations | 10/20/95 | 11/14/02, 67 FR 68935 | (c)(192). |
2108.02 | Emissions Testing | 10/20/95 | 11/14/02, 67 FR 68935 | (c)(192). |
2108.03 | Continuous Emission Monitoring | 4/1/07 | 7/13/09, 74 FR 3329 | Revision to paragraph 2108.03.f (Violations). |
2108.04 | Ambient Monitoring | 10/20/95 | 11/14/02, 67 FR 68935 | (c)(192). |
Part I-Enforcement | ||||
2109.01 | Inspections | 10/20/95 | 11/14/02, 67 FR 68935 | (c)(192). |
2109.02 (except paragraph.02.a.7) | Remedies | 9/25/13 | 4/8/20, 85 FR 19669 | Changed references of "Board of County Commissioners" to "County Executive." (c)(192). |
2109.03 (except under a. subsections 1, 2, 3) | Enforcement Orders | 9/25/13 | 4/8/20, 85 FR 19669 | Paragraph (b) was revised to add "or the Manager of the Air Quality Program, or their respective designee" as an additional signatory option on enforcement orders. In paragraph (d) "Board of County Commissioners" was changed to "County Council." In paragraph (d)(1), "Bureau of Environmental Quality Division of Air Quality" was changed to "Air Quality Program of the Department." (c)(192). |
2109.04 | Orders Establishing an Additional or More Restrictive Standard | 10/20/95 | 11/14/02, 67 FR 68935 | (c)(192). |
2109.05 | Emergency Orders | 10/20/95 | 11/14/02, 67 FR 68935 | (c)(192). |
2109.06 (Except paragraphs .06.a.2, .a.3, and .a.4) | Civil Proceedings | 10/20/95 | 11/14/02, 67 FR 68935 | (c)(192). |
2109.10 | Appeals | 10/20/95 | 11/14/02, 67 FR 68935 | (c)(192). |
2109.20 | General Federal Conformity | 10/20/95 | 11/14/02, 67 FR 68935 | (c)(192). |
Rule citation | Title/subject | State effective date | EPA approval date | Additional explanation/ § 52.2063 citation |
Title 3-Air Management Code | ||||
Chapter 3-100 | General Provisions | 10/20/69 | 5/31/72, 37 FR 10842 | (c)(1). |
Chapter 3-200 | Prohibited Conduct | 06/18/15 | 5/31/2019, 84 FR 25179 | Section 3-207 was amended to lower the allowable sulfur content in fuel oils in Philadelphia County. |
Chapter 3-300 | Administrative Provisions | 9/21/72 | 3/12/79, 44 FR 13480 | (c)(15). |
Regulation I-General Provisions | ||||
Section I | Definitions | 4/29/70 | 5/31/72, 37 FR 10842 | (c)(1). |
Section II (Except portions of paragraph II.B) | Source Registration and Emission Reporting | 5/4/74 | 9/9/75, 40 FR 41787 | (c)(12). |
Section III | Testing and Test Methods | 4/29/70 | 5/31/72, 37 FR 10842 | (c)(1). |
Section IV | Availability of Technology | 4/29/70 | 5/31/72, 37 FR 10842 | (c)(1). |
Section V | Improvement and Plan | 4/29/70 | 5/31/72, 37 FR 10842 | (c)(1). |
Section VI | Pre-existing Regulations | 4/29/70 | 5/31/72, 37 FR 10842 | (c)(1). |
Section VII | Circumvention | 4/29/70 | 5/31/72, 37 FR 10842 | (c)(1). |
Section VIII | Severability | 4/29/70 | 5/31/72, 37 FR 10842 | (c)(1). |
Section IX | Effective Date | 4/29/70 | 5/31/72, 37 FR 10842 | (c)(1). |
Section XI.D | Compliance with Federal Regulations-Stack Height Regulations | 3/27/86 | 1/23/89, 54 FR 3029 | (c)(70). |
Regulation II-Air Contaminant and Particulate Matter Emissions | ||||
Section I | No Title [General Provisions] | 4/29/70 | 5/31/72, 37 FR 10842 | (c)(1). |
Section II | Open Fires | 4/29/70 | 5/31/72, 37 FR 10842 | (c)(1). |
Section IV | Visible Emissions | 5/4/74 | 9/9/75, 40 FR 41787 | (c)(12). |
Section V | Particulate Matter Emissions from the Burning of Fuels | 8/27/81 | 4/16/82, 47 FR 16325 | (c)(43). |
Section VI | Selection of Fuel for Particulate Matter Emission Control | 4/29/70 | 5/31/72, 37 FR 10842 | (c)(1). |
Section VII | Particulate Matter Emissions from Chemical, Metallurgical, Mechanical and Other Processes | 4/29/70 | 5/31/72, 37 FR 10842 | (c)(1). |
Section VIII | Fugitive Dust | 4/29/70 | 5/31/72, 37 FR 10842 | (c)(1). |
Table 1 | No Title [Allowable Process Weight Emissions] | 4/29/70 | 5/31/72, 37 FR 10842 | (c)(1). |
Regulation III-The Control of Emissions of Oxides and Sulfur Compounds | ||||
Section I | No Title [General Provisions] | 11/25/15 | 5/31/2019, 84 FR 25179 | |
Section II | Control of Sulfur Compound Emissions | 11/25/15 | 5/31/2019, 84 FR 25179 | |
Section III | Control of Sulfur in Fuels | 11/25/15 | 5/31/2019, 84 FR 25179 | |
Regulation IV-Governing Air Pollution Control Measures During High Air Pollution Episodes | ||||
Section I | Definitions | 2/5/71 | 5/31/72, 37 FR 10842 | (c)(1). |
Section II | Declaration of Conditions | 2/5/71 | 5/31/72, 37 FR 10842 | (c)(1). |
Section III | Termination of Conditions | 2/5/71 | 5/31/72, 37 FR 10842 | (c)(1). |
Section IV | Alert and Notification System by the Health Commissioner and the Emergency Coordinator | 2/5/71 | 5/31/72, 37 FR 10842 | (c)(1). |
Section V | Advance Preparation for High Air Pollution Episodes | 2/5/71 | 5/31/72, 37 FR 10842 | (c)(1) |
Section VI | Actions and Restrictions | 2/5/71 | 5/31/72, 37 FR 10842 | (c)(1). |
Section VII | Severability | 2/5/71 | 5/31/72, 37 FR 10842 | (c)(1). |
Section VIII | Effective Date | 2/5/71 | 5/31/72, 37 FR 10842 | (c)(1). |
Table I | Minimum Abatement Strategies for Emission Reduction Plans-Stage I Condition | 2/5/71 | 5/31/72, 37 FR 10842 | (c)(1). |
Table II | Minimum Abatement Strategies for Emission Reduction Plans-Stage II Condition | 2/5/71 | 5/31/72, 37 FR 10842 | (c)(1). |
Table III | Minimum Abatement Strategies for Emission Reduction Plans-Emergency Condition | 2/5/71 | 5/31/72, 37 FR 10842 | (c)(1). |
Table IV | Emergency Business and Establishment List | 2/5/71 | 5/31/72, 37 FR 10842 | (c)(1). |
Regulation V-Control of Emissions of Organic Substances From Stationary Sources | ||||
Section I (Except for definitions related to section V, paragraphs C and D) | Definitions | 4/26/2010 | 10/7/2016, 81 FR 69691 | Amended to include definitions related to AMR V Sections XV and XVI. Exempted definitions were addressed in a previous approval. See 58 FR 33200 (June 16, 1993). |
Section II | Storage Tanks | 7/10/71 | 5/31/72, 37 FR 10842 | (c)(1). |
Section III | Oil-Effluent Water Separator | 7/10/71 | 5/31/72, 37 FR 10842 | (c)(1). |
Section IV | Pumps and Compressors | 7/10/71 | 5/31/72, 37 FR 10842 | (c)(1). |
Section V (Except paragraphs V.C and V.D) | Organic Material Loading | 7/10/71 | 5/31/72, 37 FR 10842 | (c)(1). |
Section VI | Solvents | 7/10/71 | 5/31/72, 37 FR 10842 | (c)(1). |
Section VII | Processing of Photochemically Reactive Materials | 7/10/71 | 5/31/72, 37 FR 10842 | (c)(1). |
Section VIII | Architectural Coatings | 7/10/71 | 5/31/72, 37 FR 10842 | (c)(1). |
Section IX | Disposal of Solvents | 7/10/71 | 5/31/72, 37 FR 10842 | (c)(1). |
Section X | Compliance with Pennsylvania Standards for Volatile Organic Compounds (VOC) | 11/28/86 | 6/16/93, 58 FR 33192 | (c)(82). |
Section XI | Petroleum Solvent Dry Cleaning | 11/28/86 | 4/12/93, 58 FR 19066 | (c)(77). |
Section XII | Pharmaceutical Tablet Coating | 11/28/86 | 6/16/93, 58 FR 33200 | (c)(83). |
Section XIII | Process Equipment Leaks | 5/23/98 | 4/6/93, 58 FR 17778 | (c)(78). |
Section XV | Control of Volatile Organic Compounds (VOC) from Marine Vessel Coating Operations | 4/26/10 | 10/7/16, 81 FR 69691 | Addresses RACT requirements for the ozone NAAQS under EPA's CTGs. |
Section XVI | Synthetic Organic Manufacturing Industry (SOCMI) Air Oxidation, Distillation, and Reactor Processes | 4/26/10 | 10/7/16, 81 FR 69691 | Addresses RACT requirements for the ozone NAAQS under EPA's CTGs. |
Section XXII | Circumvention | 7/10/71 recodified 5/23/88 | 5/31/72, 37 FR 10842 | (c)(1). |
Section XXIII | Severability | 7/10/71 recodified 5/23/88 | 5/31/72, 37 FR 10842 | (c)(1). |
Section XXIV | Effective Date | 7/10/71 recodified 5/23/88 | 5/31/72, 37 FR 10842 | (c)(1). |
Regulation VII-Control of Emissions of Nitrogen Oxides From Stationary Sources | ||||
Section I | Definitions | 7/1/72 | 5/14/73, 38 FR 12696 | (c)(7). |
Section II | Fuel Burning Equipment | 11/20/85 | 1/14/87, 52 FR 1456 | (c)(65). |
Section III | Nitric Acid Plants | 7/1/72 | 5/14/73, 38 FR 12696 | (c)(7). |
Section IV | Emissions Monitoring | 7/1/72 | 5/14/73, 38 FR 12696 | (c)(7). |
Section V | Circumvention | 7/1/72 | 5/14/73, 38 FR 12696 | (c)(7). |
Section VI | Severability | 7/1/72 | 5/14/73, 38 FR 12696 | (c)(7). |
Section VII | Effective Date | 7/1/72 | 5/14/73, 38 FR 12696 | (c)(7). |
Regulation VIII-Control of Emissions of Carbon Monoxide From Stationary Sources | ||||
Section I | Definitions | 8/20/72 | 5/14/73, 38 FR 12696 | (c)(7). |
Section II | General | 8/20/72 | 5/14/73, 38 FR 12696 | (c)(7). |
Section III | Emissions Monitoring | 8/20/72 | 5/14/73, 38 FR 12696 | (c)(7). |
Section IV | Circumvention | 8/20/72 | 5/14/73, 38 FR 12696 | (c)(7). |
Section V | Severability | 8/20/72 | 5/14/73, 38 FR 12696 | (c)(7). |
Section VI | Effective Date | 8/20/72 | 5/14/73, 38 FR 12696 | (c)(7). |
Regulation XI-Control of Emissions From Incinerators | ||||
Section I | Definitions | 5/4/74 | 9/9/75, 40 FR 41787 | (c)(12). |
Section II | General Provisions | 5/4/74 | 9/9/75, 40 FR 41787 | (c)(12). |
Section III (Except paragraph III.E. (odors)) | Emissions Limitations | 5/4/74 | 9/9/75, 40 FR 41787 | (c)(12). |
Section IV | Design | 5/4/74 | 9/9/75, 40 FR 41787 | (c)(12). |
Section V | Operation | 5/4/74 | 9/9/75, 40 FR 41787 | (c)(12). |
Section VI | Permits and Licenses | 5/4/74 | 9/9/75, 40 FR 41787 | (c)(12). |
Section VII | Circumvention | 5/4/74 | 9/9/75, 40 FR 41787 | (c)(12). |
Section VIII | Severability | 5/4/74 | 9/9/75, 40 FR 41787 | (c)(12). |
Section IX | Effective Date | 5/4/74 | 9/9/75, 40 FR 41787 | (c)(12). |
Regulation XIII-Construction, Modification, Reactivation and Operation of Sources | ||||
Section I | Introduction | 10/30/95 | 3/28/03, 68 FR 15059 | (c)(203). |
Section II | Program Adoption | 10/30/95 | 3/28/03, 68 FR 15059 | (c)(203). |
Name of source | Permit No. | County | State effective date | EPA approval date | Additional explanation/ §§ 52.2063 and 52.2064 citations1 |
For exceptions,seethe applicable paragraphs in 40 CFR § 52.2063(c) | |||||
ARCO Chemical Company | 04-313-052 | Beaver | 12/9/86 | 5/16/90, 55 FR 20267 | (c)(71). |
IMC Chemical Group | 39-313-014 | Lehigh | 12/10/86 | 5/16/90, 55 FR 20267 | (c)(72). |
Aristech Chemical Corp | 86-I-0024-P | Allegheny | 8/28/86 3/3/87 | 6/16/93, 58 FR 33197 | (c)(80). |
The Knoll Group | 46-326-001A | Montgomery | 3/24/93 | 10/19/93, 58 FR 53885 | (c)(87). |
ESSROC Materials | PA-48-0004A | Northampton | 12/20/94 | 08/8/95, 60 FR 40292 | (c)(98)(i)(B)(1). |
Pennsylvania Power and Light Co. (PP&L)-Brunner Island | PA-67-2005 | York | 12/22/94 | 8/8/95, 60 FR 40292 | (c)(98)(i)(B)(2). |
PPG Industries, Inc.-South Middleton | OP-21-2002 | Cumberland | 12/22/94 | 08/8/95, 60 FR 40292 | (c)(98)(i)(B)(3). |
Stroehmann Bakeries-Dauphin County | PA-22-2003 | Dauphin | 12/22/94 | 8/8/95, 60 FR 40292 | (c)(98)(i)(B)(4). |
General Electric Transportation Systems-Erie | OP-25-025 | Erie | 12/21/94 | 8/8/95, 60 FR 40292 | See also 52.2064(c)(4). |
J. E. Baker Co. (Refractories)-York | OP-67-2001 | York | 12/22/94 | 8/8/95, 60 FR 40292 | See also 52.2064(c)(8). |
Lafarge Corp | OP-39-0011 | Lehigh | 12/23/94 | 8/8/95, 60 FR 40292 | (c)(98)(i)(B)(7). |
Lafarge Corp | PA-39-0011A | Lehigh | 12/23/94 | 8/8/95, 60 FR 40292 | (c)(98)(i)(B)(7). |
West Penn Power-Armstrong | PA-03-000-023 | Armstrong | 12/29/94 | 8/8/95, 60 FR 40292 | (c)(98)(i)(B)(8). |
West Penn Power-Armstrong | PA-03-306-004 | Armstrong | 3/28/94 | 8/8/95, 60 FR 40292 | (c)(98)(i)(B)(8). |
West Penn Power-Armstrong | PA-03-306-006 | Armstrong | 11/22/94 | 8/8/95, 60 FR 40292 | (c)(98)(i)(B)(8). |
Plain and Fancy Kitchens, Inc | PA-38-318-019C | Lebanon | 12/23/94 | 8/8/95, 60 FR 40292 | (c)(98)(i)(B)(9). |
Stroehmann Bakeries-Bradford County | PA-08-0001 | Bradford | 2/9/95 | 8/10/95, 60 FR 40758 | (c)(101)(i)(B). |
Stroehmann Bakeries-Bradford County | OP-08-0001A | Bradford | 2/9/95 | 8/10/95, 60 FR 40758 | (c)(101)(i)(B). |
Stroehmann Bakeries-Lycoming County | PA-41-0001 | Lycoming | 2/9/95 | 08/10/95, 60 FR 40758 | (c)(101)(i)(B). |
Stroehmann Bakeries-Lycoming County | OP-41-0001A | Lycoming | 2/9/95 | 08/10/95, 60 FR 40758 | (c)(101)(i)(B). |
Philadelphia Electric Co. (PECO)-Eddystone | OP-23-0017 | Delaware | 12/28/94 | 9/8/95, 60 FR 46768 | (c)(102)(i)(B)(1). |
Philadelphia Electric Co. (PECO)-Eddystone | PA-23-0017 | Delaware | 12/28/94 | 9/8/95, 60 FR 46768 | (c)(102)(i)(B)(1). |
Gilberton Power Co.-John Rich Memorial | OP-54-0004 | Schuylkill | 12/20/94 | 9/8/95, 60 FR 46768 | (c)(102)(i)(B)(2). |
Bethlehem Steel-Coke and Chemical Production | OP-48-0013 | Northampton | 12/20/94 | 09/8/95, 60 FR 46768 | (c)(102)(i)(B)(3). |
Bethlehem Steel-Foundry | OP-48-0014 | Northampton | 12/20/94 | 9/8/95, 60 FR 46768 | (c)(102)(i)(B)(3). |
Bethlehem Steel-Structural Products | OP-48-0010 | Northampton | 12/20/94 | 9/8/95, 60 FR 46768 | (c)(102)(i)(B)(3). |
Bethlehem Steel-Forging | OP-48-0015 | Northampton | 12/20/94 | 9/8/95, 60 FR 46768 | (c)(102)(i)(B)(3). |
Westwood Energy Properties, Inc. (CRS Sirrine, Inc.) | OP-54-000-6 | Schuylkill | 12/27/94 | 09/8/95, 60 FR 46768 | (c)(102)(i)(B)(4). |
PECO Energy Co.-Front Street | OP-46-0045 | Montgomery | 3/31/95 | 9/8/95, 60 FR 46768 | (c)(102)(i)(B)(5). |
Crawford Furniture Manufacturing Corp.-Clarion County | OP-16-021 | Clarion | 3/27/95 | 9/8/95, 60 FR 46768 | (c)(102)(i)(B)(6). |
Schuylkill Energy Resources | OP-54-0003 | Schuylkill | 5/19/95 | 9/8/95, 60 FR 46768 | (c)(102)(i)(B)(7). |
Columbia Gas Transmission Corp.-Milford Compressor Station | OP-52-0001 | Pike | 4/21/95 | 9/8/95, 60 FR 46768 | (c)(102)(i)(B)(9). |
Texas Eastern Transmission Corp.-Entriken Compressor Station | OP-31-2003 | Huntingdon | 5/16/95 | 9/8/95, 60 FR 46768 | (c)(102)(i)(B)(10). |
Columbia Gas Transmission Corp.-Greencastle Compressor Station | OP-28-2003 | Franklin | 4/21/95 | 9/8/95, 60 FR 46768 | (c)(102)(i)(B)(11). |
Lord Corporation-Aerospace Div | OP-25-095 | Erie | 3/30/95 | 9/8/95, 60 FR 46768 | (c)(102)(i)(B)(12). |
Tennessee Gas Pipeline Co. (TENNECO)-Station 313 | PA-53-0001 OP-53-0001 CP-53-0001 | Potter | 11/27/95 | 4/09/96, 61 FR 15709 | (c)(103)(i)(B)(1). |
Corning Asahi Video Products-State College | OP-14-0003 | Centre | 12/27/94 | 4/09/96, 61 FR 15709 | (c)(103)(i)(B)(2). |
Corning Asahi Video Products-State College | OP-14-309-009C | Centre | 5/5/94 | 4/09/96, 61 FR 15709 | (c)(103)(i)(B)(2). |
Corning Asahi Video Products-State College | OP-14-309-010A | Centre | 8/18/94 | 4/09/96, 61 FR 15709 | (c)(103)(i)(B)(2). |
Corning Asahi Video Products-State College | OP-14-309-037A | Centre | 5/5/94 | 4/09/96, 61 FR 15709 | (c)(103)(i)(B)(2). |
Columbia Gas Transmission Corp.-Easton Compressor Station | OP-48-0001 PA-48-0001A | Northampton | 5/19/95 | 4/09/96, 61 FR 15709 | (c)(103)(i)(B)(3). |
Texas Eastern Transmission Corp.-Bedford Compressor Station | OP-05-2007 | Bedford | 5/16/95 | 4/09/96, 61 FR 15709 | (c)(103)(i)(B)(4). |
Texas Eastern Transmission Corp.-Marietta Compressor Station | PA-36-2025 | Lancaster | 5/16/95 | 4/09/96, 61 FR 15709 | (c)(103)(i)(B)(5). |
Hercules Cement Co | OP-48-0005 PA-48-0005A | Northampton | 12/23/94 | 4/09/96, 61 FR 15709 | (c)(103)(i)(B)(6). |
ESSROC (formerly Lone Star Industries, Inc.) | OP-48-0007 | Northampton | 12/29/94 | 4/09/96, 61 FR 15709 | (c)(103)(i)(B)(7). |
Pennsylvania Power and Light Co. (PP&L)-Montour | OP-47-0001 PA-47-0001A | Montour | 12/27/94 | 4/09/96, 61 FR 15709 | (c)(103)(i)(B)(8). |
Pennsylvania Electric Co. (PENELEC)-Shawville | PA-17-0001 | Clearfield | 12/27/94 | 4/09/96, 61 FR 15709 | (c)(103)(i)(B)(9). |
Zinc Corp. of America-Potter Twp | OP-04-000-044 | Beaver | 12/29/94 | 4/09/96, 61 FR 15709 | (c)(103)(i)(B)(10). |
The Proctor and Gamble Paper Products Company Mehoopany | OP-66-0001 PA-66-0001A | Wyoming | 12/20/94 | 4/09/96, 61 FR 15709 | (c)(103)(i)(B)(11). |
Columbia Gas Transmission Corp.-Union City Compressor Station | OP-25-892 | Erie | 4/11/95 | 4/09/96, 61 FR 15709 | (c)(103)(i)(B)(12). |
James River Corp.-Chambersburg | OP-28-2006 | Franklin | 6/14/95 | 02/12/96, 61 FR 05303 | (c)(104)(i)(C)(1). |
Appleton Papers, Inc.-Harrisburg | OP-21-2004 | Cumberland | 5/24/95 | 02/12/96, 61 FR 05303 | (c)(104)(i)(C)(2). |
Air Products and Chemicals, Inc.-Corporate R & D | OP-39-0008 | Lehigh | 5/25/95 | 02/12/96, 61 FR 05303 | (c)(104)(i)(C)(3). |
Elf Atochem North America, Inc.-King of Prussia | OP-46-0022 | Montgomery | 6/27/95 | 02/12/96, 61 FR 05303 | (c)(104)(i)(C)(4). |
York City Sewer Authority (Wastewater Treatment Plant) | OP-67-2013 | York | 3/1/95 | 02/12/96, 61 FR 05303 | (c)(104)(i)(C)(5). |
Glasgow, Inc.-Ivy Rock | OP-46-0043 | Montgomery | 6/7/95 | 02/12/96, 61 FR 05303 | (c)(104)(i)(C)(6). |
