Table 1 to Paragraph (c)- EPA-Approved Georgia Regulations
State citation | Title/subject | State effective date | EPA approval date | Explanation |
391-3-1-.01 | Definitions | 7/29/2020 | 4/5/2022, 87 FR 19643 | Except the first paragraph, sections (a)-(nn), (pp)-(ccc), (eee)-(jjj), (nnn)-(bbbb), (dddd)-(kkkk), (mmmm), (rrrr)-(ssss), approved on 12/4/2018 with a state effective date of 7/20/2017; sections (ddd) and (cccc) approved on 2/2/1996 with a state effective date of 11/20/1994; (nnnn), approved on 1/5/2017 with a state effective date of 8/14/2016; and sections (oooo), (pppp), which are not in the SIP. |
391-3-1-.02 | Provisions | |||
391-3-1-.02(1) | General Requirements | 3/20/1979 | 9/18/1979, 44 FR 54047 | |
391-3-1-.02(2) | Emission Standards | |||
391-3-1-.02(2)(a) | General Provisions | 8/1/2013 | 7/28/2017, 82 FR 35106 | Except for paragraph 391-3-1-.02(2)(a)1. |
391-3-1-.02(2)(b) | Visible Emissions | 1/17/1979 | 9/18/1979, 44 FR 54047 | |
391-3-1-.02(2)(c) | Incinerators | 7/23/2018 | 11/22/2019, 84 FR 64427 | |
391-3-1-.02(2)(d) | Fuel-burning Equipment | 7/20/2005 | 2/9/2009, 75 FR 6309 | |
391-3-1-.02(2)(e) | Particulate Emission from Manufacturing Processes | 8/1/2013 | 7/28/2017, 82 FR 35106 | |
391-3-1-.02(2)(f) | Normal Superphosphate Manufacturing Facilities | 1/17/1979 | 9/18/1979, 44 FR 54047 | |
391-3-1-.02(2)(g) | Sulfur Dioxide | 7/17/2002 | 7/9/2003, 68 FR 40786 | |
391-3-1-.02(2)(h) | Portland Cement Plants | 1/17/1979 | 9/18/1979, 44 FR 54047 | |
391-3-1-.02(2)(i) | Nitric Acid Plants | 1/17/1979 | 9/18/1979, 44 FR 54047 | |
391-3-1-.02(2)(j) | Sulfuric Acid Plants | 1/17/1979 | 9/18/1979, 44 FR 54047 | |
391-3-1-.02(2)(k) | Particulate Emission from Asphaltic Concrete Hot Mix Plants | 1/17/1979 | 9/18/1979, 44 FR 54047 | |
391-3-1-.02(2)(n) | Fugitive Dust | 1/17/1979 | 9/18/1979, 44 FR 54047 | |
391-3-1-.02(2)(p) | Particulate Emissions from Kaolin and Fuller's Earth Processes | 8/1/2013 | 7/28/2017, 82 FR 35106 | |
391-3-1-.02(2)(q) | Particulate Emissions from Cotton Gins | 8/1/2013 | 7/28/2017, 82 FR 35106 | |
391-3-1-.02(2)(r) | Particulate Emissions from Granular and Mixed Fertilizer Manufacturing Units | 1/27/1972 | 5/31/1972, 37 FR 10842 | |
391-3-1-.02(2)(t) | VOC Emissions from Automobile and Light Duty Truck Manufacturing | 3/7/2012 | 9/28/2012, 77 FR 59554 | |
391-3-1-.02(2)(u) | VOC Emissions from Can Coating | 9/16/1992 | 9/28/2012, 77 FR 59554 | |
391-3-1-.02(2)(v) | VOC Emissions from Coil Coating | 9/16/1992 | 9/28/2012, 77 FR 59554 | |
391-3-1-.02(2)(w) | VOC Emissions from Paper Coating | 3/7/2012 | 9/28/2012, 77 FR 59554 | |
391-3-1-.02(2)(x) | VOC Emissions from Fabric and Vinyl Coating | 9/16/1992 | 9/28/2012, 77 FR 59554 | |
391-3-1-.02(2)(y) | VOC Emissions from Metal Furniture Coating | 3/7/2012 | 9/28/2012, 77 FR 59554 | |