Glasgow, Inc.-Spring House | OP-46-0029 | Montgomery | 6/7/95 | 02/12/96, 61 FR 05303 | (c)(104)(i)(C)(7). |
Glasgow, Inc.-Catanach | OP-15-0021 | Chester | 6/7/95 | 02/12/96, 61 FR 05303 | (c)(104)(i)(C)(8). |
Glasgow, Inc.-Freeborn | OP-23-0026 | Delaware | 6/7/95 | 02/12/96, 61 FR 05303 | (c)(104)(i)(C)(9). |
UGI Utilities-Hunlock Creek | OP-40-0005 PA-40-0005A | Luzerne | 12/20/94 | 05/16/96, 61 FR 24706 | (c)(108)(i)(B)(1). |
Solar Turbines, Inc. (York Cogeneration Facility) | PA-67-2009 | York | 8/17/95 | 05/16/96, 61 FR 24706 | (c)(108)(i)(B)(2). |
Solar Turbines, Inc. (York Cogeneration Facility) | CP-67-2009 | York | 8/17/95 | 05/16/96, 61 FR 24706 | (c)(108)(i)(B)(2). |
Columbia Gas Transmission Corp.-Renovo Compressor Station | OP-18-0001 PA-18-0001 | Clinton | 7/18/95 | 05/16/96, 61 FR 24706 | (c)(108)(i)(B)(3). |
National Fuel Gas Supply Corp.-East Fork Compressor Station | OP-53-0007 PA-53-0007A | Potter | 7/17/95 | 05/16/96, 61 FR 24706 | (c)(108)(i)(B)(4). |
York County Solid Waste & Refuse Authority (Y.C.R.R.C.) | PA-67-2006 | York | 8/25/95 | 05/16/96, 61 FR 24706 | (c)(108)(i)(B)(5). |
W. R. Grace and Co.-FORMPAC Div | PA-06-1036 | Berks | 5/12/95 | 5/16/96, 61 FR 24706 | See also 52.2064(b)(2). |
W. R. Grace and Co.-Reading Plant | PA-06-315-001 | Berks | 6/4/92 | 5/16/96, 61 FR 24707 | See also 52.2064(b)(2). |
CNG Transmission Corp.-Cherry Tree Sta | PA-32-000-303 | Indiana | 7/5/95 | 05/16/96, 61 FR 24706 | (c)(108)(i)(B)(7). |
EPC Power Corp. of Bethlehem (Crozer Chester CoGen) | OP-23-0007 | Delaware | 6/8/95 | 05/16/96, 61 FR 24706 | (c)(108)(i)(B)(8). |
C-P Converters, Inc.-York | OP-67-2030 | York | 8/30/95 | 05/16/96, 61 FR 24706 | (c)(108)(i)(B)(9). |
Fisher Scientific Co. International-Indiana | OP-32-000-100 | Indiana | 7/18/95 | 05/16/96, 61 FR 24706 | (c)(108)(i)(B)(10). |
Adelphi Kitchens, Inc.-Robesonia Factory | OP-06-1001 | Berks | 4/4/95 | 05/16/96, 61 FR 24706 | (c)(108)(i)(B)(11). |
Birchcraft Kitchens, Inc.-Reading Factory | OP-06-1005 | Berks | 4/4/95 | 05/16/96, 61 FR 24706 | (c)(108)(i)(B)(12). |
Glasgow, Inc.-Bridgeport Asphalt Plant | OP-46-0044 | Montgomery | 6/7/95 | 05/16/96, 61 FR 24706 | (c)(108)(i)(B)(13). |
Caparo Steel Co.-Farrell | OP-43-285 | Mercer | 11/3/95 | 12/20/96, 61 FR 67229 | See also 52.2064(i)(14); 52.2037(g). |
Sharon Steel Corp.-Farrell | OP-43-017 | Mercer | 11/3/95 | 12/20/96, 61 FR 67229 | (c)(113)(i)(B)(2); 52.2036(f); 52.2037(e). |
DMi Furniture, Inc.-Timely Plant #7 (Gettysburg) | OP-01-2001 | Adams | 6/13/95 | 03/12/97, 62 FR 11079 | (c)(114)(i)(B)(1). |
R. R. Donnelley and Sons Co.-Lancaster West Plant | OP-36-2026 | Lancaster | 7/14/95 | 03/12/97, 62 FR 11079 | (c)(114)(i)(B)(2). |
International Paper Company-Hammermill Papers Division | OP-18-0005 | Clinton | 12/27/94 | 1/29/97, 62 FR 04167 | (c)(115)(i)(B). |
Lucent Technology (formerly AT&T Corp.)-Reading | PA-06-1003 | Berks | 6/26/95 | 4/18/97, 62 FR 19051 | (c)(117)(i)(B)(1). |
Garden State Tanning, Inc.-Fleetwood Plant | PA-06-1014 | Berks | 6/21/95 | 4/18/97, 62 FR 19051 | (c)(117)(i)(B)(2). |
Glidden Co., The-Reading | OP-06-1035 | Berks | 2/15/96 | 4/18/97, 62 FR 19051 | (c)(117)(i)(B)(3). |
Maier's Bakery-Reading Plant | PA-06-1023 | Berks | 9/20/95 | 4/18/97, 62 FR 19047 | (c)(118)(i)(B)(1). |
Morgan Corp.-Morgantown Plant | OP-06-1025 | Berks | 8/31/95 | 4/18/97, 62 FR 19047 | (c)(118)(i)(B)(2). |
Allentown Cement Co., Inc.-Evansville Plant | PA-06-1002 | Berks | 10/11/95 | 4/18/97, 62 FR 19047 | (c)(118)(i)(B)(3). |
Quaker Maid (Schrock Cabinet Group)-Leesport | OP-06-1028 | Berks | 10/27/95 | 4/18/97, 62 FR 19047 | (c)(118)(i)(B)(4). |
Brentwood Industries, Inc.-Reading Plant | PA-06-1006 | Berks | 2/12/96 | 4/18/97, 62 FR 19047 | (c)(118)(i)(B)(5). |
Metropolitan Edison Co. (MetEd)-Titus Station | PA-06-1024 | Berks | 3/9/95 | 4/18/97, 62 FR 19047 | (c)(118)(i)(B)(6). |
ICI Fluoropolymers-Downingtown | PA-15-0009 CP-15-0009 | Chester | 10/3/95 | 4/18/97, 62 FR 19047 | (c)(118)(i)(B)(7). |
Synthetic Thread Co., Inc.-Bethlehem | PA-39-0007A | Lehigh | 8/10/95 | 4/18/97, 62 FR 19047 | (c)(118)(i)(B)(8). |
Bird-in-Hand Woodwork, Inc. (Childcraft Education Corp.) | OP-36-2022 | Lancaster | 9/27/95 | 4/18/97, 62 FR 19047 | (c)(118)(i)(B)(9). |
Heinz Pet Products-Bloomsburg | OP-19-0003 | Columbia | 11/27/95 | 08/21/97, 62 FR 44413 | (c)(119)(i)(B)(1). |
Graco Children's Products, Inc.-Elverson | OP-15-0006 | Chester | 11/30/95 | 08/21/97, 62 FR 44413 | (c)(119)(i)(B)(2). |
Texas Eastern Transmission Corp.-Bernville | OP-06-1033 | Berks | 1/31/97 | 4/18/97, 62 FR 19049 | See also 52.2064(a)(15). |
Texas Eastern Transmission Corp.-Bechtelsville | OP-06-1034 | Berks | 1/31/97 | 4/18/97, 62 FR 19049 | See also 52.2064(a)(19). |
Carpenter Technology Corp.-Reading Plant | OP-06-1007 | Berks | 9/27/96 | 4/18/97, 62 FR 19049 | See also 52.2064(i)(9). |
North American Fluoropolymers Co. (NAFCO) | 06-1026, CP-06-1026 | Berks | 4/19/95 6/1/95 | 4/18/97, 62 FR 19049 | (c)(120)(i)(B)(4), (ii)(B). |
CNG Transmission Corp.-Ellisburg Compressor Station | PA-53-0004A | Potter | 2/29/96 | 06/11/97, 62 FR 31732 | (c)(121)(i)(B)(1). |
CNG Transmission Corp.-Ellisburg Compressor Station | OP-53-0004 | Potter | 2/29/96 | 06/11/97, 62 FR 31732 | (c)(121)(i)(B)(1). |
CNG Transmission Corp.-Ellisburg Compressor Station | CP-53-0004A | Potter | 2/29/96 | 06/11/97, 62 FR 31732 | (c)(121)(i)(B)(1). |
CNG Transmission Corp.-Greenlick Compressor Station | PA-53-0003A | Potter | 12/18/95 | 06/11/97, 62 FR 31732 | (c)(121)(i)(B)(2). |
CNG Transmission Corp.-Greenlick Station | CP-53-0003A | Potter | 12/18/95 | 06/11/97, 62 FR 31732 | (c)(121)(i)(B)(2). |
CNG Transmission Corp.-Greenlick Compressor Station | OP-53-0003 | Potter | 2/18/95 | 06/11/97, 62 FR 31732 | (c)(121)(i)(B)(2). |
CNG Transmission Corp.-Crayne Station | 30-000-089 | Greene | 2/22/95 | 06/11/97, 62 FR 31732 | (c)(121)(i)(B)(3). |
CNG Transmission Corp.-State Line Station | OP-53-0008 | Potter | 1/10/96 | 06/11/97, 62 FR 31732 | (c)(121)(i)(B)(4). |
CNG Transmission Corp.-Big Run Station | PA-33-147 | Jefferson | 6/27/95 | 06/11/97, 62 FR 31732 | (c)(121)(i)(B)(5). |
Medusa Cement Company | OP-37-013 | Lawrence | 7/27/95 | 06/03/97, 62 FR 30250 | (c)(122)(i)(B)(1). |
Keystone Cement Co | OP-48-0003 | Northampton | 5/25/95 | 06/03/97, 62 FR 30250 | (c)(122)(i)(B)(2). |
Lehigh Portland Cement Company | OP-67-2024 | York | 5/26/95 | 06/03/97, 62 FR 30250 | (c)(122)(i)(B)(3). |
Mercer Lime and Stone Company | OP-10-023 | Butler | 5/31/95 | 06/03/97, 62 FR 30250 | (c)(122)(i)(B)(4). |
Con-Lime, Inc | OP-14-0001 | Centre | 6/30/95 | 6/3/97, 62 FR 30250 | See also 52.2064(c)(5). |
Pennzoil Products Co.-Rouseville | PA-61-016 | Venango | 9/8/95 | 06/11/97, 62 FR 31738 | (c)(124)(i)(B). |
R. R. Donnelley & Sons Co.-Lancaster East Plant | OP-36-2027 | Lancaster | 7/14/95 | 07/21/97, 62 FR 33891 | (c)(125)(i)(B); 52.2036j. |
Panther Creek Partners | OP-13-0003 | Carbon | 12/2/96 | 09/29/97, 62 FR 50871 | (c)(128)(i)(B). |
Allegro Microsystems, W.G., Inc.-Willow Grove | OP-46-0006 | Montgomery | 12/19/97 | 03/09/98, 63 FR 11370 | (c)(130)(i)(B)(1). |
Hale Products, Inc.-Conshohocken | OP-46-0057 | Montgomery | 11/21/97 | 03/09/98, 63 FR 11370 | (c)(130)(i)(B)(2). |
Con-Lime, Inc.-Bellefonte | OP-14-0001 | Centre | 1/7/98 | 3/9/98, 63 FR 11370 | See also 52.2064(c)(5). |
Coastal Aluminum Rolling Mills, Inc.-Williamsport | OP-41-0007 | Lycoming | 11/21/97 | 03/09/98, 63 FR 11370 | (c)(130)(i)(B)(4). |
ABP/International Envelope Co | OP-15-0023 | Chester | 11/2/95 | 03/09/98, 63 FR 11370 | (c)(130)(i)(B)(5). |
Brown Printing Company | CP-46-0018 | Montgomery | 9/26/96 10/27/97 | 03/09/98, 63 FR 11370 | (c)(130)(i)(B)(6). |
Fibre-Metal Products Company | OP-23-0025 | Delaware | 2/20/98 | 06/29/98, 63 FR 35145 | (c)(132)(i)(B)(1). |
Finnaren & Haley, Inc | OP-46-0070 | Montgomery | 3/5/98 | 06/29/98, 63 FR 35145 | (c)(132)(i)(B)(2). |
Fres-co System USA, Inc | OP-09-0027 | Bucks | 3/5/98 | 06/29/98, 63 FR 35145 | (c)(132)(i)(B)(3). |
Graphic Packaging Corporation | OP-15-0013 | Chester | 2/28/98 | 06/29/98, 63 FR 35145 | (c)(132)(i)(B)(4). |
Montour Oil Service Company, a division of Sun Company, Inc | OP-41-0013 | Lycoming | 3/19/98 | 06/29/98, 63 FR 35145 | (c)(132)(i)(B)(5). |
Atlantic Refining and Marketing Corp. (Sun Co., Inc. (R&M)) | OP-49-0015 | Northampton | 3/19/98 | 06/29/98, 63 FR 35145 | (c)(132)(i)(B)(6). |
Transwall Corporation | OP-15-0025 | Chester | 3/10/98 | 06/29/98, 63 FR 35145 | (c)(132)(i)(B)(7). |
Tavo Packaging (formerly Mead Packaging Company) | OP-09-0008 | Bucks | 11/8/95 | 06/29/98, 63 FR 35145 | (c)(132)(i)(B)(8). |
CNG Transmission Corp.-Harrison Compressor Station | PA-53-0005A | Potter | 4/16/96 | 10/8/98, 63 FR 54050 | (c)(134)(i)(B)(1). |
CNG Transmission Corp.-Harrison Compressor Station | OP-53-0005 | Potter | 4/16/96 | 10/8/98, 63 FR 54050 | (c)(134)(i)(B)(1). |
CNG Transmission Corp.-Harrison Station | CP-53-0005A | Potter | 4/16/96 | 10/8/98, 63 FR 54050 | (c)(134)(i)(B)(1). |
CNG Transmission Corp.-Leidy Station | PA-18-0004A | Clinton | 3/25/96 | 10/8/98, 63 FR 54050 | (c)(134)(i)(B)(2). |
CNG Transmission Corp.-Leidy Compressor Station | OP-18-0004 | Clinton | 2/29/96 | 10/8/98, 63 FR 54050 | (c)(134)(i)(B)(2). |
CNG Transmission Corp.-Leidy Station | CP-18-0004A | Clinton | 3/25/96 | 10/8/98, 63 FR 54050 | (c)(134)(i)(B)(2). |
CNG Transmission Corp.-Sabinsville Compressor Station | PA-59-0002A | Tioga | 12/18/95 | 10/8/98, 63 FR 54050 | (c)(134)(i)(B)(3). |
CNG Transmission Corp.-Sabinsville Compressor Station | OP-59-0002 | Tioga | 12/18/95 | 10/8/98, 63 FR 54050 | (c)(134)(i)(B)(3). |
CNG Transmission Corp.-Sabinsville Station | CP-59-0002A | Tioga | 12/18/95 | 10/8/98, 63 FR 54050 | (c)(134)(i)(B)(3). |
CNG Transmission Corp.-Tioga Station | OP-59-0006 | Tioga | 1/16/96 | 10/8/98, 63 FR 54050 | (c)(134)(i)(B)(4). |
Eldorado Properties Corp.-Northumberland Terminal | OP-49-0016 | Northumberland | 5/1/98 | 11/06/98, 63 FR 59884 | (c)(136)(i)(B)(1). |
Endura Products, Inc | OP-09-0028 | Bucks | 5/13/98 | 11/6/98, 63 FR 59884 | (c)(136)(i)(B)(2). |
Ford Electronics & Refrigeration Company | OP-46-0036 | Montgomery | 4/30/98 | 11/6/98, 63 FR 59884 | (c)(136)(i)(B)(3). |
H & N Packaging, Inc. (formerly Paramount Packaging Corp.) | OP-09-0038 | Bucks | 6/8/98 | 11/0/98, 63 FR 59884 | (c)(136)(i)(B)(4). |
Lancaster County Solid Waste Management Authority | 36-02013 | Lancaster | 6/3/98 | 11/6/98, 63 FR 59884 | (c)(136)(i)(B)(5). |
Monsey Products Co.-Kimberton | OP-15-0031 | Chester | 6/4/98 | 11/06/98, 63 FR 59884 | (c)(136)(i)(B)(6). |
Ortho-McNeil Pharmaceutical-Spring House | OP-46-0027 | Montgomery | 6/4/98 | 11/6/98, 63 FR 59884 | (c)(136)(i)(B)(7). |
Piccari Press, Inc | OP-09-0040 | Bucks | 4/29/98 | 11/6/98, 63 FR 59884 | (c)(136)(i)(B)(8). |
Pierce and Stevens Corp.-Kimberton | OP-15-0011 | Chester | 3/27/98 | 11/06/98, 63 FR 59884 | (c)(136)(i)(B)(9). |
PQ Corporation-Chester | OP-23-0016 | Delaware | 6/16/98 | 11/06/98, 63 FR 59884 | (c)(136)(i)(B)(10). |
Reynolds Metals Company Downington | OP-15-0004 | Chester | 5/8/98 | 11/6/98, 63 FR 59884 | (c)(136)(i)(B)(11). |
Rhone-Poulenc Rorer Pharmaceutical, Inc | OP-46-0048B | Montgomery | 4/2/98 | 11/6/98, 63 FR 59884 | (c)(136)(i)(B)(12). |
Superior Tube Company | OP-46-0020 | Montgomery | 4/17/98 | 11/06/98, 63 FR 59884 | See also 52.2064(g)(22). |
Uniform Tubes Inc | OP-46-0046A | Montgomery | 3/26/98 | 11/6/98, 63 FR 59884 | (c)(136)(i)(B)(14). |
U.S. Air Force-Willow Grove Air Reserve Station | OP-46-0072 | Montgomery | 5/1/98 | 11/6/98, 63 FR 59884 | (c)(136)(i)(B)(15). |
Naval Air Station, Joint Reserve Base-Willow Grove | OP-46-0079 | Montgomery | 5/4/98 | 11/6/98, 63 FR 59884 | (c)(136)(i)(B)(16). |
Columbia Gas Transmission Corp.-Artemas Compressor Station | 05-2006 | Bedford | 4/19/95 | 12/03/98, 63 FR 66755 | (c)(137)(i)B)(1). |
Columbia Gas Transmission Corp.-Donegal Compressor Station | 63-000-631 | Washington | 7/10/95 | 12/03/98, 63 FR 66755 | (c)(137)(i)B)(2). |
Columbia Gas Transmission Corp.-Gettysburg Compressor Station | 01-2003 | Adams | 4/21/95 | 12/03/98, 63 FR 66755 | (c)(137)(i)B)(3). |
Columbia Gas Transmission Corp.-Eagle Compressor Station | OP-15-0022 | Chester | 2/1/96 | 12/03/98, 63 FR 66755 | (c)(137)(i)B)(4). |
Columbia Gas Transmission Corp.-Downingtown | CP-15-0020 | Chester | 9/15/95 | 12/03/98, 63 FR 66755 | (c)(137)(i)B)(5). |
GKN Sinter Metals, Inc | OP-12-0002 | Cameron | 10/30/98 | 4/16/99, 64 FR 18821 | (c)(138)(i)(B)(1). |
Cabinet Industries, Inc.-Water Street Plant | OP-47-0005 | Montour | 9/21/98 | 4/16/99, 64 FR 18821 | (c)(138)(i)(B)(2). |
Springs Window Fashions Division, Inc | OP-41-0014 | Lycoming | 9/29/98 | 4/16/99, 64 FR 18821 | (c)(138)(i)(B)(3). |
Centennial Printing Corp | OP-46-0068 | Montgomery | 10/31/96 5/11/98 | 4/16/99, 64 FR 18821 | (c)(138)(i)(B)(4). |
Strick Corp.-Danville | OP-47-0002 | Montour | 8/28/96 | 4/16/99, 64 FR 18821 | (c)(138)(i)(B)(5). |
Handy and Harmon Tube Co.-Norristown | OP-46-0016 | Montgomery | 9/25/95 | 4/16/99, 64 FR 18821 | (c)(138)(i)(B)(6). |
Boeing Defense & Space Group-Helicopters Div | CP-23-0009 | Delaware | 9/3/97 | 12/15/00, 65 FR 78418 | See also 52.2064(a)(8). |
Delaware County Regional Authority's Western Regional Treatment Plant (DELCORA WRTP) | OP-23-0032 | Delaware | 3/12/97 5/16/97 | 12/15/00, 65 FR 78418 | (c)(143)(i)(B)(2). |
Delbar Products, Inc.-Perkasie | OP-09-0025 | Bucks | 2/1/96 | 12/15/00, 65 FR 78418 | (c)(143)(i)(B)(3). |
Department of Public Welfare (NSH)-Norristown | OP-46-0060 | Montgomery | 1/21/98 | 12/15/00, 65 FR 78418 | (c)(143)(i)(B)(4). |
Dopaco, Inc.-Downingtown | CP-15-0029 | Chester | 3/6/96 | 12/15/00, 65 FR 78418 | (c)(143)(i)(B)(5). |
Garlock, Inc. (Plastomer Products) | PA-09-0035 | Bucks | 3/12/97 | 12/15/00, 65 FR 78418 | (c)(143)(i)(B)(6). |
J. B. Slevin Company Inc.-Lansdowne | OP-23-0013 | Delaware | 9/3/96 | 12/15/00, 65 FR 78418 | (c)(143)(i)(B)(8). |
Laclede Steel Co.-Fairless Hills | OP-09-0023 | Bucks | 7/17/95 | 12/15/00, 65 FR 78418 | (c)(143)(i)(B)(9). |
LNP Engineering Plastics, Inc.-Thorndale | OP-15-0035 | Chester | 10/31/97 | 12/15/00, 65 FR 78418 | (c)(143)(i)(B)(10). |
Lukens Steel Co.-Coatesville | OP-15-0010 | Chester | 5/6/99 | 12/15/00, 65 FR 78418 | See also 52.2064(j)(1). |
Nabisco Biscuit Co | PLID (51-) 3201 | Philadelphia | 4/10/95 | 12/15/00, 65 FR 78418 | (c)(143)(i)(B)(12). |
PECO Energy Co.-Croydon Generating Station | OP-09-0016A | Bucks | 12/20/96 | 12/15/00, 65 FR 78418 | See also 52.2064(g)(8). |
PECO Energy Co.-Limerick Generating Station | OP-46-0038 | Montgomery | 7/25/95 | 12/15/00, 65 FR 78418 | (c)(143)(i)(B)(14). |
PECO Energy Co.-USX Fairless Works Powerhouse | OP-09-0066 | Bucks | 12/31/98, 4/6/99 | 12/15/00, 65 FR 78418 | See also 52.2064(a)(7). |
PECO Energy Co.-West Conshohocken Plant | OP-46-0045A | Montgomery | 12/4/97 | 12/15/00, 65 FR 78418 | (c)(143)(i)(B)(16). |
Pennsylvania Electric Co.-Front Street Station | 25-0041 | Erie | 2/25/99 | 12/15/00, 65 FR 78418 | (c)(143)(i)(B)(17). |
American Inks and Coatings Corp.-Valley Forge | OP-15-0026A | Chester | 1/10/97 | 12/15/00, 65 FR 78418 | (c)(143)(i)(B)(18). |
Avery Dennison Co. (Fasson Roll Division)-Quakertown | OP-09-0001A | Bucks | 10/2/97 | 12/15/00, 65 FR 78418 | (c)(143)(i)(B)(19). |
Cabot Performance Materials-Boyertown | OP-46-0037 | Montgomery | 4/13/99 | 12/15/00, 65 FR 78418 | See also 52.2064(b)(4). |
Cleveland Steel Container Corp.-Quakertown | OP-09-0022 | Bucks | 9/30/96 | 12/15/00, 65 FR 78418 | (c)(143)(i)(B)(21). |
CMS Gilbreth Packaging Systems-Bristol | OP-09-0036 | Bucks | 1/7/97 | 12/15/00, 65 FR 78418 | (c)(143)(i)(B)(22). |
CMS Gilbreth Packaging Systems-Bensalem | OP-09-0037 | Bucks | 4/10/97 | 12/15/00, 65 FR 78418 | (c)(143)(i)(B)(23). |
Congoleum Corp.-Marcus Hook | OP-23-0021 | Delaware | 12/31/98 | 12/15/00, 65 FR 78418 | (c)(143)(i)(B)(24). |
Epsilon Products Co.-Marcus Hook | OP-23-0012 | Delaware | 2/15/96 | 12/15/00, 65 FR 78418 | See also 52.2064(g)(3). |
Foamex International, Inc.-Eddystone | OP-23-0006A | Delaware | 3/30/99 | 12/15/00, 65 FR 78418 | (c)(143)(i)(B)(26). |
Forms, Inc., Spectra Graphics-Willow Grove | OP-46-0023 | Montgomery | 11/9/95 3/25/98 | 12/15/00, 65 FR78418 | (c)(143)(i)(B)(27). |
Global Packaging, Inc. (formerly BG Packaging)-Oaks | OP-46-0026 | Montgomery | 8/30/96 12/24/97 | 12/15/00, 65 FR78418 | (c)(143)(i)(B)(28). |
Lonza, Inc.-Conshohocken | OP-46-0025 | Montgomery | 4/22/97 6/16/98 | 12/15/00, 65 FR 78418 | (c)(143)(i)(B)(31). |