391-3-1-.02(2)(z) | VOC Emissions from Large Appliance Surface Coating | 3/7/2012 | 9/28/2012, 77 FR 59554 | |
391-3-1-.02(2)(aa) | VOC Emissions from Wire Coating | 9/16/1992 | 9/28/2012, 77 FR 59554 | |
391-3-1-.02(2)(bb) | Petroleum Liquid Storage | 1/9/1991 | 10/13/1992, 57 FR 46780 | |
391-3-1-.02(2)(cc) | Bulk Gasoline Terminals | 1/9/1991 | 10/13/1992, 57 FR 46780 | |
391-3-1-.02(2)(dd) | Cutback Asphalt | 1/17/1979 | 9/18/1979, 44 FR 54047 | |
391-3-1-.02(2)(ee) | Petroleum Refinery | 1/9/1991 | 10/13/1992, 57 FR 46780 | |
391-3-1-.02(2)(ff) | Solvent Metal Cleaning | 5/29/1996 | 4/26/1999, 64 FR 20186 | |
391-3-1-.02(2)(gg) | Kraft Pulp Mills | 8/1/2013 | 7/28/2017, 82 FR 35106 | |
391-3-1-.02(2)(hh) | Petroleum Refinery Equipment Leaks | 6/24/1994 | 2/2/1996, 61 FR 3817 | |
391-3-1-.02(2)(ii) | VOC Emissions from Surface Coating of Miscellaneous Metal Parts and Products | 3/7/2012 | 9/28/2012, 77 FR 59554 | |
391-3-1-.02(2)(jj) | VOC Emissions from Surface Coating of Flat Wood Paneling | 3/7/2012 | 9/28/2012, 77 FR 59554 | |
391-3-1-.02(2)(kk) | VOC Emissions from Synthesized Pharmaceutical Manufacturing | 12/18/1980 | 11/24/1981, 46 FR 57486 | |
391-3-1-.02(2)(ll) | VOC Emissions from the Manufacture of Pneumatic Rubber Tires | 12/18/1980 | 11/24/1981, 46 FR 57486 | |
391-3-1-.02(2)(mm) | VOC Emissions from Graphic Arts Systems | 3/7/2012 | 9/28/2012, 77 FR 59554 | |
391-3-1-.02(2)(nn) | VOC Emissions from External Floating Roof Tanks | 12/18/1980 | 11/24/1981, 46 FR 57486 | |
391-3-1-.02(2)(oo) | Fiberglass Insulation Manufacturing Plants | 12/18/1980 | 11/24/1981, 46 FR 57486 | |
391-3-1-.02(2)(pp) | Bulk Gasoline Plants | 6/8/2008 | 9/28/2012, 77 FR 59554 | |
391-3-1-.02(2)(qq) | VOC Emissions from Large Petroleum Dry Cleaners | 4/3/1991 | 10/13/1992, 57 FR 46780 | |
391-3-1-.02(2)(rr) | Gasoline Dispensing Facility-Stage I | 10/25/2021 | 8/2/2023, 88 FR 50770 | Except for subparagraph 391-3-1-.02(2)(rr)16.(x), which was approved on 9/28/2012 with a state-effective date of 6/8/2008. |
391-3-1-.02(2)(ss) | Gasoline Transport Vehicles and Vapor Collection Systems | 09/17/2023 | 7/16/2024 89 FR 57737 | |
391-3-1-.02(2)(tt) | VOC Emissions from Major Sources | 6/8/2008 | 9/28/2012, 77 FR 59554 | |
391-3-1-.02(2)(uu) | Visibility Protection | 10/31/1985 | 1/28/1986, 51 FR 3466 | |
391-3-1-.02(2)(vv) | Volatile Organic Liquid Handling and Storage | 4/12/2009 | 9/28/2012, 77 FR 59554 | |
391-3-1-.02(2)(yy) | Emissions of Nitrogen Oxides from Major Sources | 4/12/2009 | 9/28/2012, 77 FR 59554 | |
391-3-1-.02(2)(ccc) | VOC Emissions from Bulk Mixing Tanks | 4/12/2009 | 9/28/2012, 77 FR 59554 | |
391-3-1-.02(2)(ddd) | VOC Emissions from Offset Lithography and Letterpress | 3/7/2012 | 9/28/2012, 77 FR 59554 | |
391-3-1-.02(2)(eee) | VOC Emissions from Expanded Polystyrene Products Manufacturing | 4/12/2009 | 9/28/2012, 77 FR 59554 | |
391-3-1-.02(2)(fff) | Particulate Matter Emissions from Yarn Spinning Operations | 6/15/1998 | 12/2/1999, 64 FR 67491 | |
391-3-1-.02(2)(hhh) | Wood Furniture Finishing and Cleaning Operations | 4/12/2009 | 9/28/2012, 77 FR 59554 | |
391-3-1-.02(2)(jjj) | NOX Emissions from Electric Utility Steam Generating Units | 3/12/2007 | 11/27/2009, 74 FR 62249 | |
391-3-1-.02(2)(kkk) | VOC Emissions from Aerospace Manufacturing and Rework Facilities | 2/17/2019 | 3/11/2020, 85 FR 14145 | |
391-3-1-.02(2)(lll) | NOX Emissions from Fuel-burning Equipment | 4/12/2009 | 9/28/2012, 77 FR 59554 | |
391-3-1-.02(2)(mmm) | NOX Emissions from Stationary Gas Turbines and Stationary Engines used to Generate Electricity | 5/4/2014 | 9/1/2015, 80 FR 52627 | |
391-3-1-.02(2)(nnn) | NOX Emissions from Large Stationary Gas Turbines | 4/20/2003 | 5/28/2019, 84 FR 24393 | |
391-3-1-.02(2)(rrr) | NOX Emissions from Small Fuel-Burning Equipment | 4/12/2009 | 9/28/2012, 77 FR 59554 | |
391-3-1-.02(2)(vvv) | VOC Emissions from Coating Miscellaneous Plastic Parts and Products | 3/7/2012 | 9/28/2012, 77 FR 59554 | |
391-3-1-.02(2)(yyy) | VOC Emissions from the Use of Miscellaneous Industrial Adhesives | 3/7/2012 | 9/28/2012, 77 FR 59554 | |
391-3-1-.02(2)(zzz) | VOC Emissions from Fiberglass Boat Manufacturing | 3/7/2012 | 9/28/2012, 77 FR 59554 | |
391-3-1-.02(2)(aaaa) | Industrial Cleaning Solvents | 3/7/2012 | 9/28/2012, 77 FR 59554 | |
391-3-1-.02(3) | Sampling | 6/15/1998 | 12/2/1999, 64 FR 67491 | |
391-3-1-.02(4) | Ambient Air Standards | 9/19/2022 | 2/6/2024, 89 FR 8078 | Except paragraphs (a), (c), (d), (e), (f), (g), and (h), approved on 12/4/2018 with a state effective date of 7/20/2017. |
391-3-1-.02(5) | Open Burning | 7/13/2006 | 5/28/2019, 84 FR 24393 | Except subparagraph 391-3-1-.02(5)(c), which was approved on July 10, 2001, with a state effective date of August 16, 2000. |
391-3-1-.02(6) | Source Monitoring | 8/1/2013 | 7/28/2017, 82 FR 35108 | Except paragraph (a)4., approved on 3/9/2022, with a state effective date of 10/25/2021. |
391-3-1-.02(7) | Prevention of Significant Deterioration of Air Quality (PSD) | 7/20/2017 | 9/16/2020, 85 FR 57707 | Except for the automatic rescission clause at 391-3-1-.02(7)(a)(2)(iv), which EPA disapproved on March 4, 2016. |
Except for portions of Rule 391-3-1-.02(7) incorporating by reference 40 CFR 52.21(b)(2)(v) , and 40 CFR 52.21(b)(3)(iii)(c) , because those CFR provisions were indefinitely stayed by the Fugitive Emissions Rule in the March 30, 2011 rulemaking and have not been approved into the Georgia SIP. | ||||
391-3-1-.02(11) | Compliance Assurance Monitoring | 6/15/1998 | 12/2/1999, 64 FR 67491 | |
391-3-1-.02(12) | Cross State Air Pollution Rule NOX Annual Trading Program | 7/23/2018 | 2/18/2020, 85 FR 8749 | |