Markel Corporation | OP-46-0081 | Montgomery | 4/9/99 | 12/15/00, 65 FR 78418 | (c)(143)(i)(B)(32). |
McCorquodale Security Cards, Inc.-West Whiteland | OP-15-0037 | Chester | 9/3/96 | 12/15/00, 65 FR 78418 | (c)(143)(i)(B)(33). |
Mike-Rich, Inc. (MRI)-Newtown | OP-09-0021 | Bucks | 12/20/96 | 12/15/00, 65 FR 78418 | (c)(143)(i)(B)(34). |
Minnesota Mining and Manufacturing (3M) Company-Bristol | CP-09-0005 | Bucks | 8/8/96 | 12/15/00, 65 FR 78418 | (c)(143)(i)(B)(35). |
MM Biogas Power LLC (formerly O'Brien Environmental Energy, Inc.) | CP-46-0067 | Montgomery | 10/31/97 | 12/15/00, 65 FR 78418 | (c)(143)(i)(B)(36). |
Norwood Industries, Inc.-Frazer | OP-15-0014A | Chester | 12/20/96 12/2/99 | 12/15/00, 65 FR 78418 | (c)(143)(i)(B)(37). |
NVF Company | OP-15-0030 | Chester | 4/13/99 | 12/15/00, 65 FR 78418 | (c)(143)(i)(B)(38). |
Occidental Chemical Corp. (Vinyls Div.)-Pottstown | OP-46-0015 | Montgomery | 11/7/96 | 12/15/00, 65 FR 78418 | (c)(143)(i)(B)(39). |
Philadelphia Newspapers, Inc. (Schuylkill Printing Plant) | OP-46-0012 | Montgomery | 8/30/96 3/15/00 | 12/15/00, 65 FR 78418 | (c)(143)(i)(B)(40). |
The Proctor and Gamble Paper Products Co | OP-66-0001 | Wyoming | 4/4/97 | 12/15/00, 65 FR 78418 | (c)(143)(i)(B)(41). |
Quebecor Printing Atglen, Inc.-Atglen | OP-15-0002 | Chester | 12/10/96 | 12/15/00, 65 FR 78418 | (c)(143)(i)(B)(42). |
Sartomer Company, Inc | OP-15-0015 | Chester | 1/17/96 3/25/98 | 12/15/00, 65 FR 78418 | (c)(143)(i)(B)(43). |
Silberline Manufacturing Co | OP-54-0041 | Schuylkill | 4/19/99 | 12/15/00, 65 FR 78418 | See also 52.2064(g)(21). |
SmithKline Beecham Research Co. (formerly Sterling Winthrop, Inc.) | OP-46-0031 | Montgomery | 10/31/97 5/1/98 | 12/15/00, 65 FR 78418 | (c)(143)(i)(B)(45). |
Sullivan Graphics, Inc.-York | OP-67-2023 | York | 8/22/95 | 12/15/00, 65 FR 78418 | (c)(143)(i)(B)(46). |
Sun Company, Inc (R&M) (formerly Chevron USA)-Tinicum | OP-23-0010 | Delaware | 10/31/96 | 12/15/00, 65 FR 78418 | (c)(143)(i)(B)(47). |
Sun Company, Inc (R&M) (formerly Chevron USA)-Darby | OP-23-0011 | Delaware | 10/31/96 | 12/15/00, 65 FR 78418 | (c)(143)(i)(B)(48). |
Universal Packaging Corporation | OP-46-0156 | Montgomery | 4/8/99 | 12/15/00, 65 FR 78418 | (c)(143)(i)(B)(49). |
Zenith Products Corp.-Aston | OP-23-0008 | Delaware | 4/7/97 | 12/15/00, 65 FR 78418 | (c)(143)(i)(B)(50). |
Bellevue Cogeneration Plant | PLID (51-) 6513 | Philadelphia | 4/10/95 | 12/15/00, 65 FR 78418 | (c)(143)(i)(B)(52). |
MSC Pre-Finish Metals, Inc.-Morrisville | OP-09-0030 | Bucks | 11/7/96 3/31/98 | 12/15/00, 65 FR 78418 | (c)(143)(i)(B)(53). |
Advanced Glassfiber Yarns LLC (formerly Owens Corning)-Huntingdon | OP-31-02002 | Huntingdon | 4/13/99 | 08/6/01, 66 FR 40891 | (c)(149)(i)(B)(1). |
Armstrong World Industries, Inc.-Beech Creek | OP-18-0002 | Clinton | 7/6/95 | 08/6/01, 66 FR 40891 | (c)(149)(i)(B)(2). |
Bemis Company, Film Division | OP-40-0007A | Luzerne | 10/10/95 | 08/6/01, 66 FR 40891 | (c)(149)(i)(B)(3). |
Brentwood Industries, Inc | PA-06-1006A | Berks | 6/3/99 | 08/6/01, 66 FR 40891 | (c)(149)(i)(B)(4). |
Certainteed Corp.-Mountaintop | OP-40-0010 | Luzerne | 5/31/96 | 08/6/01, 66 FR 40891 | (c)(149)(i)(B)(5). |
CNG Transmission Corp.-Ardell Station | OP-24-120 | Elk | 9/30/95 | 08/6/01, 66 FR 40891 | (c)(149)(i)(B)(6). |
CNG Transmission Corp.-Finnefrock Station | PA-18-0003A | Clinton | 2/29/96 | 08/6/01, 66 FR 40891 | (c)(149)(i)(B)(7). |
Consol Pennsylvania Coal Company-Bailey Prep Plant | OP-30-000-072 | Greene | 3/23/1999 | 08/6/01, 66 FR 40891 | See also 52.2064(h)(1). |
Consolidated Rail Corp. (CONRAIL)-Hollidaysburg Car Shop | OP-07-2002 | Blair | 8/29/95 | 08/6/01, 66 FR 40891 | (c)(149)(i)(B)(9). |
Consolidated Rail Corp. (CONRAIL)-Juniata | OP-07-2003 | Blair | 8/29/95 | 8/6/01, 66 FR 40891 | (c)(149)(i)(B)(10). |
Containment Solutions, Inc. (formerly called Fluid Containment-Mt. Union) | OP-31-02005 | Huntingdon | 4/9/99 | 8/6/01, 66 FR 40891 | See also 52.2064(a)(12). |
Cooper Energy Systems, Grove City | OP-43-003 | Mercer | 7/25/96 | 8/6/01, 66 FR 40891 | (c)(149)(i)(B)(12). |
Cyprus Cumberland Resources Corp | OP-30-000-040 | Greene | 3/26/99 | 8/6/01, 66 FR 40891 | (c)(149)(i)(B)(13). |
Defense Distribution-Susquehanna | OP-67-02041 | York | 2/1/00 | 08/06/01, 66 FR 40891 | (c)(149)(i)(B)(14). |
EMI Company | OP-25-070 | Erie | 10/24/96 | 8/6/01, 66 FR 40891 | (c)(149)(i)(B)(15). |
Empire Sanitary Landfill, Inc | OP-35-0009 | Lackawanna | 10/17/96 | 8/6/01, 66 FR 40891 | (c)(149)(i)(B)(16). |
Equitrans, Inc.-Rogersville Station | (OP)30-000-109 | Greene | 7/10/95 | 8/6/01, 66 FR 40891 | (c)(149)(i)(B)(17). |
Equitrans, Inc.-Pratt Station | (OP)30-000-110 | Greene | 7/10/95 | 8/6/01, 66 FR 40891 | (c)(149)(i)(B)(18). |
Erie Coke Corporation-Erie | OP-25-029 | Erie | 6/27/95 | 8/6/01, 66 FR 40891 | (c)(149)(i)(B)(19). |
Fleetwood Folding Trailers, Inc.-Somerset | (OP)56-000-151 | Somerset | 2/28/96 | 8/6/01, 66 FR 40891 | (c)(149)(i)(B)(20). |
Gichner Systems Group, Inc | (OP)67-2033 | York | 8/5/97 | 8/6/01, 66 FR 40891 | (c)(149)(i)(B)(21). |
Offset Paperback Manufacturers, Inc.-Dallas | (OP)40-0008 | Luzerne | 4/16/99 | 08/06/01, 66 FR 40891 | (c)(149)(i)(B)(22). |
Overhead Door Corporation-Mifflin County | (OP)44-2011 | Mifflin | 6/4/97 | 8/6/01, 66 FR 40891 | (c)(149)(i)(B)(23). |
SANYO Audio Manufacturing (USA) Corp | (OP)44-2003 | Mifflin | 6/30/95 | 8/06/01, 66 FR 40891 | (c)(149)(i)(B)(24). |
Stroehmann Bakeries OP-Luzerne County | (OP)40-0014A | Luzerne | 5/30/95 | 8/6/01, 66 FR 40891 | (c)(149)(i)(B)(25). |
Merck and Co., Inc.-West Point Facility | OP-46-0005 | Montgomery | 1/13/97 6/23/00 | 4/18/01, 66 FR 19858 | See also 52.2064(d)(6). |
Amerada Hess Corp | PA-PLID (51-) 5009 | Philadelphia | 5/29/95 | 10/31/01, 66 FR 54936 | (c)(156)(i)(B)(1). |
Cartex Corporation | OP-09-0076 | Bucks | 4/9/99 | 10/31/01, 66 FR 54936 | (c)(156)(i)(B)(3). |
Hatfield Quality Meats, Inc.-Hatfield | OP-46-0013A | Montgomery | 1/9/97 10/1/98 | 10/31/01, 66 FR 54936 | (c)(156)(i)(B)(6). |
J. L. Clark, Inc | OP-36-02009 | Lancaster | 4/16/99 | 10/31/01, 66 FR 54936 | (c)(156)(i)(B)(7). |
Johnson Matthey, Inc.-Wayne | OP-15-0027 | Chester | 8/3/98 4/15/99 | 10/31/01, 66 FR 54936 | (c)(156)(i)(B)(8). |
PPG Industries, Inc. (BASF) | OP-23-0005 | Delaware | 6/4/97 | 10/31/01, 66 FR 54936 | (c)(156)(i)(B)(13). |
SmithKline Beecham Pharmaceuticals | OP-46-0035 | Montgomery | 3/27/97 10/20/98 | 10/31/01, 66 FR 54936 | (c)(156)(i)(B)(14). |
Teva Pharmaceuticals USA (formerly Lemmon company) | OP-09-0010 | Bucks | 4/9/99 | 10/31/01, 66 FR 54936 | (c)(156)(i)(B)(15). |
The Philadelphian Condominium Building | PA-PLID (51-) 6512 | Philadelphia | 5/29/95 | 10/31/01, 66 FR 54936 | (c)(156)(i)(B)(16). |
Warner Company | OP-15-0001 | Chester | 7/17/95 | 10/31/01, 66 FR 54936 | (c)(156)(i)(B)(17). |
Webcraft Technologies, Inc | OP-09-0009 | Bucks | 4/18/96 10/15/98 | 10/31/01, 66 FR 54936 | (c)(156)(i)(B)(18). |
Latrobe Steel Company-Latrobe | OP-65-000-016 | Westmoreland | 12/22/1995 | 10/16/01, 66 FR 52517 | See also 52.2064(h)(2). |
Allegheny Ludlum Corporation-Brackenridge | CO-260 | Allegheny | 12/19/96 | 10/18/01, 66 FR 52851 | See also 52.2064(j)(2). |
Kosmos Cement Co.-Neville Island Facility | EO-208 | Allegheny | 12/19/96 | 10/18/01, 66 FR 52857 | (c)(160)(i)(B)(1). |
Armstrong Cement and Supply Company-Cabot | OP-10-028 | Butler | 3/31/99 | 10/18/01, 66 FR 52857 | (c)(160)(i)(B)(2). |
Duquesne Light Company-Cheswick Power Station | CO-217 | Allegheny | 3/8/96 | 10/18/01, 66 FR 52867 | (c)(161)(i)(B)(1). |
Duquesne Light Company-Elrama Plant | (PA)63-000-014 | Washington | 12/29/94 | 10/18/01, 66 FR 52867 | (c)(161)(i)(B)(2). |
Pennsylvania Electric Co. (PENELEC)-Keystone Generating Station | (PA-)03-000-027 | Armstrong | 12/29/94 | 10/18/01, 66 FR 52867 | (c)(161)(i)(B)(3). |
IDL, Incorporated | CO-225 | Allegheny | 7/18/96 | 10/18/01, 66 FR 52862 | (c)(162)(i)(B)(1). |
Oakmont Pharmaceutical, Inc | CO-252 | Allegheny | 12/19/96 | 10/18/01, 66 FR 52862 | (c)(162)(i)(B)(2). |
U.S. Air, Inc | CO-255 | Allegheny | 1/14/97 | 10/18/01, 66 FR 52862 | (c)(162)(i)(B)(3). |
Lukens Steel Corporation-Houston Plant | (OP)63-000-080 | Washington | 2/22/99 | 10/16/01, 66 FR 52522 | (c)(163)(i)(B)(1). |
Allegheny Ludlum Steel Corporation-West Leechburg Plant | (OP)65-000-183 | Westmoreland | 3/23/99 | 10/16/01, 66 FR 52522 | (c)(163)(i)(B)(2). |
(Allegheny Ludlum Corporation) Jessop Steel Company-Washington Plant | (OP)63-000-027 | Washington | 3/26/1999 | 10/16/01, 66 FR 52522 | See also 52.2064(h)(3). |
Koppel Steel Corporation-Koppel Plant | (OP)04-000-059 | Beaver | 3/23/2001 | 10/16/01, 66 FR 52522 | See also 52.2064(h)(4). |
Consolidated Natural Gas (CNG) Transmission Corp.-Beaver Station | OP-04-000-490 | Beaver | 6/23/95 | 10/12/01, 66 FR 52055 | (c)(164)(i)(B)(1). |
Consolidated Natural Gas (CNG) Transmission Corp.-Oakford Compressor Station | OP-65-000-837 | Westmoreland | 10/13/95 | 10/12/01, 66 FR 52055 | (c)(164)(i)(B)(2). |
Consolidated Natural Gas (CNG) Transmission Corp.-South Oakford Station | (OP)65-000-840 | Westmoreland | 10/13/95 | 10/12/01, 66 FR 52055 | (c)(164)(i)(B)(3). |
Consolidated Natural Gas (CNG) Transmission Corp.-Tonkin Compressor Station | (OP)65-000-634 | Westmoreland | 10/13/95 | 10/12/01, 66 FR 52055 | (c)(164)(i)(B)(4). |
Consolidated Natural Gas (CNG) Transmission Corp.-Jeannette Station | (OP)65-000-852 | Westmoreland | 10/13/95 | 10/12/01, 66 FR 52055 | (c)(164)(i)(B)(5). |
Carnegie Natural Gas Co.-Creighton Station | EO-213 | Allegheny | 5/14/96 | 10/12/01, 66 FR 52055 | (c)(164)(i)(B)(6). |
Texas Eastern Transmission Corp.-Uniontown Station | (OP)26-000-413 | Fayette | 12/20/96 | 10/12/01, 66 FR 52055 | (c)(164)(i)(B)(7). |
Consolidated Natural Gas (CNG) Transmission Corp.-South Bend Station | OP-03-000-180 | Armstrong | 12/2/98 | 10/12/01, 66 FR 52055 | (c)(164)(i)(B)(8). |
Pruett Schaffer Chemical Company | CO-266 | Allegheny | 9/2/98 | 10/12/01, 66 FR 52050 | (c)(165)(i)(B)(1). |
PPG Industries, Inc.-Springdale | CO-254 | Allegheny | 12/19/96 | 10/12/01, 66 FR 52050 | See also 52.2064(l)(1). |
Reichhold Chemicals, Inc.-Bridgeville | CO-218 | Allegheny | 12/19/96 | 10/12/01, 66 FR 52050 | (c)(165)(i)(B)(3) [NOX RACT]. |
Reichhold Chemicals, Inc.-Bridgeville | CO-219 | Allegheny | 2/21/96 | 10/12/01, 66 FR 52050 | (c)(165)(i)(B)(4) [VOC RACT]. |
Valspar Corporation-Pittsburgh | CO-209 | Allegheny | 3/8/96 | 10/12/01, 66 FR 52050 | (c)(165)(i)(B)(5). |
Ashland Chemical Corporation | CO-227 | Allegheny | 12/30/96 | 10/16/01, 66 FR 52506 | (c)(166)(i)(B)(1). |
Hercules, Inc.-West Elizabeth | EO-216 | Allegheny | 3/8/96 | 10/16/01, 66 FR 52506 | See also 52.2064(e)(2). |
Hercules, Inc.-West Elizabeth | CO-257 | Allegheny | 1/14/97 11/1/99 | 10/16/01, 66 FR 52506 | See also 52.2064(e)(2). |
Neville Chemical Company | CO-230 | Allegheny | 12/13/96 | 10/16/01, 66 FR 52506 | See also 52.2064(e)(4). |
Anchor Glass Container Corp.-Plant 5 | (PA)26-000-119 | Fayette | 12/20/96 | 10/16/01, 66 FR 52527 | (c)(167)(i)(B)(1). |
Anchor Hocking Specialty Glass Co.-Phoenix Glass Plant | (OP)04-000-084 | Beaver | 10/13/95 | 10/16/01, 66 FR 52527 | (c)(167)(i)(B)(2). |
Corning Consumer Products Co.-Charleroi Plant | (PA)63-000-110 | Washington | 1/4/96 | 10/16/01, 66 FR 52527 | (c)(167)(i)(B)(3). |
General Electric Company | CO-251 | Allegheny | 12/19/96 | 10/16/01, 66 FR 52527 | (c)(167)(i)(B)(4). |
Glenshaw Glass Company, Inc | CO-270 | Allegheny | 3/10/00 | 10/16/01, 66 FR 52527 | (c)(167)(i)(B)(5). |
Guardian Industries Corp | CO-242 | Allegheny | 8/27/96 | 10/16/01, 66 FR 52527 | (c)(167)(i)(B)(6). |
Allegheny County Sanitary Authority | CO-222 | Allegheny | 5/14/96 | 10/16/01, 66 FR 52527 | (c)(167)(i)(B)(7). |
Browning-Ferris Industries | CO-231A | Allegheny | 4/28/97 | 10/16/01, 66 FR 52527 | (c)(167)(i)(B)(8). |
Chambers Development Company-Monroeville Borough Landfill | CO-253 | Allegheny | 12/30/96 | 10/16/01, 66 FR 52527 | (c)(167)(i)(B)(9). |
Kelly Run Sanitation, Forward Township Landfill | CO-236 | Allegheny | 1/23/97 | 10/16/01, 66 FR 52527 | (c)(167)(i)(B)(10). |
Stroehmann Bakeries-Montgomery County (Norristown) | PA-46-0003 | Montgomery | 5/4/95 | 10/31/01, 66 FR 54942 | (c)(169)(i)(B)(1). |
Schlosser Steel, Inc | OP-46-0051 | Montgomery | 2/1/96 | 10/31/01, 66 FR 54942 | (c)(169)(i)(B)(2). |
Perkasie Industries Corp.-Perkasie | OP-09-0011 | Bucks | 8/14/96 | 10/31/01, 66 FR 54942 | (c)(169)(i)(B)(3). |
Quaker Chemical Corporation-Conshohocken | OP-46-0071 | Montgomery | 9/26/96 | 10/31/01, 66 FR 54942 | (c)(169)(i)(B)(4). |
Worthington Steel Company | OP-15-0016 | Chester | 7/23/96 | 10/31/01, 66 FR 54942 | (c)(169)(i)(B)(5). |
Transcontinental Gas Pipeline Corp.-Sta. 200, Frazer | PA-15-0017 | Chester | 6/5/95 | 10/31/01, 66 FR 54942 | (c)(169)(i)(B)(6). |
Rohm and Haas Company, Bucks County Plant | OP-09-0015 | Bucks | 4/20/99 | 10/31/01, 66 FR 54942 | (c)(169)(i)(B)(7). |
SEPTA-Berridge/Courtland Maintenance Shop | PA-51-4172 | Philadelphia | 7/27/99 | 10/31/01, 66 FR 54942 | (c)(169)(i)(B)(8). |
Southwest Water Pollution Control Plant/Biosolids Recycling Center | PA-51-9515 | Philadelphia | 7/27/99 | 10/31/01, 66 FR 54942 | (c)(169)(i)(B)(9). |
Smith-Edwards-Dunlap Company | PA-(51-)2255 | Philadelphia | 7/14/00 | 10/31/01, 66 FR 54942 | (c)(169)(i)(B)(13). |
Armstrong World Industries, Inc.-Beaver Falls Plant | (OP)04-000-108 | Beaver | 5/29/96 | 10/17/01, 66 FR 52695 | (c)(170)(i)(B)(1). |
Bacharach, Inc | CO-263 | Allegheny | 10/10/97 | 10/17/01, 66 FR 52695 | (c)(170)(i)(B)(2). |
Bakerstown Container Corporation | CO-221 | Allegheny | 5/14/96 | 10/17/01, 66 FR 52695 | (c)(170)(i)(B)(3). |
Chestnut Ridge Foam, Inc.-Latrobe | (OP)65-000-181 | Westmoreland | 12/29/95 | 10/17/01, 66 FR 52695 | See also 52.2064(i)(10). |
Flexsys America LP, Monongahela Plant | (OP)63-000-015 | Washington | 3/23/01 | 10/17/01, 66 FR 52695 | (c)(170)(i)(B)(5). |
Haskell of Pittsburgh, Inc | CO-224 | Allegheny | 12/19/96 | 10/17/01, 66 FR 52695 | (c)(170)(i)(B)(6). |
Three Rivers Aluminum Company (TRACO) | OP-10-267 | Butler | 3/1/2001 | 10/17/01, 66 FR 52695 | See also 52.2064(h)(5). |
Tuscarora Plastics, Inc | (OP)04-000-497 | Beaver | 4/3/96 | 10/17/01, 66 FR 52695 | (c)(170)(i)(B)(8). |
Witco Corporation | CO-210 | Allegheny | 5/14/96 | 10/17/01, 66 FR 52695 | (c)(170)(i)(B)(9). |
GenCorp (Plastic Films Division)-Jeannette Plant | (OP)65-000-207 | Westmoreland | 1/4/1996 | 10/15/01, 66 FR 52322 | See also 52.2064(h)(6). |
CENTRIA-Ambridge Coil Coating Operations Plant | (OP)04-000-043 | Beaver | 5/17/99 | 10/15/01, 66 FR 52322 | (c)(171)(i)(D). |
J & L Structural, Inc.-Aliquippa | OP-04-000-467 | Beaver | 6/23/95 | 10/16/01, 66 FR 52511 | (c)(172)(i)(B)(1). |
Universal Stainless & Alloy Products, Inc | CO-241 | Allegheny | 12/19/96 | 10/16/01, 66 FR 52511 | See also 52.2064(e)(6). |
Shenango, Inc | CO-233 | Allegheny | 12/30/96 | 10/16/01, 66 FR 52511 | (c)(172)(i)(B)(3). |
LTV Steel Company | CO-259 | Allegheny | 12/30/96 | 10/16/01, 66 FR 52511 | (c)(172)(i)(B)(4). |
U.S. Steel (USX Corporation.)-Clairton Works | CO-234 | Allegheny | 12/30/96 | 10/16/01, 66 FR 52511 | See also 52.2064(e)(7). |
USX Corporation-Edgar Thomson Works | CO-235 | Allegheny | 12/30/96 | 10/16/01, 66 FR 52511 | See also 52.2064(e)(8). |
USX, Inc.-Irvin Works | CO-258 | Allegheny | 12/30/96 | 10/16/01, 66 FR 52511 | See also 52.2064(e)(9). |
Wheeling-Pittsburgh Steel Corporation-Allenport Plant | (OP)63-000-066 | Washington | 2/8/99 | 10/16/01, 66 FR 52511 | (c)(172)(i)(B)(8). |
Koppers-Monessen Coke Plant | (OP)65-000-853 | Westmoreland | 3/20/98 | 10/16/01, 66 FR 52511 | (c)(172)(i)(B)(9). |
J & L Specialty Steel, Inc.-Midland Facility | (OP)04-000-013 | Beaver | 3/23/01 | 10/16/01, 66 FR 52511 | See also 52.2064(i)(2). |
Washington Steel Corp.-Washington Plant | (OP)63-000-023 | Washington | 9/12/96 | 10/16/01, 66 FR 52511 | (c)(172)(i)(B)(11). |
Equitrans, Inc.-Hartson | (OP)63-000-642 | Washington | 7/10/95 | 10/17/01, 66 FR 52705 | (c)(173)(i)(B)(1). |
Witco Corp.-Petrolia Facility | PA-10-037 | Butler | 6/27/95 | 10/17/01, 66 FR 52705 | See also 52.2064(i)(17). |
Ranbar Electrical Materials Inc. (formerly Westinghouse Electric Co. EMD)-Manor | (OP)65-000-042 | Westmoreland | 2/22/99 | 10/17/01, 66 FR 52705 | (c)(173)(i)(B)(3). |
Nova Chemicals, Inc. (formerly Arco Chemical Co.-Beaver Valley) | (OP)04-000-033 | Beaver | 4/16/99 1/24/01 | 10/17/01, 66 FR 52705 | See also 52.2064(g)(19). |