391-3-1-.02(13) | Cross State Air Pollution Rule SO2 Annual Trading Program | 7/23/2018 | 2/18/2020, 85 FR 8749 | |
391-3-1-.02(14) | Cross State Air Pollution Rule NOX Ozone Season Trading Program | 7/23/2018 | 2/18/2020, 85 FR 8749 | |
391-3-1-.03 | Permits | |||
391-3-1-.03(1) | Construction (SIP) Permit | 8/17/1994 | 8/30/1995, 60 FR 45048 | |
391-3-1-.03(2) | Operating (SIP) Permit | 12/26/2001 | 7/11/2002, 67 FR 45909 | Except subparagraph (e), which is not approved into the SIP. |
391-3-1-.03(3) | Revocation, Suspension, Modification or Amendment of Permits | 2/23/1979 | 9/18/1979, 44 FR 54047 | |
391-3-1-.03(4) | Permits Not Transferable | 11/20/1975 | 8/20/1976, 41 FR 35184 | |
391-3-1-.03(5) | Permits Public Records | 10/28/1992 | 2/2/1996, 61 FR 3819 | |
391-3-1-.03(6) | Exemptions | 7/29/2020 | 4/5/2022, 87 FR 19643 | With the exception of Rule 391-3-1-.03(6)(b)16. |
391-3-1-.03(7) | Combined Permits and Applications | 2/23/1979 | 9/18/1979, 44 FR 54047 | |
391-3-1-.03(8) | Permit Requirements | 9/26/2019 | 9/16/2020, 85 FR 57694 | |
391-3-1-.03(11) | Permit by Rule | 7/23/2018 | 11/22/2019, 84 FR 64427 | Except sections (a)-(b)(5) and (b)(7)-(b)(10), approved on 2/9/2010 with a state effective date of 7/20/2005; section (b)(6), approved on 3/13/2000 with a state effective date of 12/25/1997; and the phrase "or enforceable as a practical matter" in section .03(11)(b)11.(i), which is not in the SIP. |
391-3-1-.03(12) | Generic Permit | 8/17/1994 | 8/30/1995, 60 FR 45048 | |
391-3-1-.03(13) | Emission Reduction Credits | 9/26/2019 | 9/22/2020, 85 FR 59436 | Except subparagraph 391-3-1-.03(13)(f), which was approved into the SIP with a state effective date of 7/18/2001, and subparagraphs (b), (c), (e), (g), and (i), which were approved into the SIP with a state effective date of 2/16/2000. |
391-3-1-.04 | Air Pollution Episodes | 11/20/1975 | 8/20/1976, 41 FR 35184 | |
391-3-1-.07 | Inspections and Investigations | 11/20/1975 | 8/20/1976, 41 FR 35184 | |
391-3-1-.08 | Confidentiality of Information | 11/20/1975 | 8/20/1976, 41 FR 35184 | |
391-3-1-.09 | Enforcement | 11/22/1992 | 2/2/1996, 61 FR 3819 | |
391-3-1-.10 | Continuance of Prior Rules | 11/22/1992 | 2/2/1996, 61 FR 3819 | |
391-3-1-.15 | Georgia Transportation Conformity and Consultation Interagency Rule | 10/6/2010 | 6/15/2012, 77 FR 35866 | |
391-3-20 | Enhanced Inspection and Maintenance | |||
391-3-20-.01 | Definitions | 3/21/2023 | 2/9/2024, 89 FR 8998 | |
391-3-20-.02 | Covered Counties | 1/9/2005 | 5/24/2007, 72 FR 29075 | |
391-3-20-.03 | Covered Vehicles; Exemptions | 3/21/2023 | 2/9/2024, 89 FR 8998 | |
391-3-20-.04 | Emission Inspection Procedures | 3/21/2023 | 2/9/2024, 89 FR 8998 | |
391-3-20-.05 | Emission Standards | 3/21/2023 | 2/9/2024, 89 FR 8998 | |
391-3-20-.06 | On-Road Testing of Exhaust Emissions by Remote Sensing Technology or Other Means | 2/17/2019 | 8/24/2020, 85 FR 52047 | |
391-3-20-.07 | Inspection Equipment System Specifications | 4/13/2021 | 9/22/2022, 87 FR 57834 | |
391-3-20-.08 | Quality Control and Equipment Calibration Procedures | 3/28/2018 | 8/24/2020, 85 FR 52047 | |
391-3-20-.09 | Inspection Station Requirements | 4/19/2022 | 2/9/2024, 89 FR 8998 | |
391-3-20-.10 | Certificates of Authorization | 4/19/2022 | 2/9/2024, 89 FR 8998 | |
391-3-20-.11 | Inspector Qualifications and Certification | 3/21/2023 | 2/9/2024, 89 FR 8998 | |
391-3-20-.12 | Schedules for Emission Inspections | 6/19/2014 | 4/10/2017, 82 FR 17128 | |
391-3-20-.13 | Certificate of Emission Inspection | 4/19/2022 | 2/9/2024, 89 FR 8998 | |
391-3-20-.15 | Repairs and Retests | 4/19/2022 | 2/9/2024, 89 FR 8998 | |
391-3-20-.16 | Extensions and Reciprocal Inspections | 6/19/2014 | 4/10/2017, 82 FR 17128 | |
391-3-20-.17 | Waivers | 4/19/2022 | 2/9/2024, 89 FR 8998 | |
391-3-20-.18 | Sale of Vehicles | 3/28/2018 | 8/24/2020, 85 FR 52047 | |
391-3-20-.19 | Management Contractor | 6/19/2014 | 4/10/2017, 82 FR 17128 | |
391-3-20-.20 | Referee Program | 3/28/2018 | 8/24/2020, 85 FR 52047 | |
391-3-20-.21 | Inspection Fees | 6/19/2014 | 4/10/2017, 82 FR 17128 | |
391-3-20-.22 | Enforcement | 4/19/2022 | 2/9/2024, 89 FR 8998 |
Table 2 to Paragraph (d)-EPA-Approved Georgia Source-Specific Requirements
Name of source | Permit No. | State effective date | EPA approval date | Comments |
Georgia Power Plant Bowen | EPD-AQC-180 | 11/17/1980 | 8/17/1981, 46 FR 41498 | |
Georgia Power Plant Harllee Branch | 4911-117-6716-0 | 4/23/1980 | 5/5/1981, 46 FR 25092 | |
ITT Rayonier, Inc. | 2631-151-7686-C | 11/4/1980 | 8/14/1981, 46 FR 41050 | |
Georgia Power Plant Bowen | EPD-AQC-163 | 5/16/1979 | 1/3/1980, 45 FR 781 | |
Union Camp | 2631-025-7379-0 | 12/18/1981 | 4/13/1982, 47 FR 15794 | |
Blue Bird Body Company | 3713-111-8601 | 1/27/1984 | 1/7/1985, 50 FR 765 | |
Plant McDonough | 4911-033-5037-0 conditions 10 through 22 | 12/27/1995 | 3/18/1999, 64 FR 13348 | |
Plant Yates | 4911-038-4838-0 conditions 19 through 32 | 12/27/1995 | 3/18/1999, 64 FR 13348 | |
Plant Yates | 4911-038-4839-0 conditions 16 through 29 | 12/27/1995 | 3/18/1999, 64 FR 13348 | |
Plant Yates | 4911-038-4840-0 conditions 16 through 29 | 12/27/1995 | 3/18/1999, 64 FR 13348 | |
Plant Yates | 4911-038-4841-0 conditions 16 through 29 | 12/27/1995 | 3/18/1999, 64 FR 13348 | |
Plant Atkinson | 4911-033-1319-0 conditions 8 through 13 | 11/15/1994 | 3/18/1999, 64 FR 13348 | |
Plant Atkinson | 4911-033-1320-0 conditions 8 through 13 | 11/15/1994 | 3/18/1999, 64 FR 13348 | |
Plant Atkinson | 4911-033-1321-0 conditions 8 through 13 | 11/15/1994 | 3/18/1999, 64 FR 13348 | |
Plant Atkinson | 4911-033-1322-0 conditions 8 through 13 | 11/15/1994 | 3/18/1999, 64 FR 13348 | |