BASF Corporation-Monaca Site | (OP)04-000-306 | Beaver | 3/23/01 | 10/17/01, 66 FR 52705 | (c)(173)(i)(B)(5). |
Cardone Industries-Rising Sun Ave | PA(51-) PLID 3887 | Philadelphia | 5/29/95 | 10/30/01, 66 FR 54710 | (c)(174)(i)(B)(1). |
Cardone Industries-Chew St | PA(51-) PLID 2237 | Philadelphia | 5/29/95 | 10/30/01, 66 FR 54710 | (c)(174)(i)(B)(2). |
Wheelabrator Falls, Inc | OP-09-0013 | Bucks | 1/11/96 5/17/96 | 10/30/01, 66 FR 54710 | (c)(174)(i)(B)(4). |
US Steel Group/USX Corporation-Fairless Works | OP-09-0006 | Bucks | 4/8/99 | 10/30/01, 66 FR 54710 | (c)(174)(i)(B)(5). |
Brown Printing Company | OP-46-0018A | Montgomery | 5/17/00 | 10/30/01, 66 FR 54710 | (c)(174)(i)(B)(6). |
Sun Chemical-General Printing Ink Division | PA(51-) 2052 | Philadelphia | 7/14/00 | 10/30/01, 66 FR 54710 | (c)(174)(i)(B)(7). |
Armco, Inc. Butler Operations Main Plant | PA-10-001M | Butler | 2/23/96 | 10/15/01, 66 FR 52338 | See also 52.2064(i)(1). |
Armco, Inc. Butler Operations Stainless Plant | PA-10-001S | Butler | 2/23/96 | 10/15/01, 66 FR 52338 | See also 52.2064(i)(1). |
Pennsylvania Power Co.-Bruce Mansfield Plant | (PA)04-000-235 | Beaver | 12/29/94 | 10/15/01, 66 FR 52333 | (c)(176)(i)(B)(1). |
West Penn Power Co.-Mitchell Station | (PA)63-000-016 | Washington | 6/12/95 | 10/15/01, 66 FR 52333 | (c)(176)(i)(B)(2). |
Carnegie Natural Gas Company-Fisher Station | (OP)03-000-182 | Armstrong | 12/2/98 | 10/15/01, 66 FR 52333 | (c)(176)(i)(B)(3). |
Apollo Gas Company-Shoemaker Station | (OP)03-000-183 | Armstrong | 9/12/96 | 10/15/01, 66 FR 52333 | (c)(176)(i)(B)(4). |
Texas Eastern Transmission Corp.-Delmont Station | (OP)65-000-839 | Westmoreland | 1/9/97 | 10/15/01, 66 FR 52333 | (c)(176)(i)(B)(5). |
The Peoples Natural Gas Co.-Valley Station | (OP)03-000-125 | Armstrong | 10/31/94 | 10/15/01, 66 FR 52333 | (c)(176)(i)(B)(6). |
The Peoples Natural Gas Co.-Girty Compressor Station | (PA)03-000-076 | Armstrong | 10/27/95 | 10/15/01, 66 FR 52333 | (c)(176)(i)(B)(7). |
AES Beaver Valley Partners-Monaca Plant | (OP)04-000-446 | Beaver | 3/23/01 | 10/15/01, 66 FR 52333 | (c)(176)(i)(B)(8). |
Penreco-Karns City | OP-10-0027 | Butler | 5/31/95 | 10/12/01, 66 FR 52044 | See also 52.2064(g)(5). |
Ashland Petroleum Company | CO-256 | Allegheny | 12/19/96 | 10/12/01, 66 FR 52044 | (c)(177)(i)(B)(2). |
Bellefield Boiler Plant-Pittsburgh | EO-248 | Allegheny | 12/19/96 | 10/12/01, 66 FR 52044 | See also 52.2064(e)(1). |
Gulf Oil, L.P | CO-250 | Allegheny | 12/19/96 | 10/12/01, 66 FR 52044 | (c)(177)(i)(B)(4). |
PA Dept. of Corrections | EO-244 | Allegheny | 1/23/97 | 10/12/01, 66 FR 52044 | (c)(177)(i)(B)(5). |
Pittsburgh Thermal Limited Partnership | CO-220 | Allegheny | 3/4/96 | 10/12/01, 66 FR 52044 | (c)(177)(i)(B)(6). |
BP Exploration & Oil, Inc.-Greensburg Terminal | (OP)65-000-378 | Westmoreland | 3/23/01 | 10/12/01, 66 FR 52044 | (c)(177)(i)(B)(7). |
Pittsburgh Allegheny County Thermal, Ltd | CO-265 | Allegheny | 11/9/98 | 10/12/01, 66 FR 52044 | See also 52.2064(e)(5). |
Aristech Chemical Corporation | CO-232 | Allegheny | 12/30/96 | 10/17/01, 66 FR 52700 | (c)(178)(i)(B)(1). |
Heinz U.S.A.-Pittsburgh | EO-211 | Allegheny | 3/8/96 | 10/17/01, 66 FR 52700 | (c)(178)(i)(B)(2). |
Heinz U.S.A.-Pittsburgh | CO-247 | Allegheny | 10/24/96 | 10/17/01, 66 FR 52700 | (c)(178)(i)(B)(2). |
Koppers Industries, Inc. (Aristech Chem. Corp) | CO-223 | Allegheny | 8/27/96 | 10/17/01, 66 FR 52700 | (c)(178)(i)(B)(3). |
Nabisco Biscuit Co | CO-246 | Allegheny | 12/19/96 | 10/17/01, 66 FR 52700 | (c)(178)(i)(B)(4). |
Pressure Chemical Co | CO-261 | Allegheny | 6/11/97 | 10/17/01, 66 FR 52700 | (c)(178)(i)(B)(5). |
General Carbide Corp | (OP)65-000-622 | Westmoreland | 12/29/95 | 10/17/01, 66 FR 52700 | See also 52.2064(i)(12). |
Fansteel Hydro Carbide | (OP)65-000-860 | Westmoreland | 12/12/97 | 10/17/01, 66 FR 52700 | See also 52.2064(k)(1). |
Carbidie Corporation | (OP)65-000-720 | Westmoreland | 7/31/98 | 10/17/01, 66 FR 52700 | (c)(178)(i)(B)(8). |
Dyno Nobel Inc-Donora | (OP)63-000-070 | Washington | 3/31/99 | 10/17/01, 66 FR 52700 | (c)(178)(i)(B)(9). |
Newcomer Products, Inc | (OP)65-000-851 | Westmoreland | 8/7/97 | 10/17/01, 66 FR 52700 | (c)(178)(i)(B)(10). |
PECO Energy Company-Cromby Generating Station | OP-15-0019 | Chester | 4/28/95 | 10/30/01, 66 FR 54699 | (c)(179)(i)(B)(1). |
Waste Resource Energy, Inc. (Operator); Shawmut Bank, Conn. National Assoc. (Owner); Delaware County Resource Recovery Facility | OP-23-0004 | Delaware | 11/16/95 | 10/30/01, 66 FR 54699 | (c)(179)(i)(B)(2). |
G-Seven, Ltd | OP-46-0078 | Montgomery | 4/20/99 | 10/30/01, 66 FR 54699 | (c)(179)(i)(B)(3). |
Leonard Kunkin Associates | OP-09-0073 | Bucks | 6/25/01 | 10/30/01, 66 FR 54699 | (c)(179)(i)(B)(4). |
Kimberly-Clark Corporation | OP-23-0014A | Delaware | 6/24/98 8/1/01 | 10/30/01, 66 FR 54699 | (c)(179)(i)(B)(5). |
Sunoco, Inc. (R&M); Marcus Hook Plant | CP-23-0001 | Delaware | 6/8/95, 8/2/01 | 10/30/01, 66 FR 54699 | See also 52.2064(b)(3). |
Waste Management Disposal Services of Pennsylvania, Inc. (GROWS Landfill) | OP-09-0007 | Bucks | 12/19/97 7/17/01 | 10/30/01, 66 FR 54699 | (c)(179)(i)(B)(7). |
Koppel Steel Corporation-Ambridge Plant | OP-04-000-227 | Beaver | 10/12/2000 | 10/15/01, 66 FR 52317 | See also 52.2064(h)(7). |
General Motors Corporation | CO-243 | Allegheny | 8/27/96 | 10/15/01, 66 FR 52327 | (c)(181)(i)(B)(1). |
Oakmont Steel, Inc | CO-226 | Allegheny | 5/14/96 | 10/15/01, 66 FR 52327 | (c)(181)(i)(B)(2). |
The Peoples Natural Gas Co | CO-240 | Allegheny | 8/27/96 | 10/15/01, 66 FR 52327 | (c)(181)(i)(B)(3). |
U.S. Bureau of Mines | EO-215 | Allegheny | 3/8/96 | 10/15/01, 66 FR 52327 | (c)(181)(i)(B)(4). |
Waste Management Disposal Services of Pennsylvania (Pottstown Landfill) | OP-46-0033 | Montgomery | 4/20/99 | 10/30/01, 66 FR 54704 | (c)(182)(i)(B)(1). |
FPL Energy MH50, LP (Sunoco, Inc. (R&M)) | PA-23-0084 | Delaware | 7/26/99 | 10/30/01, 66 FR 54704 | (c)(182)(i)(B)(2). |
Moyer Packing Company | OP-46-0001 | Montgomery | 3/15/96 | 10/31/01, 66 FR 54947 | (c)(184)(i)(B)(3). |
Tullytown Resource Recovery Facility (Waste Management of Pa., Inc.) | OP-09-0024 | Bucks | 7/14/97 | 10/31/01, 66 FR 54947 | (c)(184)(i)(B)(4). |
SPS Technologies, Inc | OP-46-0032 | Montgomery | 10/30/97 | 10/31/01, 66 FR 54947 | (c)(184)(i)(B)(5). |
PECO Energy Company | OP-09-0077 | Bucks | 12/19/97 | 10/31/01, 66 FR 54947 | (c)(184)(i)(B)(6). |
Exelon Generation Company-Delaware Generating Station | PA-51-4901 | Philadelphia | 7/11/01 | 10/31/01, 66 FR 54947 | (c)(184)(i)(B)(8). |
Exelon Generation Company-Schuylkill Generating Station | PA-51-4904 | Philadelphia | 7/11/01 | 10/31/01, 66 FR 54947 | (c)(184)(i)(B)(9). |
International Business Systems, Inc | OP-46-0049 | Montgomery | 10/29/98 | 10/30/01, 66 FR 54691 | (c)(185)(i)(B)(1). |
Bethlehem Lukens Plate | P-46-0011 | Montgomery | 12/11/98 | 10/30/01, 66 FR 54691 | See also 52.2064(g)(2). |
Montenay Montgomery Limited Partnership | OP-46-0010A | Montgomery | 4/20/99 6/20/00 | 10/30/01, 66 FR 54691 | (c)(185)(i)(B)(3). |
Northeast Foods, Inc. (Bake Rite Rolls) | OP-09-0014 | Bucks | 4/9/99 | 10/30/01, 66 FR 54691 | (c)(185)(i)(B)(4). |
NortheastWater Pollution Control Plant | PA-51-9513 | Philadelphia | 7/27/99 | 10/30/01, 66 FR54691 | (c)(185)(i)(B)(13). |
Newman and Company | PLID (51-) 3489 | Philadelphia | 6/11/97 | 10/30/01, 66 FR 54691 | (c)(185)(i)(B)(14). |
Allegheny Ludlum Steel Corporation | (OP-)65-000-137 | Westmoreland | 5/17/1999 | 10/19/01, 66 FR 53090 | See also 52.2064(h)(8). |
INDSPEC Chemical Corporation | PA10-021 | Butler | 10/19/98 | 10/19/01, 66 FR 53090 | (c)(186)(i)(B)(2). |
Stoney Creek Technologies, L.L.C | PA-23-0002 | Delaware | 2/24/99 | 11/5/01, 66 FR 55880 | (c)(187)(i)(B)(1). |
Superpac, Inc | OP-09-0003 | Bucks | 3/25/99 | 11/5/01, 66 FR 55880 | (c)(187)(i)(B)(2). |
American Bank Note Company | OP-46-0075 | Montgomery | 5/19/97 8/10/98 | 11/5/01, 66 FR 55880 | (c)(187)(i)(B)(4). |
Atlas Roofing Corporation-Quakertown | OP-09-0039 | Bucks | 3/10/99 | 11/5/01, 66 FR 55880 | (c)(187)(i)(B)(5). |
Beckett Corporation | OP-15-0040 | Chester | 7/8/97 | 11/5/01, 66 FR 55880 | (c)(187)(i)(B)(6). |
Klearfold, Inc | OP-09-0012 | Bucks | 4/15/99 | 11/5/01, 66 FR 55880 | (c)(187)(i)(B)(7). |
National Label Company | OP-46-0040 | Montgomery | 7/28/97 | 11/5/01, 66 FR 55880 | (c)(187)(i)(B)(8). |
Bethlehem Steel Corporation | OP-22-02012 | Dauphin | 4/9/99 | 5/23/02, 67 FR 36108 | See also 52.2064(i)(8). |
Hershey Chocolate USA | OP-22-2004A | Dauphin | 1/24/00 | 6/26/02, 67 FR 43002 | (c)(194)(i)(B)(1). |
Pennsylvania Power Company New Castle Plant | OP-37-0023 | Lawrence | 4/8/99 | 6/26/02, 67 FR 43002 | (c)(194)(i)(B)(2). |
Lafarge Corporation | OP-39-0011B | Lehigh | 5/19/97 | 4/1/03, 68 FR 15661 | (c)(196)(i)(B)(1). |
The Peoples Natural Gas Company | (OP-)11-000-356 | Cambria | 11/23/94 | 4/1/03, 68 FR 15661 | (c)(196)(i)(B)(2). |
Horsehead Resource Development Company, Inc | OP-13-0001 | Carbon | 5/16/95 | 4/1/03, 68 FR 15661 | See also 52.2064(i)(6). |
Williams Generation Company-Hazleton | OP-40-0031A | Luzerne | 3/10/00 | 4/1/03, 68 FR 15661 | See also 52.2064(c)(6). |
Pennsylvania Power and Light Company, Holtwood Steam Electric Station | PA-36-2016 | Lancaster | 5/25/95 | 4/1/03, 68 FR 15661 | (c)(196)(i)(B)(5). |
General Electric Transportation Systems | OP-25-025A | Erie | 8/26/02 | 4/7/03, 68 FR 16724 | See also 52.2064(c)(4). |
Bethlehem Structural Products Corporation | OP-48-0013 | Northampton | 10/24/96 | 5/2/03, 68 FR 23404 | (c)(200)(i)(B)(1). |
International Paper Company, Erie Mill | PA-25-028 | Erie | 12/21/94 | 5/2/03, 68 FR 23404 | (c)(200)(i)(B)(2). |
National Fuel Gas Supply-Heath Compressor Station | PA-33-144A | Jefferson | 10/5/98 | 5/2/03, 68 FR 23404 | (c)(200)(i)(B)(3). |
PPG Industries, Inc | OP-20-145 | Crawford | 5/31/95 | 3/24/03, 68 FR14154 | (c)(201)(i)(B). |
Dominion Trans., Inc.-Finnefrock Station | Title V-18-00005 | Clinton | 2/16/00 | 5/7/03, 68 FR 24365 | (c)(202)(i)(B)(1). |
Textron Lycoming-Oliver Street Plant | Title V-41-00005 | Lycoming | 1/12/01 | 5/7/03, 68 FR 24365 | (c)(202)(i)(B)(2). |
Lafayette College, Easton Campus | OP-48-0034 | Northampton | 8/18/97 | 5/20/03, 68 FR 27471 | (c)(205)(i)(B). |
Keystone Carbon Company | OP-24-016 | Elk | 5/15/95 | 10/17/03, 68 FR 59741 | (c)(207)(i)(B)(1). |
Mack Trucks, Inc | OP-39-0004 | Northampton | 5/31/1995 | 10/17/03, 68 FR 59741 | See also 52.2064(h)(9). |
Owens-Brockway Glass Container, Inc | OP-33-033 | Jefferson | 3/27/95 | 10/17/03, 68 FR 59741 | (c)(207)(i)(B)(1). |
Resilite Sport Products, Inc | OP-49-0003 | Northumberland | 12/3/96 | 10/17/03, 68 FR 59741 | See also 52.2064(a)(10). |
Westfield Tanning Company | OP-59-0008 | Tioga | 11/27/96 | 10/17/03, 68 FR 59741 | (c)(207)(i)(B)(1). |
Tarkett, Incorporated | OP-39-0002 | Lehigh | 5/31/95 | 8/6/03, 68 FR 46484 | (c)(208)(i)(B)(1). |
Hacros Pigments, Inc. | OP-48-0018 | Northampton | 7/31/96 | 8/6/03, 68 FR 46484 | (c)(208)(i)(B)(2). |
GPU Generation Corp., Homer City Station | (OP-)32-000-055 | Indiana | 10/29/98 | 10/15/03, 68 FR 59321 | (c)(212)(i)(B)(1). |
GPU Generation Corp., Seward Station | (OP-)32-000-040 | Indiana | 4/30/98 | 10/15/03, 68 FR 59321 | (c)(212)(i)(B)(2). |
Ebensburg Power Company, Ebensburg Cogeneration Plant | (OP-)11-000-318 | Cambria | 3/28/01 | 10/15/03, 68 FR 59321 | (c)(212)(i)(B)(3). |
Sithe Pennsylvania Holdings, LLC, Warren Station | OP-62-012B | Warren | 1/20/00 | 10/15/03, 68 FR 59321 | (c)(212)(i)(B)(4). |
Pennsylvania Power & Light Company, Sunbury SES | OP-55-0001A | Snyder | 7/7/97 | 10/15/03, 68 FR 59321 | (c)(212)(i)(B)(5). |
Lakeview Landfill | OP-25-920 | Erie | 5/29/97 | 10/15/03, 68 FR 59321 | (c)(212)(i)(B)(6). |
National Fuel Gas Supply Corp.-Roystone Compressor Station | OP-62-141F | Warren | 4/1/03 | 10/27/04, 69 FR 62583 | See also 52.2064(d)(2). |
Crompton Corporation, Fairview Township | OP-10-037 | Butler | 6/4/03 | 5/25/04, 69 FR 29444 | See also 52.2064(i)(17). |
Andritz, Inc | 41-00010C | Lycoming | 4/30/03 | 10/15/03, 68 FR 59318 | (c)(214)(i)(B)(1). |
Brodart Company | 18-0007A | Clinton | 4/8/03 | 10/15/03, 68 FR 59318 | (c)(214)(i)(B)(2). |
Erie Sewer Authority | OP-25-179 | Erie | 6/5/03 | 10/15/03, 68 FR 59318 | (c)(214)(i)(B)(3). |
Hercules Cement Company | OP-48-0005A | Northampton | 4/16/99 | 11/24/03, 68 FR 65846 | (c)(217)(i)(B). |
Tennessee Gas Pipeline Company-Howe Township | OP-27-015 | Forest | 7/27/2000 | 3/30/05, 70 FR 16118 | See also 52.2064(h)(10). |
Tennessee Gas Pipeline Company, Station 219 | OP-43-0272 | Mercer | 4/7/99 | 10/27/04, 69 FR 62585 | See also 52.2064(i)(20). |
Information Display Technology, Inc | 32-000-085 | Indiana | 1/11/96 | 03/29/05, 70 FR 15774 | (d)(1)(h). |
Bedford Materials Co., Inc | 05-02005 | Bedford | 4/15/99 | 03/29/05, 70 FR 15774 | (d)(1)(h). |
Bollman Hat Company | 36-2031 | Lancaster | 7/3/95 | 03/29/05, 70 FR 15774 | (d)(1)(h). |
Armco Inc | OP-43-040 | Mercer | 9/30/99 | 03/29/05, 70 FR 15774 | (d)(1)(h). |
Specialty Tires of America, Inc | 32-000-065 | Indiana | 1/6/00 | 3/29/05, 70 FR 15774 | See also 52.2064(i)(18). |
Truck Accessories Group East | OP-49-0005 | Northumberland | 3/26/99 | 3/29/05, 70 FR 15774 | See also 52.2064(i)(21). |
Jeraco Enterprises, Inc | OP-49-0014 | Northumberland | 4/6/97 | 3/29/05, 70 FR 15774 | See also 52.2064(a)(14). |
Insulation Corporation of America | 39-0012 | Lehigh | 10/17/95 | 03/29/05, 70 FR 15774 | (d)(1)(h). |
Pope & Talbot, Inc | 40-0019 | Luzerne | 5/31/96 | 03/29/05, 70 FR 15774 | (d)(1)(h). |
Universal Rundle Corporation | OP-37-059 | Lawrence | 5/31/95 | 03/29/05, 70 FR 15774 | (d)(1)(h). |
Clark Filter | 36-02040 | Lancaster | 2/4/00 | 03/29/05, 70 FR 15774 | (d)(1)(h). |
The Pennsylvania State University-University Park | OP-14-0006 | Centre | 12/30/98 | 3/30/05, 70 FR 16118 | See also 52.2064(c)(9). |
Tennessee Gas Pipeline Company-Charleston Township | OP-59-0001 | Tioga | 5/31/95 | 3/30/05, 70 FR 16118 | (d)(1)(c). |
Tennessee Gas Pipeline Company-Wyalusing Township | OP-08-0002 | Bradford | 5/31/95 | 3/30/05, 70 FR 16118 | (d)(1)(c). |
Masland Industries | 21-2001 | Cumberland | 5/31/95 | 3/30/05, 70 FR 16118 | (d)(1)(c). |
ESSROC Cement Corp | OP-37-003 | Lawrence | 7/27/95 3/31/99 | 3/30/05, 70 FR 16118 | (d)(1)(c). |
The Magee Carpet Company | OP-19-0001 | Columbia | 1/22/97 | 3/30/05, 70 FR 16118 | (d)(1)(c). |
Tennessee Gas Pipeline Company-Howe Township | OP-27-015 | Forest | 7/27/00 | 3/30/05, 70 FR 16118 | (d)(1)(c). |
Transcontinental Gas Pipeline Corporation-Buck Township | 40-0002 40-0002A | Luzerne | 5/31/95 | 3/30/05, 70 FR 16118 | (d)(1)(c). |
Transcontinental Gas Pipe Line Corporation-Peach Bottom Township | 67-2012 | York | 5/5/95 | 3/30/05, 70 FR 16118 | (d)(1)(c). |
Standard Steel Division of Freedom Forge Corp | 44-2001 | Mifflin | 5/31/95 | 3/30/05, 70 FR 16118 | See also 52.2064(i)(19). |
Pope and Talbot, Inc | 35-0004 | Lackawanna | 5/31/96 | 3/30/05, 70 FR 16124 | (d)(1)(d). |
Pennsylvania Power and Light Company | 22-2011 | Dauphin | 6/7/95 | 3/30/05, 70 FR 16124 | (d)(1)(d). |
Ellwood Group Inc | OP-37-313 | Lawrence | 1/31/01 | 3/30/05, 70 FR 16124 | See also 52.2064(c)(3). |
National Fuel Gas Supply Corporation | 53-0009A 53-0009 | Potter | 8/5/96 | 3/30/05, 70 FR 16124 | (d)(1)(d). |
Department of the Army | 28-02002 | Franklin | 2/3/00 | 3/31/05, 70 FR 16416 | See also 52.2064(d)(7). |
Harley-Davidson Motor Company | 67-2032 | York | 4/9/97 | 3/31/05, 70 FR 16416 | (d)(1)(g). |
GE Transportation Systems | OP-43-196 | Mercer | 5/16/01 | 3/31/05, 70 FR 16416 | See also 52.2064(g)(10). |
Stone Container Corporation | 67-2002 | York | 9/3/96 | 3/31/05, 70 FR 16416 | (d)(1)(g). |
Stanley Storage Systems, Inc | 39-0031 | Lehigh | 6/12/98 | 3/31/05, 70 FR 16416 | (d)(1)(g). |
York Group, Inc | OP-67-2014 | York | 7/3/1995 | 3/31/05, 70 FR 16416 | See also 52.2064(h)(11). |
Strick Corporation | OP-19-0002 | Columbia | 6/6/97 | 3/31/05, 70 FR 16416 | (d)(1)(g). |
Grumman Olson, Division of Grumman Allied Industries | OP-41-0002 | Lycoming | 9/25/97 | 3/31/05, 70 FR 16416 | (d)(1)(g). |
Prior Coated Metals, Inc | 39-0005 | Lehigh | 5/26/95 | 3/31/05, 70 FR 16416 | (d)(1)(g). |
Schindler Elevator Corporation | 01-2007 | Adams | 5/24/95 | 3/31/05, 70 FR 16416 | (d)(1)(g). |
Hodge Foundry | OP-43-036 | Mercer | 3/31/99 | 3/31/05, 70 FR 16420 | (d)(1)(a). |
Resolite, A United Dominion Co | OP-10-266 | Butler | 10/15/99 2/18/00 | 3/31/05, 70 FR 16420 | (d)(1)(a). |
Consolidation Coal Co.-Coal Preparation Plant | 30-000-063 | Greene | 5/17/99 | 3/31/05, 70 FR 16420 | (d)(1)(a). |
Urick Foundry | OP-25-053 | Erie | 10/24/96 | 3/31/05, 70 FR 16420 | (d)(1)(a). |
Keystone Sanitary Landfill, Inc | 35-0014 | Lackawanna | 4/19/99 | 3/31/05, 70 FR 16420 | (d)(1)(a). |
Grinnell Corporation | 36-2019 | Lancaster | 6/30/95 | 3/31/05, 70 FR 16420 | See also 52.2064(g)(1). |
Buck Company Inc | 36-2035 | Lancaster | 8/1/95 | 3/31/05, 70 FR 16420 | See also 52.2064(g)(4). |
Owens-Brockway Glass Container, Inc | OP-16-010 | Clarion | 3/27/95 5/31/95 | 3/31/05, 70 FR 16423 | (d)(1)(f). |
Alcoa Extrusion, Inc | 54-0022 | Schuylkill | 4/19/99 | 3/31/05, 70 FR 16423 | (d)(1)(f). |
Pennsylvania Electric Company | 32-000-059 | Indiana | 12/29/94 | 3/31/05, 70 FR 16423 | (d)(1)(f). |
National Gypsum Company | OP-60-0003 | Union | 1/17/96 | 3/31/05, 70 FR 16423 | (d)(1)(f). |
Stoney Creek Technologies, LLC | OP-23-0002 | Delaware | 7/24/03 | 3/31/05, 70 FR 16423 | (d)(1)(f). |
Northeastern Power Company | 54-0008 | Schuylkill | 5/26/95 | 3/31/05, 70 FR 16423 | (d)(1)(f). |
Texas Eastern Transmission Corporation | 22-2010 | Dauphin | 1/31/97 | 3/31/05, 70 FR 16423 | See also 52.2064(a)(18). |
The Miller Group | 54-0024 | Schuykill | 2/1/99 | 3/31/05, 70 FR 16423 | (d)(1)(f). |
CNG Transmission Corporation | 32-000-129 | Indiana | 6/22/95 | 3/31/05, 70 FR 16423 | (d)(1)(f). |
I.H.F.P., Inc | OP-49-0010A | Northumberland | 1/7/98 | 3/31/05, 70 FR 16423 | (d)(1)(f). |
National Forge Company | OP-62-032 | Warren | 5/31/95 | 3/31/05, 70 FR 16423 | (d)(1)(f). |
United Refining Company | OP-62-017 | Warren | 5/31/95, 11/14/96 | 3/31/05, 70 FR 16423 | See also 52.2064(i)(22). |
Petrowax Refining | OP-42-110 | McKean | 3/4/96, 5/31/96 | 3/31/05, 70 FR 16423 | See also 52.2064(g)(14). |
Westvaco Corporation | 07-2008 | Blair | 9/29/95 | 3/31/05, 70 FR 16423 | (d)(1)(f). |
R.H. Sheppard Co., Inc | 67-2016 | York | 8/4/95 | 8/24/05, 70 FR 49496 | (d)(1)(i). |
Wheatland Tube Company | OP-43-182 | Mercer | 7/26/95 | 8/24/05, 70 FR 49496 | See also 52.2064(i)(23). |
Transcontinental Gas Pipeline Corporation | OP-53-0006 | Potter | 10/13/95 | 8/24/05, 70 FR 49496 | (d)(1)(i). |
Transcontinental Gas Pipeline Corporation | OP-19-0004 | Columbia | 5/30/95 | 8/24/05, 70 FR 49496 | (d)(1)(i). |
Transcontinental Gas Pipeline Corporation | PA-41-0005A | Lycoming | 8/9/95 | 8/24/05, 70 FR 49496 | See also 52.2064(b)(1). |
Molded Fiber Glass | OP-25-035 | Erie | 7/30/99 | 11/1/05, 70 FR 65842 | See also 52.2064(g)(17). |
Erie Forge and Steel, Inc | OP-25-924 | Erie | 2/10/00 | 11/1/05, 70 FR 65842 | (d)(1)(k). |
OSRAM SYLVANIA Products, Inc | OP-59-0007 | Tioga | 1/22/98 | 11/1/05, 70 FR 65842 | (d)(1)(k). |
Owens-Brockway Glass Container | OP-33-002 | Jefferson | 11/23/98 | 11/1/05, 70 FR 65842 | (d)(1)(k). |
Texas Eastern Transmission Corporation | 32-000-230 | Indiana | 9/25/95 | 11/1/05, 70 FR 65842 | (d)(1)(k). |
SKF, USA, Incorporated | 67-02010A | York | 7/19/00 | 11/1/05, 70 FR 65842 | (d)(1)(k). |
Johnstown America Corporation | 11-000-288 | Cambria | 1/13/99 | 11/1/05, 70 FR 65842 | (d)(1)(k). |
SGL Carbon Corporation | OP-24-131 | Elk | 5/12/95 5/31/95 | 11/1/05, 70 FR 65845 | (d)(1)(e). |
Salem Tube, Inc | OP-43-142 | Mercer | 2/16/99 | 11/1/05, 70 FR 65845 | (d)(1)(e). |
Dominion Trans, Inc | 18-00006 | Clinton | 6/15/99 9/29/03 | 11/1/05, 70 FR 65845 | (d)(1)(e). |
Waste Management Disposal Services of Pennsylvania (Pottstown Landfill) | OP-46-0033 | Berks; Montgomery | 4/20/99 1/27/04 | 11/2/05, 70 FR 66261 | (d)(1)(b). |
Waste Management Disposal Services of PA, Inc | 67-02047 | York | 4/20/99 | 11/2/05, 70 FR 66261 | (d)(1)(b). |
Armstrong World Industries, Inc | 36-2001 | Lancaster | 7/3/99 | 11/2/05, 70 FR 66261 | See also 52.2064(a)(13). |
Cogentrix of Pennsylvania Inc | OP-33-137, PA-33-302-014, OP-33-302-014, PA 33-399-004, OP 33-399-004 | Jefferson | 1/27/98 11/15/90 5/31/93 10/31/98 5/31/93 | 3/8/06, 71 FR 11514 | (d)(1)(l). |
Scrubgrass Generating Company, LP | OP-61-0181 | Venango | 4/30/98 | 3/8/06, 71 FR 11514 | (d)(1)(l). |
Wheelabrator Frackville Energy Co | OP-54-005 | Schuylkill | 9/18/98 | 3/8/06, 71 FR 11514 | (d)(1)(l). |
Indiana University of Pennsylvania-S.W. Jack Cogeneration Facility | OP-32-000-200 | Indiana | 9/24/98 | 3/8/06, 71 FR 11514 | (d)(1)(l). |
Fleetwood Motor Homes | OP-49-0011 | Northumberland | 10/30/98 | 3/8/06, 71 FR 11514 | (d)(1)(l). |
Piney Creek, LP | OP-16-0127 | Clarion | 12/18/98 | 3/8/06, 71 FR 11514 | (d)(1)(l). |
Statoil Energy Power Paxton, LP | OP-22-02015 | Dauphin | 6/30/99 | 3/8/06, 71 FR 11514 | See also 52.2064(a)(11). |
Harrisburg Steamworks | OP-22-02005 | Dauphin | 3/23/99 | 3/8/06, 71 FR 11514 | See also 52.2064(a)(11). |
Cove Shoe Company | OP-07-02028 | Blair | 4/7/99 | 3/8/06, 71 FR 11514 | (d)(1)(l). |
PP&L-Fichbach C.T. Facility | OP-54-0011 | Schuylkill | 6/1/99 | 3/8/06, 71 FR 11514 | (d)(1)(l). |
PP&L-Allentown C.T. Facility | OP-39-0009 | Lehigh | 6/1/99 | 3/8/06, 71 FR 11514 | (d)(1)(l). |
PP&L-Harwood C.T. Facility | OP-40-0016 | Luzerne | 6/1/99 | 3/8/06, 71 FR 11514 | (d)(1)(l). |
PP&L-Jenkins C.T. Facility | OP-40-0017 | Luzerne | 6/1/99 | 3/8/06, 71 FR 11514 | (d)(1)(l). |
The International Metals Reclamation Co | OP-37-243 | Lawrence | 8/9/00 | 3/31/06, 71 FR 16235 | See also 52.2064(g)(13). |
Petrowax, PA, Inc | PA 61-020 | Venango | 1/2/96 | 3/31/06, 71 FR 16235 | (d)(1)(m). |
Pennsylvania Electric Company | OP-32-000-059 | Indiana | 12/29/94 | 04/28/06, 71 FR 25070 | (d)(1)(n). |
The Harrisburg Authority | OP-22-2007 | Dauphin | 1/02/95 | 4/28/06, 71 FR 25070 | (d)(1)(n). |
Texas Eastern Transmission Corp | OP-50-02001 | Perry | 4/12/99 | 4/28/06, 71 FR 25070 | See also 52.2064(a)(16). |
Graybec Lime, Inc | OP-14-0004 | Centre | 4/16/99 | 4/28/06, 71 FR 25070 | See also 52.2064(c)(5). |
Techneglas, Inc | OP-40-0009A | Luzerne | 1/29/99 | 4/28/06, 71 FR 25070 | (d)(1)(n). |
DLM Foods (formerly Heinz USA) | CO 211 | Allegheny | 3/8/96 | 05/11/06, 71 FR 27394 | (d)(1)(o). |
NRG Energy Center (formerly Pittsburgh Thermal Limited Partnership) | CO220 | Allegheny | 3/4/96 | 05/11/06, 71 FR 27394 | See also 52.2064(e)(3). |
Tasty Baking Oxford, Inc | OP-15-0104 | Chester | 5/12/04 | 05/11/06, 71 FR 27394 | (d)(1)(o). |
Silberline Manufacturing Company | OP-13-0014 | Carbon | 4/19/99 | 05/11/06, 71 FR 27394 | (d)(1)(o). |
Adhesives Research, Inc | OP-67-2007 | York | 7/1/95 | 05/11/06, 71 FR 27394 | (d)(1)(o). |
Mohawk Flush Doors, Inc | OP-49-0001 | Northumberland | 1/20/99 | 05/11/06, 71 FR 27394 | (d)(1)(o). |
Bigbee Steel and Tank Company | 36-2024 | Lancaster | 7/7/95 | 6/13/06, 71 FR 34011 | (d)(1)(p). |
Conoco Phillips Company | OP-23-0003 | Delaware | 4/29/04 | 6/13/06, 71 FR 34011 | See also 52.2064(g)(18). |
The Hershey Company | 22-02004B | Dauphin | 12/23/05 | 6/13/06, 71 FR 34011 | (d)(1)(p). |
LORD Corporation, Cambridge Springs | OP-20-123 | Crawford | 7/27/95 | 6/13/06, 71 FR 34011 | (d)(1)(p). |
Pittsburgh Corning Corporation | PA-42-009 | McKean | 5/31/95 | 6/13/06, 71 FR 34011 | (d)(1)(p). |
Small Tube Manufacturing, LLC | 07-02010 | Blair | 2/27/06 | 6/13/06, 71 FR 34011 | (d)(1)(p). |
Texas Eastern Transmission Corporation, Holbrook Compressor Station | 30-000-077 | Greene | 1/3/97 | 6/13/06, 71 FR 34011 | (d)(1)(p). |
Willamette Industries, Johnsonburgh Mill | OP-24-009 | Elk | 5/23/95 | 6/13/06, 71 FR 34011 | See also 52.2064(g)(7). |
American Refining Group, Inc | OP-42-004 | McKean | 11/23/98 | 6/14/06, 71 FR 34259 | See also 52.2064(i)(5). |
Bellefonte Lime Company | OP-14-0002 | Centre | 10/19/98 | 6/14/06, 71 FR 34259 | See also 52.2064(c)(5). |
Butter Krust Baking Company, Inc | OP-49-0006 | Northumberland | 11/5/96 | 6/14/06, 71 FR 34259 | (d)(1)(q). |
Carnegie Natural Gas Company | 30-000-106 | Greene | 9/22/95 | 6/14/06, 71 FR 34259 | (d)(1)(q). |
Caterpillar, Inc | 67-2017 | York | 8/1/95 | 6/14/06, 71 FR 34259 | (d)(1)(q). |
Gencorp, Inc | 54-0009 | Schuylkill | 5/31/96 | 6/14/06, 71 FR 34259 | See also 52.2064(i)(15). |
Harris Semiconductor | OP-40-0001A | Luzerne | 4/16/99 | 6/14/06, 71 FR 34259 | (d)(1)(q). |
Merisol Antioxidants LLC | OP-61-00011 | Venango | 4/18/05 | 6/14/06, 71 FR 34259 | See also 52.2064(g)(20). |
Norcon Power Partners, L.P | OP-25-923 | Erie | 9/21/95 | 6/14/06, 71 FR 34259 | (d)(1)(q). |
Triangle Pacific Corp | 34-2001 | Juniata | 5/31/95 | 6/14/06, 71 FR 34259 | (d)(1)(q). |
Viking Energy of Northumberland Limited Partnership | OP-49-0004 | Northumberland | 5/30/95 | 6/14/06, 71 FR 34259 | (d)(1)(q). |
White Cap, Inc | 40-0004 | Luzerne | 7/20/95 | 6/14/06, 71 FR 34259 | (d)(1)(q). |
Carlisle Tire & Rubber Company | 21-2003 | Cumberland | 3/10/95 | 7/11/06, 71 FR 38993 | (d)(1)(t). |
The Carbide/Graphite Group, Inc | OP-24-012 | Elk | 5/12/95 | 7/11/06, 71 FR 38993 | See also 52.2064(g)(11). |
Celotex Corporation | OP-49-0013 | Northumberland | 6/18/99 | 7/11/06, 71 FR 38993 | (d)(1)(t). |
American Railcar Industries, Inc. Shippers Car Line Division | OP-49-0012 | Northumberland | 11/29/95 | 7/11/06, 71 FR 38993 | (d)(1)(t). |
ACF Industries, Inc | OP-49-0009 | Northumberland | 12/12/96 | 7/11/06, 71 FR 38993 | (d)(1)(t). |
New Holland North America, Inc | 36-2028 | Lancaster | 10/17/95 | 7/11/06, 71 FR 38993 | (d)(1)(t). |
Allsteel, Inc | 40-001-5 | Luzerne | 5/26/95 | 7/11/06, 71 FR 38993 | (d)(1)(t). |
Ball-Foster Glass Container Co | OP-42-028 | McKean | 7/7/95 3/31/99 | 7/11/06, 71 FR 38993 | (d)(1)(t). |
Pennsylvania Power & Light Company-West Shore | OP-21-2009 | Cumberland | 6/7/95 | 7/11/06, 71 FR 38995 | (d)(1)(r). |
Foster Wheeler Mt. Carmel, Inc | OP-49-0002 | Northumberland | 6/30/95 | 7/11/06, 71 FR 38995 | (d)(1)(r). |
Metropolitan Edison Company-Portland | OP-48-0006 | Northampton | 12/14/94 | 7/11/06, 71 FR 38995 | (d)(1)(r). |
Pennsylvania Power & Light Company | OP-41-0004 | Lycoming | 6/13/95 | 7/11/06, 71 FR 38995 | (d)(1)(r). |
Pennsylvania Power & Light Company | OP-18-0006 | Clinton | 6/13/95 | 7/11/06, 71 FR 38995 | (d)(1)(r). |
Texas Eastern Transmission Corporation | OP-34-2002 | Juniata | 1/31/97 | 7/11/06, 71 FR 38995 | See also 52.2064(a)(17). |
Pennsylvania Power & Light Company | OP-48-0011 | Northampton | 12/19/94 | 7/11/06, 71 FR 38995 | (d)(1)(r). |
Johnstown Corporation | OP-11-000-034 | Cambria | 6/23/95 | 7/11/06, 71 FR 38995 | (d)(1)(r). |
Koppers Industries, Inc | OP-41-0008 | Lycoming | 3/30/99 | 7/13/06, 71 FR 39572 | (d)(1)(s). |
Armstrong World Industries, Inc | OP-36-2002 | Lancaster | 10/31/96 | 6/8/07, 72 FR 31749 | (d)(1)(u). |
Peoples Natural Gas Company | OP-16-124 | Clarion | 8/11/99 | 6/8/07, 72 FR 31749 | (d)(1)(u). |
Dart Container Corporation | OP-36-2015 | Lancaster | 8/31/1995 | 6/8/07, 72 FR 31749 | See also 52.2064(h)(12). |
AT&T Microelectronics | OP-39-0001 | Lehigh | 5/19/95 | 6/8/07, 72 FR 31749 | (d)(1)(u). |
West Penn Power Co | OP-30-000-099 | Greene | 5/17/99 | 6/8/07, 72 FR 31749 | (d)(1)(u). |
Merck and Co., Inc | OP-49-0007B | Northumberland | 5/16/01 | 3/4/08, 73 FR 11553 | See also 52.2064(a)(9). |
Exelon Generation Company-Richmond Generating Station | PA-51-4903 | Philadelphia | 02/09/16 | 10/07/16, 81 FR 69691 | Supersedes previously approved RACT permit. See also 52.2064(f)(2). |
Grays Ferry Cogeneration Partnership-Schuylkill Station | PA-51-4944 | Philadelphia | 1/09/15 | 10/7/16, 81 FR 69691 | Source is aggregated with Veolia Energy Efficiency, LLC and Veolia Energy-Schuylkill Station. See also 52.2064(f)(3). |
Honeywell International-Frankford Plant | PA-51-1151 | Philadelphia | 02/09/16 | 10/07/16, 81 FR 69691 | Supersedes previously approved RACT permit. Source was formerly Sunoco Chemicals, Frankford Plant. See also 52.2064(f)(1). |
Kinder Morgan Liquid Terminals, LLC | PA-51-5003 | Philadelphia | 02/09/16 | 10/7/16, 81 FR 69691 | Supersedes previously approved RACT permit. Source was formerly GATX Terminal Corporation. See also 52.2064(f)(5). |
Naval Surface Warfare Center-Carderock Division, Ship Systems Engineering Station (NSWCCD-SSES) | PA-51-9724 | Philadelphia | 02/09/16 | 10/7/16, 81 FR 69691 | Supersedes previously approved RACT permits. Source was formerly U.S. Navy, Naval Surface Warfare Center, Carderock Division (NSWCCD). See also 52.2064(f)(6). |
Paperworks Industries, Inc | PA-51-1566 | Philadelphia | 1/09/15 | 10/7/16, 81 FR 69691 | Supersedes previously approved RACT permit. Source was formerly Jefferson Smurfit, Corp./Container Corp. of America. See also 52.2064(f)(7). |
Philadelphia Energy Solutions-Refining and Marketing, LLC | PA-51-01501; PA-51-01517 | Philadelphia | 02/09/16 | 10/7/2016, 81 FR 69691 | Supersedes previously approved RACT permit. Source was formerly Sunoco Inc. (R&M)-Philadelphia. See also 52.2064(f)(8). |
Philadelphia Gas Works-Richmond Plant | PA-51-4922 | Philadelphia | 1/09/15 | 10/7/16, 81 FR 69691 | Supersedes previously approved RACT permit. |
Philadelphia Prison System | PA-51-9519 | Philadelphia | 02/09/16 | 10/7/16, 81 FR 69691 | |
Plains Products Terminals, LLC | PA-51-05013 | Philadelphia | 02/09/16 | 10/7/16, 81 FR 69691 | Supersedes previously approved RACT permit. Source was formerly Maritank Philadelphia, Inc. and Exxon Company, USA. |
Temple University-Health Sciences Campus | PA-51-8906 | Philadelphia | 1/09/15 | 10/7/16, 81 FR 69691 | Supersedes previously approved RACT permit. |
Temple University-Main Campus | PA-51-8905 | Philadelphia | 1/09/15 | 10/7/16, 81 FR 69691 | |
Veolia Energy Efficiency, LLC | PA-51-10459 | Philadelphia | 1/9/15 | 10/7/16, 81 FR 69691 | Source is aggregated with Grays Ferry Cogeneration Partnership and Veolia Energy-Schuylkill Station. |
Veolia Energy Philadelphia-Edison Station | PA-51-4902 | Philadelphia | 1/09/15 | 10/7/16, 81 FR 69691 | Supersedes previously approved RACT permit. Source was formerly TRIGEN-Edison Station. |
Veolia Energy Philadelphia-Schuylkill Station | PA-51-4942 | Philadelphia | 02/09/16 | 10/7/16, 81 FR 69691 | Supersedes previously approved RACT permit. Source was formerly TRIGEN-Schuylkill Station. Source is aggregated with Grays Ferry Cogeneration Partnership and Veolia Energy Efficiency, LLC. |
First Quality Tissue, LLC | 18-00030 | Clinton | 9/18/17 | 10/16/20, 85 FR 65718 | 52.2064(a)(1). |
JW Aluminum Company | 41-00013 | Lycoming | 3/01/17 | 10/16/20, 85 FR 65718 | 52.2064(a)(2). |
Ward Manufacturing, LLC | 59-00004 | Tioga | 1/10/17 | 10/16/20, 85 FR 65718 | 52.2064(a)(3). |
Foam Fabricators Inc. | 19-00002 | Columbia | 12/20/17 | 10/16/20, 85 FR 65718 | 52.2064(a)(4). |
Blommer Chocolate Company | 46-00198 | Montgomery | 1/26/17 | 10/16/20, 85 FR 65718 | 52.2064(a)(5). |
Wood-Mode Inc. | 55-00005 | Snyder | 7/12/17 | 10/16/20, 85 FR 65718 | 52.2064(a)(6). |
Exelon Generation-Fairless Hills (formerly referenced as PECO Energy Co.-USX Fairless Works Powerhouse) | 09-00066 | Bucks | 1/27/17 | 10/16/20, 85 FR 65718 | 52.2064(a)(7). |
The Boeing Co. (formerly referenced as Boeing Defense & Space Group-Helicopters Div) | 23-00009 | Delaware | 1/03/17 | 10/16/20, 85 FR 65718 | 52.2064(a)(8). |
Cherokee Pharmaceuticals, LLC (formerly referenced as Merck and Co., Inc) | 49-00007 | Northumberland | 4/24/17 | 10/16/20, 85 FR 65718 | 52.2064(a)(9). |
Resilite Sports Products Inc. | 49-00004 | Northumberland | 8/25/17 | 10/16/20, 85 FR 65718 | 52.2064(a)(10). |
NRG Energy Center Paxton, LLC (formerly referenced as Harrisburg Steamworks and Statoil Energy Power Paxton, LP) | 22-05005 | Dauphin | 3/16/18 | 10/16/20, 85 FR 65718 | 52.2064(a)(11). |
Containment Solutions, Inc./Mt. Union Plant (formerly referenced as Containment Solutions, Inc. and Fluid Containment-Mt. Union) | 31-05005 | Huntingdon | 7/10/18 | 10/16/20, 85 FR 65718 | 52.2064(a)(12). |
Armstrong World Industries, Inc.-Marietta Ceiling Plant (formerly referenced as Armstrong World Industries, Inc.) | 36-05001 | Lancaster | 6/28/18 | 10/16/20, 85 FR 65718 | 52.2064(a)(13). |
Jeraco Enterprises Inc. | 49-00014 | Northumberland | 1/26/18 | 10/16/20, 85 FR 65718 | 52.2064(a)(14). |
Texas Eastern Transmission, L.P.-Bernville (formerly referenced as Texas Eastern Transmission Corp.-Bernville) | 06-05033 | Berks | 3/16/18 | 10/16/20, 85 FR 65718 | 52.2064(a)(15). |
Texas Eastern Transmission, L.P.-Shermans Dale (formerly referenced as Texas Eastern Transmission Corp) | 50-05001 | Perry | 3/26/18 | 10/16/20, 85 FR 65718 | 52.2064(a)(16). |
Texas Eastern Transmission, L.P.-Perulack (formerly referenced as Texas Eastern Transmission Corporation) | 34-05002 | Juniata | 3/27/18 | 10/16/20, 85 FR 65718 | 52.2064(a)(17). |
Texas Eastern Transmission, L.P.-Grantville (formerly referenced as Texas Eastern Transmission Corporation) | 22-05010 | Dauphin | 3/16/18 | 10/16/20, 85 FR 65718 | 52.2064(a)(18). |