Plant Atkinson | 4911-033-6949 conditions 5 through 10 | 11/15/1994 | 3/18/1999, 64 FR 13348 | |
Plant McDonough | 4911-033-6951 conditions 5 through 10 | 11/15/1994 | 3/18/1999, 64 FR 13348 | |
Atlanta Gas Light Company | 4922-028-10902 conditions 20 and 21 | 11/15/1994 | 3/18/1999, 64 FR 13348 | |
Atlanta Gas Light Company | 4922-031-10912 conditions 27 and 28 | 11/15/1994 | 3/18/1999, 64 FR 13348 | |
Austell Box Board Corporation | 2631-033-11436 conditions 1 through 5 | 11/15/1994 | 3/18/1999, 64 FR 13348 | |
Emory University | 8922-044-10094 conditions 19 through 26 | 11/15/1994 | 3/18/1999, 64 FR 13348 | |
General Motors Corporation | 3711-044-11453 conditions 1 through 6 and Attachment A | 11/15/1994 | 3/18/1999, 64 FR 13348 | |
Georgia Proteins Company | 2077-058-11226 conditions 16 through 23 and Attachment A | 11/15/1994 | 3/18/1999, 64 FR 13348 | |
Owens-Brockway Glass Container, Inc | 3221-060-10576 conditions 26 through 28 and Attachment A | 11/15/1994 | 3/18/1999, 64 FR 13348 | |
Owens-Corning Fiberglass Corporation | 3296-060-10079 conditions 25 through 29 | 11/15/1994 | 3/18/1999, 64 FR 13348 |
EPA-Approved Georgia Non-Regulatory Provisions
Name of nonregulatory SIP provision | Applicable geographic or nonattainment area | State submittal date/effective date | EPA approval date | Explanation |
High Occupancy Vehicle (HOV) lane on I-85 from Chamblee-Tucker Road to State Road 316. High Occupancy Toll (HOT) lane on I-85 from Chamblee-Tucker Road to State Road 316 | Atlanta Metropolitan Area | 11/15/1993 and amended on 6/17/1996 and 2/5/2010 | 3/18/1999, 4/26/1999 and 11/5/2009. | |
Clean Fuel Vehicles Revolving Loan Program | Atlanta Metropolitan Area | 6/17/1996 | 4/26/1999. | |
Regional Commute Options Program and HOV Marketing Program | Atlanta Metropolitan Area | 6/17/1996 | 4/26/1999. | |
HOV lanes on I-75 and I-85 | Atlanta Metropolitan Area | 6/17/1996 | 4/26/1999. | |
Two Park and Ride Lots: Rockdale County-Sigman at I-20 and Douglas County-Chapel Hill at I-20 | Atlanta Metropolitan Area | 6/17/1996 | 4/26/1999. | |
MARTA Express Bus routes (15 buses) | Atlanta Metropolitan Area | 6/17/1996 | 4/26/1999. | |
Signal preemption for MARTA routes #15 and #23 | Atlanta Metropolitan Area | 6/17/1996 | 4/26/1999. | |
Improve and expand service on MARTA's existing routes in southeast DeKalb County | Atlanta Metropolitan Area | 6/17/1996 | 4/26/1999. | |
Acquisition of clean fuel buses for MARTA and Cobb County Transit | Atlanta Metropolitan Area | 6/17/1996 | 4/26/1999. | |
ATMS/Incident Management Program on I-75/I-85 inside I-285 and northern ARC of I-285 between I-75 and I-85 | Atlanta Metropolitan Area | 6/17/1996 | 4/26/1999. | |
Upgrading, coordination and computerizing intersections | Atlanta Metropolitan Area | 6/17/1996 | 4/26/1999. | |