Texas Eastern Transmission, L.P.-Bechtelsville (formerly referenced as Texas Eastern Transmission Corp.-Bechtelsville) | 06-05034 | Berks | 4/19/18 | 10/16/20, 85 FR 65718 | 52.2064(a)(19). |
Transco-Salladasburg Station 520 (formerly referenced as Transcontinental Gas Pipeline Corporation) | 41-00001 | Lycoming | 6/6/17 | 10/19/20, 85 FR 66263 | 52.2064(b)(1). |
Novipax (formerly referenced as W. R. Grace and Co.-FORMPAC Div and W. R. Grace and Co.-Reading Plant) | 06-05036 | Berks | 12/19/17 | 10/19/20, 85 FR 66263 | 52.2064(b)(2). |
Sunoco Partners Marketing & Terminals (formerly referenced as Sunoco, Inc. (R&M); Marcus Hook Plant) | 23-00119 | Delaware | 1/20/17 | 10/19/20, 85 FR 66263 | 52.2064(b)(3). |
Global Advanced Metals USA, Inc. (formerly reference as Cabot Performance Materials-Boyertown) | 46-00037 | Montgomery | 3/10/17 | 10/19/20, 85 FR 66263 | 52.2064(b)(4). |
Carpenter Co | 39-00040 | Lehigh | 9/5/18 | 10/20/2020, 85 FR 66489 | 52.2064(c)(1). |
East Penn Manufacturing Co. Inc, Smelter Plant | 06-05040D | Berks | 1/3/19 | 10/20/2020, 85 FR 66489 | 52.2064(c)(2). |
Ellwood Quality Steels Co. (formerly referenced as Ellwood Group Inc) | 37-00264 | Lawrence | 10/13/17 | 10/20/2020, 85 FR 66489 | 52.2064(c)(3). |
GE Transportation-Erie Plant (formerly referenced as General Electric Transportation Systems and General Electric Transportation Systems-Erie) | 25-00025 | Erie | 2/21/18 | 10/20/2020, 85 FR 66489 | 52.2064(c)(4). |
Graymont Pleasant Gap | 14-00002 | Centre | 2/5/18 | 10/20/2020, 85 FR 66489 | 52.2064(c)(5). |
Hazleton Generation (formerly referenced as Williams Generation Company-Hazleton) | 40-00021 | Luzerne | 6/19/18 | 10/20/2020, 85 FR 66489 | 52.2064(c)(6). |
Helix Ironwood | 38-05019 | Lebanon | 9/24/18 | 10/20/2020, 85 FR 66489 | 52.2064(c)(7). |
Magnesita Refractories (formerly referenced as J. E. Baker Co. (Refractories)-York) | 67-05001 | York | 11/27/18 | 10/20/2020, 85 FR 66489 | 52.2064(c)(8). |
Penn State University (formerly referenced as The Pennsylvania State University-University Park) | 14-00003 | Centre | 12/13/17 | 10/20/2020, 85 FR 66489 | 52.2064(c)(9). |
Volvo Construction Equipment North America | 28-05012 | Franklin | 6/1/19 | 9/1/21, 86 FR 48914 | 52.2064(d)(1). |
National Fuel Gas Supply Corporation-Roystone Compressor Station | 62-141H | Warren | 1/16/18 | 9/1/21, 86 FR 48914 | 52.2064(d)(2). |
E.I. DuPont de Nemours and Co | 08-00002 | Bradford | 9/28/18 | 9/1/21, 86 FR 48914 | 52.2064(d)(3). |
Carmeuse Lime Inc | 38-05003 | Lebanon | 3/6/19 | 9/1/21, 86 FR 48914 | 52.2064(d)(4). |
Kovatch Mobile Equipment Corp | 13-00008 | Carbon | 10/27/17 | 9/1/21, 86 FR 48914 | 52.2064(d)(5). |
Merck, Sharpe & Dohme Corp. (formerly referenced as Merck and Co., Inc.-West Point Facility) | 46-00005 | Montgomery | 1/5/17 | 9/1/21, 86 FR 48914 | 52.2064(d)(6). |
Letterkenny Army Depot (formerly referenced as Department of the Army) | 28-05002 | Franklin | 6/1/18 | 9/1/21, 86 FR 48914 | 52.2064(d)(7). |
Fairless Energy, LLC | 09-00124 | Bucks | 12/6/16 | 9/1/21, 86 FR 48914 | 52.2064(d)(8). |
Bellefield Boiler Plant (formerly referenced as Bellefield Boiler Plant-Pittsburgh) | 0047-I003a | Allegheny | 11/30/20 | 10/21/21, 86 FR 58223 | 52.2064(e)(1). |
Eastman Chemical Resins, Inc. Jefferson Site (formerly referenced as Hercules, Inc.-West Elizabeth) | 0058-I026a | Allegheny | 9/30/20 | 10/21/21, 86 FR 58223 | 52.2064(e)(2). |
Energy Center Pittsburgh LLC North Shore Plant (formerly referenced as NRG Energy Center) | 0022-I003a | Allegheny | 11/30/20 | 10/21/21, 86 FR 58223 | 52.2064(e)(3). |
U.S. Steel Mon Valley Works Clairton Plant (formerly referenced as U.S. Steel (USX Corporation)-Clairton Works) | 0052-I020b | Allegheny | 12/11/20 | 10/21/21, 86 FR 58223 | 52.2064(e)(7). |
U.S. Steel Mon Valley Works Edgar Thomson Plant (formerly referenced as USX Corporation-Edgar Thomson Works) | 0051-I008a | Allegheny | 12/7/20 | 10/21/21, 86 FR 58223 | 52.2064(e)(8). |
U.S. Steel Mon Valley Works-Irvin Plant (formerly referenced as USX, Inc.-Irvin Works) | 0050-OP16c | Allegheny | 12/7/20 | 10/21/21, 86 FR 58223 | 52.2064(e)(9). |
Neville Chemical Company | 0060d | Allegheny | 11/10/20 | 10/21/21, 86 FR 58223 | 52.2064(e)(4). |
Pittsburgh Allegheny Co. Thermal, LTD | 0044-I001a | Allegheny | 11/30/20 | 10/21/21,86 FR 58223 | 52.2064(e)(5). |
Universal Stainless & Alloy Products, Inc. | 0027a | Allegheny | 2/20/20 | 10/21/21, 86 FR 58223 | 52.2064(e)(6). |
AdvanSix Resins & Chemicals LLC-Frankford Plant (formerly referenced as Honeywell International-Frankford Plant) | IP16-000276 | Philadelphia | 3/5/2020 | 11/1/2021, 86 FR 60177 | 52.2064(f)(1). |
Vicinity Energy Philadelphia-Schuylkill Station (formerly referenced as Veolia Energy Philadelphia-Schuylkill Station) | IP16-000249 | Philadelphia | 3/4/2020 | 11/1/2021, 86 FR 60177 | 52.2064(f)(4). |
Kinder Morgan Liquid Terminals, LLC-Philadelphia Terminal (formerly referenced as Kinder Morgan Liquid Terminals, LLC) | IP16-000233 | Philadelphia | 4/20/2020 | 11/1/2021, 86 FR 60177 | 52.2064(f)(5). |
Naval Surface Warfare Center-Philadelphia Division (formerly referenced as Naval Surface Warfare Center-Carderock Division, Ship Systems Engineering Station (NSWCCD-SSES)) | IP16-000235 | Philadelphia | 3/20/2020 | 11/1/2021, 86 FR 60177 | 52.2064(f)(6). |
Newman and Company, Inc (formerly referenced as Paperworks Industries, Inc) | IP16-000223 | Philadelphia | 3/31/2020 | 11/1/2021, 86 FR 60177 | 52.2064(f)(7). |
Philadelphia Energy Solutions Refining and Marketing LLC (formerly referenced as Philadelphia Energy Solutions-Refining and Marketing, LLC) | IP-16-00269 | Philadelphia | 4/24/2020 | 11/1/2021, 86 FR 60177 | 52.2064(f)(8). |
Philadelphia Shipyard Inc | IP16-000300 | Philadelphia | 4/8/2020 | 11/1/2021, 86 FR 60177 | 52.2064(f)(9). |
Exelon Generation Company-Richmond Generating Station | IP16-000246 | Philadelphia | 4/20/2020 | 11/1/2021, 86 FR 60177 | 52.2064(f)(2). |
Grays Ferry Cogeneration Partnership-Schuylkill Station | IP-16-000250 | Philadelphia | 3/4/2020 | 11/1/2021, 86 FR 60177 | 52.2064(f)(3). |
Anvil International, LLC (formerly referenced as Grinnell Corporation) | 36-05019 | Lancaster | 2/1/19 | 1/24/22, 87 FR 3442 | 52.2064(g)(1). |
ArcelorMittal Plate LLC Conshohocken Plant (formerly referenced as Bethlehem Lukens Plate) | 46-00011 | Montgomery | 1/26/18 | 1/24/22, 87 FR 3442 | 52.2064(g)(2). |
Braskem America Inc. Marcus Hook (formerly referenced as Epsilon Products Co.-Marcus Hook) | 23-00012 | Delaware | 3/2/20 | 1/24/22, 87 FR 3442 | 52.2064(g)(3). |
Buck Co Inc. Quarryville (formerly referenced as Buck Company Inc) | 36-05053 | Lancaster | 4/1/2020 | 1/24/22, 87 FR 3442 | 52.2064(g)(4). |
Calumet Karns City Refining LLC (formerly referenced as Penreco-Karns City) | 10-027H | Butler | 11/29/18 | 1/24/22, 87 FR 3442 | 52.2064(g)(5). |
Clarion Bathware Marble | 16-00133 | Clarion | 12/19/20 | 1/24/22, 87 FR 3442 | 52.2064(g)(6). |
Domtar Paper Company Johnsonburg Mill (formerly referenced as Willamette Industries, Johnsonburgh Mill) | 24-00009 | Elk | 2/25/2020 | 1/24/22, 87 FR 3442 | 52.2064(g)(7). |
Exelon Generation Company LLC Croydon Generating Station (formerly referenced as PECO Energy Co.-Croydon Generating Station) | 09-00016 | Bucks | 4/11/18 | 1/24/22, 87 FR 3442 | 52.2064(g)(8). |
Georgia-Pacific Panel Products LLC Mt. Jewell MDF Plant | 42-158R | McKean | 1/2/19 | 1/24/22, 87 FR 3442 | 52.2064(g)(9). |
GE Transportation Grove City Engine (formerly referenced as GE Transportation Systems) | 43-00196 | Mercer | 11/7/19 | 1/24/22, 87 FR 3442 | 52.2064(g)(10). |
GrafTech USA LLC St Marys (formerly referenced as The Carbide/Graphite Group, Inc) | 43-00196 | Elk | 5/1/19 | 1/24/22, 87 FR 3442 | 52.2064(g)(11). |
Haysite Reinforced Plastics LLC Erie | 25-00783 | Erie | 7/24/19 | 1/24/22, 87 FR 3442 | 52.2064(g)(12). |
INMETCO Ellwood City (formerly referenced as The International Metals Reclamation Co) | 37-00243 | Lawrence | 12/6/2019 | 1/24/22, 87 FR 3442 | 52.2064(g)(13). |
International Waxes Inc Farmers Valley (formerly referenced as Petrowax Refining) | 42-00011 | McKean | 2/21/20 | 1/24/22, 87 FR 3442 | 52.2064(g)(14). |
Jeld Wen Fiber Division PA | 08-0003 | Bradford | 9/21/18 | 1/24/22, 87 FR 3442 | 52.2064(g)(15). |
Mars Wrigley Confectionery US LLC Elizabethtown | 36-05142 | Lancaster | 7/18/19 | 1/24/22, 87 FR 3442 | 52.2064(g)(16). |
Molded Fiber Glass Company Union City (formerly referenced as Molded Fiber Glass) | 25-00035 | Erie | 2/5/2020 | 1/24/22, 87 FR 3442 | 52.2064(g)(17). |
Monroe Energy LLC Trainer (formerly referenced as Conoco Phillips Company) | 23-00003 | Delaware | 6/5/17 | 1/24/22, 87 FR 3442 | 52.2064(g)(18). |
Nova Chemicals Company Beaver (formerly referenced as Nova Chemicals, Inc.) | 004-00033 | Beaver | 4/2/20 | 1/24/22, 87 FR 3442 | 52.2064(g)(19). |
Sasol Chemicals USA LLC (formerly referenced as Merisol Antioxidants LLC) | 61-00011 | Venango | 2/16/20 | 1/24/22, 87 FR 3442 | 52.2064(g)(20). |
Silberline Manufacturing Company Lincoln Drive Plant (formerly referenced as Silberline Manufacturing Co) | 54-00041 | Schuylkill | 3/16/20 | 1/24/22, 87 FR 3442 | 52.2064(g)(21). |
Superior Tube Company Lower Providence (formerly referenced as Superior Tube Company) | 46-00020 | Montgomery | 2/5/20 | 1/24/22, 87 FR 3442 | 52.2064(g)(22). |
Victaulic Company Alburtis Facility | 39-00069 | Lehigh | 10/24/17 | 1/24/22, 87 FR 3442 | 52.2064(g)(23). |
Victaulic Forks Facility | 48-0009 | Northampton | 10/24/17 | 1/24/22, 87 FR 3442 | 52.2064(g)(24). |
CONSOL PA Coal CO LLC Bailey Prep Plt (formerly referenced as Consol Pennsylvania Coal Company-Bailey Prep Plant) | 30-00072L | Greene | 3/12/2020 | 1/25/2022, 87 FR 3670 | 52.2064(h)(1). |
Latrobe Specialty Metals-A Carpenter Co (formerly referenced as Latrobe Steel Company-Latrobe) | 65-00016 | Westmoreland | 02/26/2020 | 1/25/2022, 87 FR 3670 | 52.2064(h)(2). |
Jessop Steel LLC-Washington Plant [formerly referenced as (Allegheny Ludlum Corporation) Jessop Steel Company-Washington Plant] | 63-00027 | Westmoreland | 03/11/2020 | 1/25/2022, 87 FR 3670 | 52.2064(h)(3). |
IPSCO Koppel Tubulars LLC-Koppel Plt (formerly referenced as Koppel Steel Corporation-Koppel Plant) | 04-00059 | Beaver | 3/16/2020 | 1/25/2022, 87 FR 3670 | 52.2064(h)(4). |
Kawneer Commercial Windows LLC-Cranberry Twp [formerly referenced as Three Rivers Aluminum Company (TRACO)] | 10-00267 | Butler | 3/04/2020 | 1/25/2022, 87 FR 3670 | 52.2064(h)(5). |
Omnova Solutions Inc-Jeannette Plant [formerly referenced as GenCorp (Plastic Films Division)-Jeannette Plant] | 65-00207 | Westmoreland | 2/06/2020 | 1/25/2022, 87 FR 3670 | 52.2064(h)(6). |
IPSCO Koppel Tubulars LLC-Ambridge (formerly referenced as Koppel Steel Corporation-Ambridge Plant) | 04-00227 | Beaver | 3/26/2020 | 1/25/2022, 87 FR 3670 | 52.2064(h)(7). |
ATI Flat Rolled Products Holdings LLC-Vandergrift (formerly referenced as Allegheny Ludlum Steel Corporation) | 65-00137 | Westmoreland | 3/11/2020 | 1/25/2022, 87 FR 3670 | 52.2064(h)(8). |
Mack Trucks, Inc.-Macungie (formerly referenced as Mack Trucks Inc.) | 39-00004 | Lehigh | 4/03/2020 | 1/25/2022, 87 FR 3670 | 52.2064(h)(9). |
Tennessee Gas Pipeline Co., LLC, Marienville STA 307 (formerly referenced as Tennessee Gas Pipeline Company-Howe Township) | 27-015A | Forest | 12/07/2018 | 1/25/2022, 87 FR 3670 | 52.2064(h)(10). |
York Group Inc.-Black Bridge Rd | 67-05014C | York | 3/04/2020 | 1/25/2022, 87 FR 3670 | 52.2064(h)(11). |
Dart Container Corporation-Leola | 36-05015 | Lancaster | 3/30/2020 | 1/25/2022, 87 FR 3670 | 52.2064(h)(12). |
Dart Container Corporation-East Lampeter | 36-05117 | Lancaster | 10/15/2020 | 1/25/2022, 87 FR 3670 | 52.2064(h)(13). |
MarkWest Liberty Bluestone Plant | 10-00368 | Butler | 2/20/2020 | 1/25/2022, 87 FR 3670 | 52.2064(h)(14). |
AK Steel Corp (formerly referenced as Armco, Inc. Butler Operations Main Plant; Armco, Inc. Butler Operations Stainless Plant) | 10-00001 | Butler | 2/25/20 | 1/26/22, 87 FR 3934 | 52.2064(i)(1). |
Allegheny and Tsingshan Stainless LLC, Midland Facility (formerly referenced as J & L Specialty Steel, Inc.-Midland Facility) | 04-00013 | Beaver | 2/24/20 | 1/26/22, 87 FR 3934 | 52.2064(i)(2). |
Alumax Mill Products | 36-05014 | Lancaster | 9/9/19 | 1/26/22, 87 FR 3934 | 52.2064(i)(3). |
American Craft Brewery LLC | 39-00006F | Lehigh | 10/23/19 | 1/26/22, 87 FR 3934 | 52.2064(i)(4). |
American Refining Group Inc (formerly referenced as American Refining Group, Inc) | 42-00004, 42-004K | McKean | 1/15/20, 9/24/19 | 1/26/22, 87 FR 3934 | 52.2064(i)(5). |
American Zinc Recycling Corp (formerly referenced as Horsehead Resource Development Company, Inc) | 13-00001 | Carbon | 3/25/19 | 1/26/22, 87 FR 3934 | 52.2064(i)(6). |
Appvion Operations, Inc. | 07-05001 | Blair | 3/16/20 | 1/26/22, 87 FR 3934 | 52.2064(i)(7). |
ArcelorMittal Steelton LLC (formerly referenced as Bethlehem Steel Corporation) | 22-05012 | Dauphin | 3/1/20 | 1/26/22, 87 FR 3934 | 52.2064(i)(8). |
Carpenter Technology Corporation, Reading Plt (formerly referenced as Carpenter Technology Corporation-Reading Plant) | 06-05007 | Berks | 3/10/20 | 1/26/22, 87 FR 3934 | 52.2064(i)(9). |
Chestnut Ridge Foam Inc (formerly referenced as Chestnut Ridge Foam, Inc.-Latrobe) | 65-00181 | Westmoreland | 1/22/20 | 1/26/22, 87 FR 3934 | 52.2064(i)(10). |
East Penn Manufacturing Company, Inc., Battery Assembly | 06-05069 | Berks | 5/21/2019 | 1/26/22, 87 FR 3934 | 52.2064(i)(11). |
General Carbide Corporation (formerly referenced as General Carbide Corp) | 65-00622 | Westmoreland | 3/3/20 | 1/26/22, 87 FR 3934 | 52.2064(i)(12). |
Lord Corp Saegertown | 20-00194 | Crawford | 4/12/21 | 1/26/22, 87 FR 3934 | 52.2064(i)(13). |
NLMK Pennsylvania LLC, Farrell Plt (formerly referenced as Caparo Steel Co.-Farrell) | 43-00310 | Mercer | 1/22/20 | 1/26/22, 87 FR 3934 | 52.2064(i)(14). |
Omnova Solutions Inc.-Auburn Plant (formerly referenced as Gencorp, Inc) | 54-00009 | Schuylkill | 6/26/18 | 1/26/22,87 FR 3934 | 52.2064(i)(15). |
Pixelle Specialty Solutions LLC-Spring Grove Mill | 67-05004 | York | 4/1/20 | 1/26/22, 87 FR 3934 | 52.2064(i)(16). |
Sonneborn LLC (formerly referenced as Crompton Corporation, Fairview Township; Witco Corp-Petrolia Facility) | 10-037I | Butler | 9/17/19 | 1/26/22, 87 FR 3934 | 52.2064(i)(17). |
Specialty Tires of America, Indiana Plant (formerly referenced as Specialty Tires of America, Inc) | 32-00065 | Indiana | 1/16/19 | 1/26/22, 87 FR 3934 | 52.2064(i)(18). |
Standard Steel LLC (formerly referenced as Standard Steel Division of Freedom Forge Corp) | 44-05001 | Mifflin | 8/16/19 | 1/26/22, 87 FR 3934 | 52.2064(i)(19). |
Tennessee Gas Pipeline Co., Mercer Station 219 (formerly referenced as Tennessee Gas Pipeline Company, Station 219) | 43-00272 | Mercer | 1/2/19 | 1/26/22,87 FR 3934 | 52.2064(i)(20). |
Truck Accessories Group Milton Plant (formerly referenced as Truck Accessories Group East) | 49-00020 | Northumberland | 1/14/20 | 1/26/22, 87 FR 3934 | 52.2064(i)(21). |
United Refining Co (formerly referenced as United Refining Company) | 62-00017 | Warren | 2/6/20 | 1/26/22, 87 FR 3934 | 52.2064(i)(22). |
Wheatland Tube Company | 43-00182 | Mercer | 3/26/19 | 1/26/22, 87 FR 3934 | 52.2064(i)(23). |
ArcelorMittal Plate LLC Coatesville (formerly referenced as Lukens Steel Co.-Coatesville) | 15-00010 | Chester | 3/18/20 | 8/19/2022, 87 FR 50951 | 52.2064(j)(1). |
ATI Flat Rolled Products Holdings, LLC (formerly referenced as Allegheny Ludlum Corporation-Brackenridge) | 0059-I009a 0059-I008d | Allegheny | 12/3/20 4/21/21 | 8/19/2022, 87 FR 50951 | 52.2064(j)(2). |
Boyertown Foundry Company | 06-05063 | Berks | 8/1/20 | 8/19/2022, 87 FR 50951 | 52.2064(j)(3). |
Grove US LLC Shady Grove Plant | 28-05004 | Franklin | 1/1/21 | 8/19/2022, 87 FR 50951 | 52.2064(j)(4). |
INDSPEC Chemical Corporation Petrolia | 10-00021 | Butler | 12/17/20 | 8/19/2022, 87 FR 50951 | 52.2064(j)(5). |
Texas Eastern Transmission LP Lilly Station | 11-00258 | Cambria | 12/10/21 | 8/19/2022, 87 FR 50951 | 52.2064(j)(6). |
Hydro Carbide Tool Company (formerly referenced as Fansteel Hydro Carbide) | 65-00860 | Westmoreland | 11/15/19 | 9/20/22, 87 FR 57403 | 52.2064(k)(1). |
PPG Industries Springdale Plant (formerly referenced as PPG Industries, Inc.-Springdale) | 0057-OP18a | Allegheny | 2/28/2020 | 9/21/2022, 86 FR 57612 | 52.2064(l)(1). |
1 The cross-references that are not § 52.2064 are to material that pre-date the notebook format. For more information, see § 52.2063 .