[Reserved] | ||||
Atlantic Steel Transportation Control Measure | Atlanta Metropolitan Area | 3/29/2000 | 8/28/2000. | |
Procedures for Testing and Monitoring Sources of Air Pollutants | Atlanta Metropolitan Area | 7/31/2000 | 7/10/2001. | |
Enhanced Inspection/Maintenance Test Equipment, Procedures and Specifications | Atlanta Metropolitan Area | 9/20/2000 | 7/10/2001. | |
Preemption Waiver Request for Low-RVP, Low-Sulfur Gasoline Under Air Quality Control Rule 391-3-1-.02(2)(bbb) | Atlanta Metropolitan Area | 5/31/2000 | 2/22/2002. | |
Technical Amendment to the Georgia Fuel Waiver Request of May 31, 2000 | Atlanta Metropolitan Area | 11/9/2001 | 2/22/2002. | |
Georgia's State Implementation Plan for the Atlanta Ozone Nonattainment Area | Atlanta Metropolitan Area | 7/17/2001 | 5/7/2002. | |
Post-1999 Rate of Progress Plan | Atlanta Metropolitan Area | 12/24/2003 | 7/19/2004, 69 FR 42884. | |
Severe Area Vehicle Miles Traveled (VMT SIP) for the Atlanta 1-hour severe ozone nonattainment area | Atlanta 1-hour ozone severe nonattainment area | 6/30/2004 | 6/14/2005, 70 FR 34358. | |
Atlanta 1-hour ozone attainment area 2015 maintenance plan | Atlanta severe 1-hour ozone maintenance area | 2/1/2005 | 6/14/2005, 70 FR 34660. | |
Attainment Demonstration for the Chattanooga Early Action Area | Walker and Catoosa Counties | 12/31/2004 | 8/26/2005, 70 FR 50199. | |
Attainment Demonstration for the Lower Savannah-Augusta Early Action Compact Area | Columbia and Richmond Counties | 12/31/04 | 8/26/05, 70 FR 50195. | |
Alternative Fuel Refueling Station/Park and Ride Transportation Center, Project DO-AR-211 is removed | Douglas County, GA | 9/19/2006 | 11/28/2006, 71 FR 68743. | |
Macon 8-hour Ozone Maintenance Plan | Macon, GA encompassing a portion of Monroe County | 6/15/2007 | 9/19/2007, 72 FR 53432. | |
Murray County 8-hour Ozone Maintenance Plan | Murray County | 6/15/2007 | 10/16/2007, 72 FR 58538. | |
Atlanta Early Progress Plan | Barrow, Bartow, Carroll, Cherokee, Clayton, Cobb, Coweta, DeKalb, Douglas, Fayette, Forsyth, Fulton, Gwinnett, Hall, Henry, Newton, Paulding, Rockdale, Spalding and Walton counties | 1/12/2007 | 2/20/2008, 73 FR 9206. | |
Rome; 1997 Fine Particulate Matter 2002 Base Year Emissions Inventory | Floyd County | 10/27/2009 | 1/12/12, 77 FR 1873. | |
Chattanooga; Fine Particulate Matter 2002 Base Year Emissions Inventory | Catoosa and Walker Counties | 10/27/09 | 2/8/12; 77 FR 6467. | |
110(a)(1) and (2) Infrastructure Requirements for the 1997 8-Hour Ozone National Ambient Air Quality Standards | Georgia | 10/13/2007 | 2/6/2012, 77 FR 5706. | |
Atlanta 1997 Fine Particulate Matter 2002 Base Year Emissions Inventory | Barrow, Bartow, Carroll, Cherokee, Clayton, Cobb, Coweta, DeKalb, Douglas, Fayette, Forsyth, Fulton, Gwinnett, Hall, Henry, Newton, Paulding, Rockdale, Spalding and Walton Counties in their entireties and portions of Heard and Putnam Counties | 7/6/2010 | 3/1/2012, 77 FR 12487. | |