Name of source | Permit No. | County | State effective date | EPA approval date | Additional explanation/§ 52.2063 citation |
National Can Company Fres-co Systems, USA Inc. Paramount Packaging Corp | 85-524 85-525 | Bucks | 3/1/85 | 4/21/88, 53 FR 13121 | (c)(68); transfer of offsets from NCCo to Fresco and Paramount. |
Name of source | Permit No. | County | State effective date | EPA approval date | Additional explanation/§ 52.2063 citation |
USX Corporation, Clairton Coke Works | 200 | Allegheny | 11/17/94 | 8/18/95, 60 FR 43012 | (c)(99). |
Reliant Energy Mid-Atlantic Power Holdings LLC, Warren Generating Station | SO2-62-00012 | Warren | 11/21/01 | 1/17/03, 68 FR 2459 | (c)(190)(i)(C)(1). |
United Refining Company | SO2-62-017E | Warren | 6/11/01 | 1/17/03, 68 FR 2459 | (c)(190)(i)(C)(2). |
Trigen-Philadelphia Energy Corporation | SO2-95-002 | Philadelphia | 7/27/00 | 9/9/02, 67 FR 57155 | (c)(193)(i)(B)(1). |
Grays Ferry Cogeneration Partnership | SO2-95-002A | Philadelphia | 7/27/00 | 9/9/02, 67 FR 57155 | (c)(193)(i)(B)(2). |
PECO Energy Company, Schuylkill Generating Station | SO2-95-006 | Philadelphia | 7/27/00 | 9/9/02, 67 FR 57155 | (c)(193)(i)(B)(3). |
Sunoco, Inc. (R&M) Philadelphia Refinery | SO2-95-039 | Philadelphia | 7/27/00 | 9/9/02, 67 FR 57155 | (c)(193)(i)(B)(4). |
United Refining Company | None | Warren | 9/29/17 | 10/12/18, 83 FR 51636 | Sulfur dioxide emission limits and related parameters in unredacted portions of the Consent Order and Agreement. |
Bruce Mansfield Generating Station | FirstEnergy Redacted Consent Order and Agreement | Beaver | 10/1/18 | 10/1/19, 84 FR 52000 | Sulfur dioxide emission limits and related parameters in unredacted portions of the Consent Order and Agreement dated 9/21/17. |
Jewel Acquisition, LLC, Midland Facility | Jewel Acquisition Redacted Consent Order and Agreement | Beaver | 9/21/17 | 10/1/19, 84 FR 52000 | Operational restrictions and related parameters in unredacted portions of the Consent Order and Agreement. |
U.S. Steel Clairton | Redacted Installation Permit 0052-1017 | Allegheny | 9/14/17 | 4/23/20, 85 FR 22608 | Sulfur dioxide emission limits and related parameters in unredacted portions of the Installation Permit. |
U.S. Steel Edgar Thomson | Redacted Installation Permit 0051-1006 | Allegheny | 9/14/17 | 4/23/20, 85 FR 22608 | Sulfur dioxide emission limits and related parameters in unredacted portions of the Installation Permit. |
U.S. Steel Irvin | Redacted Installation Permit 0050-1008 | Allegheny | 9/14/17 | 4/23/20, 85 FR 22608 | Sulfur dioxide emission limits and related parameters in unredacted portions of the Installation Permit. |
Braddock Recovery/Harsco Metals | Redacted Installation Permit 0265-1001 | Allegheny | 9/14/17 | 4/23/20, 85 FR 22608 | Sulfur dioxide emission limits and related parameters in unredacted portions of the Installation Permit. |
Conemaugh Plant, Genon NE Management Co | Title V permit 32-00059 | Indiana | 10/28/15 | 10/19/20, 85 FR 66255 | Sulfur dioxide emission limits and associated compliance parameters in unredacted portions of the Title V permit provided to EPA on May 13, 2020. |
Conemaugh Plant, Genon NE Management Co | Order | Indiana | 10/11/17 | 10/19/20, 85 FR 66255 | Contingency measures in unredacted portion of the Order. |
Homer City Generation | Plan Approvals 32-00055H and 32-00055I | Indiana | 2/28/17 | 10/19/20, 85 FR 66255 | Sulfur dioxide emission limits and associated compliance parameters in unredacted portions of the Plan Approvals provided to EPA on May 13, 2020. |
Homer City Generation | Consent Order and Agreement | Indiana | 10/3/17 | 10/19/20, 85 FR 66255 | Contingency measures in unredacted portion of Consent Order and Agreement. |
Seward Station | Title V Permit 32-00040 | Indiana | 4/8/16 | 10/19/20, 85 FR 66255 | Sulfur dioxide emission limits and associated compliance parameters in unredacted portions of the Title V permit provided to EPA on May 13, 2020. |
Seward Station | Consent Order and Agreement | Indiana | 10/3/17 | 10/19/20, 85 FR 66255 | Contingency measures in unredacted portion of the Consent Order and Agreement. |
Keystone Plant | Consent Order | Armstrong | 10/1/18 | 10/19/20, 85 FR 66255 | Sulfur dioxide emission limits established with AERMOD modeling without AERMOIST and related parameters in unredacted portions of the Consent Order dated 10/11/17. |
Name of source | Permit No. | County | State effective date | EPA approval date | Additional explanation/§ 52.2063 citation |
East Penn Manufacturing Corp | [None] | Berks | 5/29/84 | 7/27/84, 49 FR 30179 | (c)(62). |
General Battery Corporation | [None] | Berks | 5/29/84 | 7/27/84, 49 FR 30179 | (c)(62) |
Tonolli Corporation (Closed) | [None] | Carbon | 5/29/84 | 7/27/84, 49 FR 30179 | (c)(62). |
Franklin Smelting and Refining Corporation | [None] | Philadelphia | 9/21/94 | 12/20/96, 61 FR 67275 | (c)(112). |
MDC Industries, Inc | [None] | Philadelphia | 9/21/94 | 12/20/96, 61 FR 67275 | (c)(112). |
Anzon, Inc | [None] | Philadelphia | 9/21/94 | 12/20/96, 61 FR 67275 | (c)(112). |
Name of non-regulatory SIP revision | Applicable geographic area | State submittal date | EPA approval date | Additional explanation |
Sulfur Dioxide Attainment Demonstration | Conewego, Pleasant, and Glade Townships; City of Warren (Warren Co.) | 8/20/01 | 1/17/03, 68 FR 2454 | 52.2033(b). |
Sulfur Dioxide Attainment Demonstration | Allegheny County-sulfur dioxide area defined in 40 CFR 81.339 | 8/15/03 | 7/21/04, 69 FR 43522 | 52.2033(c). |
Photochemical Assessment Monitoring Stations (PAMS) Program | Philadelphia-Wilmington-Trenton Ozone Nonattainment Area | 9/23/94 | 9/11/95, 60 FR 47081 | 52.2035. |
1990 Base Year Emission Inventory-Carbon Monoxide | Philadelphia County | 9/8/95 10/30/95 | 1/30/96, 61 FR 2982 | 52.2036(a). |
1990 Base Year Emission Inventory-VOC | Pittsburgh-Beaver Valley Ozone Nonattainment Area | 3/22/96 2/18/97 7/22/98 | 4/3/01, 66 FR 17634 | 52.2036(d). |
1990 Base Year Emission Inventory-VOC, CO, NOX | Reading Area (Berks County) | 1/28/97 | 5/7/97, 62 FR 24846 | 52.2036(e). |
1990 Base Year Emission Inventory-VOC | Philadelphia-Wilmington-Trenton Ozone Nonattainment Area | 9/12/96 | 6/9/97, 62 FR 31343 | 52.2036(i). |
1990 Base Year Emission Inventory-NOX | Philadelphia-Wilmington-Trenton Ozone Nonattainment Area | 7/31/98 | 6/17/99, 64 FR 32422 | 52.2036(l). |
1990 Base Year Emission Inventory-NOX | Pittsburgh-Beaver Valley Ozone Nonattainment Area | 3/22/96 2/18/97 | 10/19/01, 66 FR 53094 | 52.2036(m). |
1990 Base Year Emission Inventory-Carbon Monoxide | City of Pittsburgh-CBD & Oakland | 11/12/92 8/17/01 | 11/12/02, 67 FR 68521 | 52.2036(n). |
Post 1996 Rate of Progress Plan | Philadelphia-Wilmington-Trenton Ozone Nonattainment Area | 7/31/98 2/25/00 | 10/26/01, 66 FR 54143 | 52.2037(i). |
One-Hour Ozone Attainment Demonstration | Philadelphia-Wilmington-Trenton Ozone Nonattainment Area | 4/30/98 8/21/98 2/25/00 7/19/01 | 10/26/01, 66 FR 54143 | 52.2037(j). |
Mobile Budgets for Post-1996 and 2005 attainment plans | Philadelphia-Wilmington-Trenton Ozone Nonattainment Area | 2/25/00 | 10/26/01, 66 FR 54143 | 52.2037(k). |
2/23/04 | 5/21/04, 69 FR 29238 | 52.2037(k). | ||
15% Rate of Progress Plan | Pittsburgh-Beaver Valley Ozone Nonattainment Area | 3/22/96 2/18/97 7/22/98 | 4/3/01, 66 FR 17634 | 52.2038(a). |
15% Rate of Progress Plan | Philadelphia-Wilmington-Trenton Ozone Nonattainment Area | 9/12/96 4/10/97 6/5/98 | 8/24/01, 66 FR 44547 | 52.2038(b). |
Control of Asphalt Paving Material (Emission offset) | Defined 16-county area in Western PA and Southwestern PA | 5/20/77 7/15/77 | 10/6/77, 42 FR 54417 | 52.1120(c)(15), 52.2054. |
Particulate matter SIP | Allegheny County-Clairton PM10 nonattainment area | 1/6/94 | 9/8/98, 63 FR 47434 | 52.2059. |
Small Business Assistance Program | Statewide | 2/1/93 | 1/6/95, 60 FR 1738 | 52.2060. |
Source Testing Manual | Allegheny County | 9/10/79 | 10/21/81, 46 FR 51607 | 52.2063(c)(4). |
Ozone Nonattainment Plan | Statewide | 4/24/79 | 5/20/80, 46 FR 33607 | 52.2063(c)(22). |
Non-regulatory measures | Southwest Pa. AQCR | 9/17/79 | 5/20/80, 46 FR 33607 | 52.2063(c)(30). |
Air Quality Monitoring Network | Statewide (except Allegheny County) | 1/25/80 | 8/5/81, 46 FR 39822 | 52.2063(c)(34). |
Attainment plan for sulfur dioxide | Armstrong County | 4/9/81 | 8/18/81, 46 FR 43423 | 52.2063(c)(36). |
Air Quality Monitoring Network | Allegheny County | 12/24/80 | 9/15/81, 46 FR 45762 | 52.2063(c)(38). |
Expanded Ridesharing Program | Metro. Philadelphia AQCR | 12/9/81 | 10/7/82, 47 FR 44259 | 52.2063(c)(46). |
Lead (Pb) SIP | Allegheny County | 9/6/83 | 2/6/84, 49 FR 4379 | 52.2063(c)(59). |
Lead (Pb) SIP | Philadelphia | 8/29/83 5/15/84 | 8/1/84, 49 FR 30696 | 52.2063(c)(61). |
Lead (Pb) SIP | Statewide (except Philadelphia and Allegheny Counties) | 9/30/82 6/8/84 | 7/27/84, 49 FR 30179 | 52.2063(c)(62). |
Ozone and Carbon Monoxide Plan | Metro. Philadelphia AQCR | 6/30/82 10/24/83 | 2/26/85, 45 FR 7772 | 52.2063(c)(63). |
Ozone and Carbon Monoxide Plan | Southwestern Pa AQCR | 6/30/82 10/24/83 | 2/26/85, 45 FR 7772 | 52.2063(c)(63). |
Ozone and Carbon Monoxide Plan | Allentown-Bethlehem-Easton Air Basin | 6/30/82 10/24/83 | 2/26/85, 45 FR 7772 | 52.2063(c)(63). |
Carbon Monoxide Maintenance Plan | Philadelphia County | 9/8/95, 10/30/95 | 1/30/96, 61 FR 2982 | 52.2063(c)(105). |
9/3/04 | 4/4/05, 70 FR 16958 | Revised Carbon Monoxide Maintenance Plan Base Year Emissions Inventory using MOBILE6. | ||
3/19/07 | 10/5/07, 72 FR 56911 | Conversion of the Carbon Monoxide Maintenance Plan to a Limited Maintenance Plan Option. | ||
Source Testing Manual | Statewide | 11/26/94 | 7/30/96, 61 FR 39597 | 52.2063(c)(110)(i)(D); cross-referenced in Section 139.5 . |
Continuous Source Testing Manual | Statewide | 11/26/94 | 7/30/96, 61 FR 39597 | 52.2063(c)(110) (i)(D); cross-referenced in Section 139.5 . |
Ozone Maintenance Plan | Reading Area (Berks County) | 1/28/97 | 5/7/97, 62 FR 24846 | 52.2063(c)(123). |
12/09/03 | 2/26/04, 68 FR 8824 | 52.2063(c)(222). | ||
Ozone Maintenance Plan | Pittsburgh-Beaver Valley Ozone Nonattainment Area | 5/21/01 | 10/19/01, 66 FR 53094 | 52.2063(c)(188). |
4/11/03 | 8/5/03, 68 FR 46099 | 52.2063(c)(210). | ||
4/22/04 | 12/10/04, 69 FR 71212 | 52.2063(c)(226). | ||
Carbon Monoxide Maintenance Plan | City of Pittsburgh-Central Business District & Oakland | 8/17/01 | 11/12/02 67 FR 68521 | 52.2063(c)(189). |
7/18/12; 11/26/13 | 3/27/14, 79 FR 17054 | Limited maintenance plan covering the 10-year period through 2022. | ||
PM10 Maintenance Plan | Allegheny County-Clairton PM10 nonattainment area | 9/14/02 | 9/11/03, 68 FR 53515 | 52.2063(c)(215). |
7/21/21 | 9/11/23, 88 FR 62295 | Limited maintenance plan covering the second 10-year period through 2023. "Allegheny County" is the designated name for this area under 40 CFR 81.339 , but it has also been referred to as the "Liberty Borough area" in numerous regulatory actions. | ||
Sulfur Dioxide Maintenance Plan | Conewego, Pleasant, and Glade Townships; City of Warren (Warren Co.) | 5/7/04 | 7/1/04, 69 FR 39860 | 52.2063(c)(224). |
8-Hour Ozone Maintenance Plan and 2002 Base Year Emissions Inventory | Lancaster Area (Lancaster County) | 9/20/06 11/8/06 | 7/6/07, 72 FR 36889. | |
8-Hour Ozone Maintenance Plan and 2002 Base Year Emissions Inventory | Tioga County | 9/28/06, 11/14/06 | 7/6/07, 72 FR 36892 | |
8-Hour Ozone Maintenance Plan and 2002 Base Year Emissions Inventory | Franklin County Area (Franklin County) | 9/20/06 11/8/06 | 7/25/07, 72 FR 40746. | |
8-Hour Ozone Maintenance Plan and 2002 Base Year Emissions Inventory | Harrisburg-Lebanon-Carlisle, PA: Cumberland County, Dauphin County, Lebanon County, Perry County | 3/27/07 | 7/25/07, 72 FR 40749. | |
8-Hour Ozone Maintenance Plan and 2002 Base Year Emissions Inventory | Johnstown (Cambria County) | 3/27/07 | 8/1/07, 72 FR 41903 | Correction Notice published 3/4/08, 73 FR 11560. |
8-Hour Ozone Maintenance Plan and 2002 Base Year Emissions Inventory | Blair County | 2/8/07 | 8/1/07, 72 FR 41906 | |
8-Hour Ozone Maintenance Plan and 2002 Base Year Emissions Inventory | Reading Area (Berks County) | 1/25/07 | 8/24/07 72 FR 41906 | Correction Notice published 1/14/08, 73 FR 2162. |
7/22/13 | 3/31/14, 79 FR 17875 | Revised 2009 and 2018 Motor Vehicle Emission Budgets. Revised 2009 and 2018 point and area source inventories. See sections 52.2043 and 52.2052 . | ||
8-Hour Ozone Maintenance Plan and 2002 Base Year Emissions Inventory | Erie County | 4/24/07 | 10/9/07, 72 FR 57207 | Correction Notices published 1/14/08, 73 FR 2162; and 3/4/08, 73 FR 11560. |
8-Hour Ozone Maintenance Plan and 2002 Base Year Emissions Inventory | Mercer County | 3/27/07 | 10/19/07, 72 FR 59213 | Correction Notices published 1/14/08, 73 FR 2162; and 3/4/08, 73 FR 11560. |
8-Hour Ozone Maintenance Plan and 2002 Base Year Emissions Inventory | State College (Centre County) | 6/12/07 | 11/14/07, 72 FR 63990. | |
8-Hour Ozone Maintenance Plan and 2002 Base Year Emissions Inventory | Scranton/Wilkes-Barre Area: Lackawanna, Luzerne, Monroe and Wyoming Counties | 6/12/07 | 11/14/07 72 FR 64948 | |
5/28/14 | 6/15/15, 80 FR 34065 | Revised 2009 and 2018 Motor Vehicle Emission Budgets. Revised 2009 and 2018 point source inventories. Revised 2018 area source inventory. General conformity budgets for the construction of the Bell Bend Nuclear Power Plant. See sections 52.2043 and 52.2052 . | ||
8-Hour Ozone Maintenance Plan for the York-Adams, PA Area | York-Adams Counties Area | 6/14/07 | 1/14/08, 73 FR 2163 | |
5/23/08 | 8/13/09, 74 FR 40747. | |||
8-Hour Ozone Maintenance Plan and 2002 Base Year Emissions Inventory | Allentown-Bethlehem-Easton Area: Carbon, Lehigh and Northampton Counties | 6/26/07 | 3/4/08 73 FR 11557 | Technical correction dated 8/9/07 addresses omitted emissions inventory information from 6/26/07 submittals. |
3/7/14 | 5/16/14 [79 FR 28435] | Revised 2009 and 2018 Motor Vehicle Emission Budgets. Revised 2009 and 2018 point source inventories. See sections 52.2043 and 52.2052 . | ||
8-Hour Ozone Maintenance Plan and 2002 Base-Year Inventory | Wayne County | 12/17/07 | 6/6/08, 73 FR 32238. | |
8-Hour Ozone Maintenance Plan and 2002 Base-Year Inventory | Warren County | 12/17/07 | 6/30/08, 73 FR 36802 | |
8-Hour Ozone Maintenance Plan and 2002 Base-Year Inventory | Columbia County | 12/17/07 | 7/2/08, 73 FR 37840. | |
8-Hour Ozone Maintenance Plan and 2002 Base-Year Inventory | Susquehanna County | 12/17/07 | 7/2/08, 73 FR 37841. | |
8-Hour Ozone Maintenance Plan and 2002 Base-Year Inventory | Crawford County | 12/17/07 | 7/2/08, 73 FR 37843. | |
8-Hour Ozone Maintenance Plan and 2002 Base-Year Inventory | Somerset County | 12/17/07 | 7/2/08, 73 FR 37844. | |
8-Hour Ozone Maintenance Plan and 2002 Base-Year Inventory | Snyder County | 12/17/07 | 7/18/08, 73 FR 41271. | |
8-Hour Ozone Maintenance Plan and 2002 Base-Year Inventory | Juniata County | 12/17/07 | 7/18/08, 73 FR 41272. | |
8-Hour Ozone Maintenance Plan and 2002 Base-Year Inventory | Lawrence County | 12/17/07 | 7/18/08, 73 FR 41274. | |
8-Hour Ozone Maintenance Plan and 2002 Base-Year Inventory | Northumberland County | 12/17/07 | 7/18/08, 73 FR 41275. | |
8-Hour Ozone Maintenance Plan and 2002 Base-Year Inventory | Pike County | 12/17/07 | 7/21/08, 73 FR 42263. | |
8-Hour Ozone Maintenance Plan and 2002 Base-Year Inventory | Schuylkill County | 12/17/07 | 8/8/08, 73 FR 46200. | |
2002 Base-Year Inventory | Pittsburgh-Beaver Valley Nonattainment Area: Allegheny, Armstrong, Beaver, Butler, Fayette, Washington, and Westmoreland counties | 4/26/07 | 11/17/08, 73 FR 67776 | The SIP effective date is 12/17/08. |
8-Hour Ozone Maintenance Plan and 2002 Base Year Emissions Inventory | Greene County | 1/25/07, 5/23/08 | 3/19/09, 74 FR 11671. | |
8-Hour Ozone Maintenance Plan and 2002 Base Year Emissions Inventory | Clearfield/Indiana Area: Clearfield and Indiana Counties | 6/14/07, 5/23/08 | 3/19/09, 74 FR 11677. | |
Transportation Conformity Requirements | Entire State | 5/29/08 | 4/29/09, 74 FR 19451 | Memoranda of Understanding between EPA, FHWA, FTA, Pennsylvania, Virginia, and eighteen Metropolitan and Rural Planning Organizations. |
Reasonable Further Progress Plan (RFP), Reasonably Available Control Measures, and RFP Contingency Measures | Pennsylvania portion of the Philadelphia-Wilmington-Atlantic City, PA-DE-MD-NJ 1997 8-hour ozone moderate nonattainment area | 8/29/07, 12/10/09, 4/12/10) | 2/7/11, 76 FR 6559 | |
2002 Base Year Emissions Inventory for Volatile Organic Compounds (VOC), Nitrogen Oxides (NOX), and Carbon Monoxide (CO) | Pennsylvania portion of the Philadelphia-Wilmington-Atlantic City, PA-DE-MD-NJ 1997 8-hour ozone moderate nonattainment area | 8/29/07, 12/10/09, 4/12/10 | 2/7/11, 76 FR 6559 | |
2008 RFP Transportation Conformity Motor Vehicle Emission Budgets | Pennsylvania portion of the Philadelphia-Wilmington-Atlantic City, PA-DE-MD-NJ 1997 8-hour ozone moderate nonattainment area | 8/29/07, 12/10/09, 4/12/10 | 2/7/11, 76 FR 6559 | |
Revision of the Quality Assurance Protocol for the Safety Inspection Program in Non-I/M Counties | Non-I/M Program Region, Counties of: Adams, Armstrong, Bedford, Bradford, Butler, Cameron, Carbon, Clarion, Clearfield, Clinton, Columbia, Crawford, Elk, Fayette, Forest, Franklin, Fulton, Greene, Huntingdon, Indiana, Jefferson, Juniata, Lawrence, McKean, Mifflin, Monroe, Montour, Northumberland, Perry, Pike, Potter, Schuylkill, Snyder, Somerset, Sullivan, Susquehanna, Tioga, Union, Venango, Warren, Wayne, and Wyoming | 5/22/09 | 6/6/11, 76 FR 32321 | Applicable to SIP-approved safety inspection program regulation for non-I/M counties at Title 67, Part 1, Chapter 175. |
Regional Haze Plan | Statewide | 12/20/10 | 7/13/12, 77 FR 41279 | § 52.2042 ; Limited Approval. |
12/20/10 | 4/30/14, 79 FR 24340 | Reissuing of Limited Approval. | ||
Regional Haze Plan | Statewide | 3/25/14 | 1/21/15, 80 FR 2836 | Revises PM10 Best Available Retrofit Technology emission limit for Boiler No. 1 of the Cheswick Power Plant in Allegheny County. |
Regional Haze Plan | Statewide | 3/25/14 | 3/27/15, 80 FR 16286 | Rulemaking pertains to Boiler No. 1 of the Cheswick Power Plant in Allegheny County. Limited approval removes SO2 and NOX Best Available Retrofit Technology limits. Limited disapproval relates to the Federal Implementation Plan at § 52.2042(b) and (c) . |
1997 PM2.5 NAAQS Attainment Demonstration, 2002 Base Year Emissions Inventory, Contingency Measures and Motor Vehicle Emission Budgets for 2009 | Pennsylvania portion of the Philadelphia-Wilmington, PA-NJ-DE PM2.5 Nonattainment Area | 4/12/10, 8/3/12, 1/29/13 | 8/27/12, 77 FR 51930, 4/3/13, 78 FR 19991 | Revised 2009 Motor Vehicle Emission Budgets. The SIP effective date is April 3, 2013. |
Section 110(a)(2) Infrastructure Requirements for the 1997 8-Hour Ozone NAAQS | Statewide | 12/7/07, 6/6/08 | 9/25/12, 77 FR 58955 | This action addresses the following CAA elements or portions thereof: 110(a)(2)(A), (B), (C), (D), (E), (F), (G), (H), (J), (K), (L), and (M). |
Section 110(a)(2) Infrastructure Requirements for the 1997 PM2.5 NAAQS | Statewide | 12/7/07, 6/6/08, 4/26/10 | 9/25/12, 77 FR 58955 | This action addresses the following CAA elements or portions thereof: 110(a)(2)(A), (B), (C), (D), (E), (F), (G), (H), (J), (K), (L), and (M). |
Section 110(a)(2) Infrastructure Requirements for the 2006 PM2.5 NAAQS | Statewide | 4/26/10, 5/24/11 | 9/25/12, 77 FR 58955 | This action addresses the following CAA elements or portions thereof: 110(a)(2)(A), (B), (C), (D), E), (F), (G), (H), (J), (K), (L), and (M). |
2002 Base Year Emissions Inventory for the 1997 fine particulate matter (PM2.5 ) standard | Pittsburgh-Beaver Valley, PA | 11/10/09 | 12/13/12, 77 FR 74115 | 52.2036(p) |
Section 110(a)(2) Infrastructure Requirements for the 1997 8-Hour Ozone NAAQS | Allegheny County | 7/1/08 | 2/28/13, 78 FR 13493 | This action addresses the PSD related elements of the following CAA requirements: 110(a)(2)(C), (D)(i)(II), and (J) |
Section 110(a)(2) Infrastructure Requirements for the 1997 PM2.5 NAAQS | Allegheny County | 7/1/08 | 2/28/13, 78 FR 13493 | This action addresses the PSD related elements of the following CAA requirements: 110(a)(2)(C), (D)(i)(II), and (J) |
Section 110(a)(2) Infrastructure Requirements for the 2006 PM2.5 NAAQS | Allegheny County | 7/1/08 | 2/28/13, 78 FR 13493 | This action addresses the PSD related elements of the following CAA requirements: 110(a)(2)(C), (D)(i)(II), and (J) |
RACT under the 8-hour ozone NAAQS | Allegheny County | 5/5/09 | 6/10/13, 78 FR 34584 | |
RACT under the 1997 8-hour ozone NAAQS | Philadelphia County | 9/29/06 6/22/10 | 12/13/13, 78 FR 75902 | Conditional approval. See § 52.2023(l) . |
2002 Base Year Emissions Inventory for the 1997 Annual PM2.5 NAAQS | Liberty-Clairton PM2.5 Nonattainment Area | 6/17/11 | 1/2/14, 79 FR 54 | 52.2036(q). |
8-Hour Ozone Maintenance Plan and 2002 Base Year Emissions Inventory | Lancaster Area (Lancaster County) | 9/20/06; 11/8/06 | 7/6/07; 72 FR 36889 | |
11/29/12 | 12/26/13,78 FR 78263 | Revised 2009 and 2018 Motor Vehicle Emission Budgets. Revised 2009 and 2018 point source inventory. See sections 52.2043 and 52.2052 . | ||
Section 110(a)(2) Infrastructure Requirements for the 2008 Pb NAAQS | Statewide | 5/24/12 | 4/7/2014, 79 FR 19001 | This rulemaking action addresses the following CAA elements: 110(a)(2)(A), (B), (C), (D)(i)(I), (D)(i)(II), (D)(ii), (E)(i), (E)(iii), (F), (G), (H), (J), (K), (L), and (M). |
7/15/14 | 10/16/14, 79 FR 62005 | This rulemaking action addresses the following CAA elements: 110(a)(2)(E)(ii). | ||
1997 Annual PM2.5 Maintenance Plan | Harrisburg-Lebanon-Carlisle PM2.5 Nonattainment Area | 4/22/14 | 12/8/14, 79 FR 72554 | See § 52.2036(r) and § 52.2059(k) . |
1997 Annual PM2.5 Maintenance Plan | York PM2.5 Nonattainment Area | 4/22/14 | 12/8/14, 79 FR 72554 | See § 52.2036(r) and § 52.2059(l) . |
2006 24-Hour PM2.5 Maintenance Plan | Harrisburg-Lebanon-Carlisle-York PM2.5 Nonattainment Area | 4/22/14 | 12/8/14, 79 FR 72554 | See § 52.2036(r) and § 52.2059(m) . |
1997 Annual PM2.5 Maintenance Plan and 2007 Base Year Emissions Inventory | Reading Area (Berks County) | 11/25/14 | 3/4/15, 80 FR 11582 | See § 52.2036(s) and § 52.2059(n) . |
2006 24-Hour PM2.5 Maintenance Plan and 2007 Base Year Emissions Inventory | Allentown Area (Lehigh and Northampton Counties) | 9/5/14 | 4/13/15, 80 FR 19550 | See § 52.2036(t) and § 52.2059(o) . |
1997 Annual and 2006 24-Hour PM2.5 Maintenance Plan and 2007 Base Year Emissions Inventory | Philadelphia-Wilmington, PA-NJ-DE | 9/5/14 | 4/21/15, 80 FR 22113 | See § 52.2036(u) and § 52.2059(p) . |
Section 110(a)(2) Infrastructure Requirements for the 2010 NO2 NAAQS | Statewide | 7/15/14 | 5/8/15, 80 FR 26462 | This rulemaking action addresses the following CAA elements: 110(a)(2)(A), (B), (C), (D)(i)(II) (prevention of significant deterioration), (D)(ii), (E), (F), (G), (H), (J), (K), (L), and (M). |
Section 110(a)(2) Infrastructure Requirements for the 2012 PM2.5 NAAQS | Statewide | 7/15/14 | 5/8/15, 80 FR 26462 | This rulemaking action addresses the following CAA elements: 110(a)(2)(A), (B), (C), (D)(i)(II) (prevention of significant deterioration), (D)(ii), (E), (F), (G), (H), (J), (K), (L), and (M). |
Section 110(a)(2) Infrastructure Requirements for the 2012 PM2.5 NAAQS | Statewide | 10/11/17 | 10/10/18, 83 FR 50854 | Docket No. 2018-0054. This action addresses the infrastructure element of CAA section 110(a)(2)(D)(i)(I). |
1997 Annual and 2006 24-Hour PM2.5 Maintenance Plan and 2007 Base Year Emissions Inventory | Johnstown Area | 12/3/14 | 7/16/15, 80 FR 42048 | See § 52.2036(w) and § 52.2059(r) . |
1997 Annual and 2006 24-Hour PM2.5 Maintenance Plan and 2007 Base Year Emissions Inventory | Lancaster Area | 4/30/14 | 7/16/15, 80 FR 42052 | See § 52.2036(x) and § 52.2059(s) |
Section 110(a)(2) Infrastructure Requirements for the 2008 ozone NAAQS | Statewide | 7/15/14 | 8/5/15, 80 FR 46507 | This rulemaking action addresses the following CAA elements: 110(a)(2)(A), (B), (C), (D)(i)(II) (prevention of significant deterioration), (D)(ii), (E), (F), (G), (H), (J), (K), (L), and (M). |
Section 110(a)(2) Infrastructure Requirements for the 2010 SO2 NAAQS | Statewide | 7/15/14 | 8/5/15, 80 FR 46507 | This rulemaking action addresses the following CAA elements: 110(a)(2)(A), (B), (C), (D)(i)(II) (prevention of significant deterioration), (D)(ii), (E), (F), (G), (H), (J), (K), (L), and (M). |
1997 Annual and 2006 24-Hour PM2.5 Maintenance Plan, and 2007 and 2011 Base Year Emissions Inventories | Pittsburgh-Beaver Valley | 12/22/14 | 10/2/15, 80 FR 59626 | See § 52.2036(y) and § 52.2059(t) . |
2007 Base Year Emissions Inventory for the 2006 PM2.5 NAAQS | Liberty-Clairton PM2.5 Nonattainment Area | 6/21/13 | 10/2/15, 80 FR 59619 | |
Attainment Plan and Base Year Emissions Inventory for the North Reading nonattainment area for the 2008 lead NAAQS | North Reading Area | 8/12/15 | 4/8/16, 81 FR 20542 | See §§ 52.2036(z) and 52.2055(b) . |
2008 Lead Attainment Plan | Lower Beaver Valley Area | 1/15/15 | 4/25/16, 81 FR 24028 | See §§ 52.2036(aa) and 52.2055(c) . |
2011 Base Year Inventories for the 2008 8-Hour Ozone National Ambient Air Quality Standard | Allentown-Bethlehem-Easton, Lancaster, Pittsburgh-Beaver Valley, and Reading nonattainment areas and the Pennsylvania portion of the Philadelphia-Wilmington-Atlantic City nonattainment area | 9/30/15 | 4/26/16, 81 FR 24495 | See § 52.2036(bb) . |
Philadelphia 1997 8-Hour Ozone RACT Demonstration | Philadelphia County | 9/29/06, 6/22/10, 6/27/14, 7/18/15, 4/26/16 | 10/7/16, 81 FR 69691 | Addressing all applicable RACT requirements for Philadelphia under the 1997 8-hour ozone standards. This rulemaking action converts the prior conditional approval of RACT demonstration to full approval. |
Emission statement requirement certification for the 2008 ozone national ambient air quality standards (NAAQS) | Statewide | November 3, 2017 | 6/6/2018, 83 FR 26222 | Certification that Pennsylvania's previously approved regulation at 25 Pa. Code 135.21, "Emissions Statements," meets the emission statement requirements for the 2008 ozone NAAQS. |
2011 Base Year Emissions Inventory for the 2012 Annual Fine Particulate (PM2.5) National Ambient Air Quality Standard | Delaware County 2012 PM2.5 nonattainment area | 5/5/2017 | 7/3/2018, 83 FR 31067 | |
2011 Base Year Emissions Inventory for the 2012 Annual Fine Particulate (PM2.5) National Ambient Air Quality Standard | Lebanon County 2012 PM2.5 nonattainment area | 9/25/2017 | 7/3/2018, 83 FR 31067 | |
Reasonably Available Control Technology (RACT) for the 2008 ozone national ambient air quality standard (NAAQS) | Statewide | 8/13/18 | 8/16/2024, 89 FR 66602 | After reconsideration of previous approval of CTG portion, EPA is now disapproving, with the exception of one negative declaration. |
Attainment Plan for the Warren, Pennsylvania Nonattainment Area for the 2010 Sulfur Dioxide Primary National Ambient Air Quality Standard | Conewango Township, Glade Township, Pleasant Township, and the City of Warren in Warren County | 10/12/18, 83 FR 51636 | Includes base year emissions inventory. | |
2008 8-Hour Ozone NAAQS Nonattainment New Source Review Requirements | Allentown-Bethlehem-Easton, PA area (includes Carbon, Lehigh, and Northampton Counties), Lancaster, PA area (includes Lancaster County), Pittsburgh-Beaver Valley, PA area (includes Allegheny, Beaver, Butler, Fayette, Washington, and Westmoreland Counties), Reading, PA area (includes Berks County), and Pennsylvania's portion of the Philadelphia-Wilmington-Atlantic City, PA-NJ-MD-DE area (includes Bucks, Chester, Delaware, Montgomery, and Philadelphia Counties) | 10/30/17 | 2/22/2019, 84 FR 5601 | |
2008 8-hour Ozone National Ambient Air Quality Standard Reasonably Available Control Technology Standard | Allegheny County | 07/24/18 | 5/2/2019, 84 FR 18737 | This action pertains to sources covered by CTGs issued prior to July 20, 2014. |
Delaware County 2012 annual PM2.5 maintenance plan | Delaware County | 1/23/19 | 9/30/19, 84 FR 51425 | |
Lebanon County 2012 annual PM2.5 maintenance plan | Lebanon County | 2/11/19 | 9/30/19, 84 FR 51425 | |
Attainment Plan for the Beaver, Pennsylvania Nonattainment Area for the 2010 Sulfur Dioxide Primary National Ambient Air Quality Standard | Industry Borough, Shippingport Borough, Midland Borough, Brighton Township, Potter Township and Vanport Township | 9/29/17 | 10/1/19, 84 FR 52000 | 52.2033(d) |
2008 8-hour Ozone National Ambient Air Quality Standard Reasonably Available Control Technology Standard | Philadelphia County | 08/13/18 | 10/24/2019, 84 FR 56947 | This action pertains to sources covered by CTGs issued prior to July 20, 2014. |
Allegheny Area 2010 SO2 attainment plan and base year emissions inventory | Cities of Clairton, Duquesne, and McKeesport; the Townships of Elizabeth, Forward, and North Versailles, and the following Boroughs: Braddock, Dravosburg, East McKeesport, East Pittsburgh, Elizabeth, Glassport, Jefferson Hills, Liberty, Lincoln, North Braddock, Pleasant Hills, Port Vue, Versailles, Wall, West Elizabeth, and West Mifflin | 10/03/17 | 4/23/20, 85 FR 22608 | Also see: 52.2033(d) and EPA-approved redacted permits for: U.S. Steel Clairton (0052-1017); U.S. Steel Edgar Thompson (0051-1006); U.S. Steel Irvin (0050-1008); and Braddock Recovery/Harsco Metals (0265-1001). |
Second Maintenance Plan for the Franklin (Franklin County) 1997 8-Hour Ozone Nonattainment Area | Franklin County | 3/10/20 | 10/16/20, 85 FR 65728 | |
Attainment Plan for the Indiana, Pennsylvania Nonattainment Area for the 2010 Sulfur Dioxide Primary National Ambient Air Quality Standard | Indiana County and portions of Armstrong County (Plumcreek Township, South Bend Township, and Elderton Borough) | 10/11/17 Supplemental information submitted 02/05/20, redacted permits submitted on 05/13/20 | 10/19/20, 85 FR 66255 | 52.2033(f). |
Reasonably Available Control Technology (RACT) for the 2008 ozone national ambient air quality standard (NAAQS) | Statewide | 8/13/18 | 12/14/20, 85 FR 80624 | This action pertains to control technique guideline (CTG) source categories. |
1997 8-Hour Ozone National Ambient Air Quality Standard Second Maintenance Plan for the Harrisburg-Lebanon-Carlisle Area | Harrisburg-Lebanon-Carlisle Area | 2/27/2020 | 2/9/2021, 86 FR 8691 | |
1997 8-Hour Ozone National Ambient Air Quality Standard Second Maintenance Plan for the Johnstown Area | Johnstown Area | 2/27/2020 | 2/9/2021, 86 FR 8693 | |
Second Maintenance Plan for the Altoona (Blair County) 1997 8-Hour Ozone Nonattainment Area | Blair County | 2/27/20 | 2/9/21, 86 FR 8698 | |
Second Maintenance Plan for the Scranton-Wilke-Barre 1997 8-Hour Ozone Nonattainment Area | Scranton-Wilkes-Barre Area | 3/10/20 | 2/23/21, 86 FR 10832 | Scranton/Wilkes-Barre Area: Lackawanna, Luzerne, Monroe and Wyoming Counties. |
Second Maintenance Plan for the State College 1997 8-Hour Ozone Nonattainment Area | State College Area | 3/10/20 | 3/23/2021, 85 FR 15417 | The State College area consists solely of Centre County. |
Second Maintenance Plan for the Clearfield/Indiana 1997 8-Hour Ozone Nonattainment Area | Clearfield/Indiana Area | 2/27/20 | 5/7/21, 86 FR 24510 | The Clearfield/Indiana area consists of Clearfield and Indiana Counties. |
2012 PM2.5 NAAQS Attainment Demonstration (including 2011 Base Year Emissions Inventory, Particulate Matter Precursor Contribution Demonstration, Reasonable Further Progress Demonstration, Demonstration of Interim Quantitative Milestones to Ensure Timely Attainment. and Motor Vehicle Emission Budgets for 2021) (excluding Section 8, Contingency Measures) | Allegheny County | 09/30/19 10/02/20 | 5/14/21, 86 FR 26401 | Contingency Measures (Section 9) portion of the plan is Conditionally Approved, until 5/16/22. |
1997 8-Hour Ozone National Ambient Air Quality Standard Second Maintenance Plan for the York-Adams Area | York-Adams Area | 3/10/20 | 5/26/21, 86 FR 28277 | The York-Adams area consists of York and Adams Counties. |
1997 8-Hour Ozone National Ambient Air Quality Standard Second Maintenance Plan for the Youngstown-Warren-Sharon Area | Youngstown-Warren-Sharon Area | 3/10/20 | 5/27/21, 86 FR 28499 | The Youngstown-Warren-Sharon area consists of Youngstown borough in Westmoreland County, Warren County, and Sharon, a city in Mercer County. |
Second Maintenance Plan for the Erie 1997 8-Hour Ozone Nonattainment Area | Erie Area | 2/27/20 | 6/1/21, 86 FR 29207 | The Erie area consists solely of Erie County. |
Second Maintenance Plan for the State College 1997 8-Hour Ozone Nonattainment Area | Tioga County Area | 3/10/20 | 6/9/21, 86 FR 30545 | The Tioga County area consists solely of Tioga County. |
Emissions Statement Certification for the 2015 Ozone National Ambient Air Quality Standard | The Pennsylvania portion of the Philadelphia-Wilmington-Atlantic City (PA-NJ-MD-DE) nonattainment area for the 2015 ozone NAAQS | 4/23/20 | 8/25/21, 86 FR 47392 | Certification that Pennsylvania's previously SIP-approved regulations at 25 Pa Code chapter 135 meet the emissions statement requirements of CAA section 182(a)(3)(B) for the 2015 ozone NAAQS. |
Second Maintenance Plan for the State College 1997 8-Hour Ozone Nonattainment Area | Greene County Area | 2/25/20 | 9/2/21, 86 FR 49248 | The Greene County area consists solely of Greene County. |
Attainment Plan for the Indiana, Pennsylvania Nonattainment Area for the 2010 Sulfur Dioxide Primary National Ambient Air Quality Standard | Indiana County and portions of Armstrong County (Plumcreek Township, South Bend Township, and Elderton Borough) | 10/11/17, Supplemental information submitted 02/05/20, updated redacted permits submitted on 05/13/20 | 8/18/22, 87 FR 50785 10/19/20, 85 FR 66255 | Partial Disapproval (attainment demonstration, Reasonably Available Control Technology (RACT)/Reasonably Available Control Measures (RACM) determination, Reasonable Further Progress (RFP) requirements, contingency measures) and Partial Approval (emissions inventory and nonattainment new source review (NNSR) program) 52.2033(f). |
2015 8-Hour Ozone NAAQS Nonattainment New Source Review Requirements | Pennsylvania's portion of the Philadelphia-Wilmington-Atlantic City, PA-NJ-MD-DE area (includes Bucks, Chester, Delaware, Montgomery, and Philadelphia Counties) | 1/8/21; 8/23/21 | 10/3/22, 87 FR 59694 | |
Infrastructure State Implementation Plan Revision Clean Air Act Sections 110 Applicable Requirements for the 2015 8-Hour Ozone National Ambient Air Quality Standard (NAAQS) | Statewide | 4/20/2021 | 6/2/2023, 88 FR 36255 | This section is amended. This action addresses the following, or portions thereof, CAA elements: 110(a)(2)(A), (B), (C), (D)(i)(II)(Prevention of Significant Deterioration), D(ii), (E), (F), (G), (H), (J), (K), (L), and (M). |
Name of source | Permit No. | County | State submittal date | EPA approval date | Additional explanation/§ 52.2063 citation |
USX Corp./US Steel Group-Fairless Hills | 09-0006 | Bucks | 8/11/95, 11/15/95 | 4/9/96, 61 FR 15709 | 52.2036(b); 52.2037(c); source shutdown date is 8/1/91. |
General Glass-Jeannette | 65-0675 | Westmoreland | 7/5/95 | 05/16/96 61 FR 24727 | 52.2036(c); 52.2037(d). |
Sharon Steel Company | 43-0017 | Mercer | 12/8/95 | 12/20/96 61 FR 67275 | 52.2036(f); 52.2037(e). |
R. R. Donnelley and Sons Co.-Lancaster East Plant | 36-2027 | Lancaster | 9/20/95 | 07/21/97 62 FR 33891 | 52.2036(j). |
Rockwell Heavy Vehicle, Inc.-New Castle Forge Plant | 37-065 | Lawrence | 4/8/98 | 4/16/99, 64 FR 18818 | 52.2036(k); source shutdown date is 4/1/93. |
Pennsylvania Electric Co.-(PENELEC)-Williamsburg Station | 07-2006 | Blair | 8/1/95 | 12/20/96 61 FR 67275 | 52.2037(f); 52.2063(c)(113)(i)(A) & (ii)(A). |
Caparo Steel Company | 43-0285 | Mercer | 12/8/95 | 12/20/96 61 FR 67275 | 52.2037(g). |
Mercersburg Tanning Co. | 28-2008 | Franklin | 4/26/95 | 3/12/97, 62 FR 11079 | 52.2037(h); 52.2063(c)(114)(i)(A)(3) & (ii)(A). |
Duquesne Light Co.-Brunot Island Station | 214 | Allegheny | 3/5/01 | 10/18/01 66 FR 52867 | 52.2063(c)(161)(ii)(A). |
Duquesne Light Co.-Phillips Station | 212 | Allegheny | 4/15/99 | 10/18/01 66 FR 52867 | 52.2063(c)(161)(ii)(B). |
40 C.F.R. §52.2020
For FEDERAL REGISTER citations affecting § 52.2020 , see the List of CFR Sections Affected, which appears in the Finding Aids section of the printed volume and at www.govinfo.gov.