Macon 1997 Fine Particulate Matter 2002 Base Year Emissions Inventory | Bibb County and Monroe County | 8/17/2009 | 3/2/2012, 77 FR 12724. | |
Atlanta 1997 8-Hour Ozone 2002 Base-Year Emissions Inventory | Barrow, Bartow, Carroll, Cherokee, Clayton, Cobb, Coweta, DeKalb, Douglas, Fayette, Forsyth, Fulton, Gwinnett, Hall, Henry, Newton, Paulding, Rockdale, Spalding and Walton Counties in their entireties | 10/21/2009 | 4/24/2012, 77 FR 24399. | |
Regional Haze Plan | Statewide | 2/11/10 | 6/28/12, 77 FR 38501. | |
Regional Haze Plan Supplement (including BART and Reasonable Progress emissions limits) | Statewide | 11/19/10 | 6/28/12, 77 FR 38501. | |
110(a)(1) and (2) Infrastructure Requirements for 1997 Fine Particulate Matter National Ambient Air Quality Standards | Georgia | 7/23/2008 | 10/25/2012, 77 FR 65125 | With the exception of 110(a)(2)(D)(i). |
110(a)(1) and (2) Infrastructure Requirements for 2006 Fine Particulate Matter National Ambient Air Quality Standards | Georgia | 10/21/2009 | 10/25/2012, 77 FR 65125 | With the exception of 110(a)(2)(D)(i). |
Negative Declaration for Control of VOC Emissions from Reactor Processes and Distillation Operations in Synthetic Organic Chemical Manufacturing Industry (SOCMI) EPA-450/4-91-031, August 1993 | Atlanta 1997 8-Hour Ozone Nonattainment Area | 10/21/2009 | 9/28/2013. | |
Negative Declaration for Control of VOC Emissions from Equipment Leaks from Natural Gas/Gasoline Processing Plants EPA-450/3-83-007, December 1983 | Atlanta 1997 8-Hour Ozone Nonattainment Area | 10/21/2009 | 9/28/2013. | |
Negative Declaration for Control of VOC Leaks from Synthetic Organic Chemical Polymer and Resin Manufacturing Equipment EPA-450/3-83-006, March 1984 | Atlanta 1997 8-Hour Ozone Nonattainment Area | 10/21/2009 | 9/28/2013. | |
Negative Declaration for Control of VOC Emissions from Air Oxidation Processes in Synthetic Organic Chemical Manufacturing Industry (SOCMI), EPA-450/3-84-015, December 1984 | Atlanta 1997 8-Hour Ozone Nonattainment Area | 10/21/2009 | 9/28/2013. | |
110(a)(1) and (2) Infrastructure Requirements for 1997 Fine Particulate Matter National Ambient Air Quality Standards | Georgia | 7/23/2008 | 4/12/2013 | Addressing element 110(a)(2)(D)(i)(II) prong 3 only. |
110(a)(1) and (2) Infrastructure Requirements for 2006 Fine Particulate Matter National Ambient Air Quality Standards | 110(a)(1) and (2) Infrastructure Requirements for 1997 Fine Particulate Matter National Ambient Air Quality Standards | 10/21/2009 | 4/12/2013 | Addressing element 110(a)(2)(D)(i)(II) prong 3 only. |
1997 8-Hour Ozone Reasonable Further Progress Plan for the Atlanta Area | Atlanta 1997 8-Hour Ozone Nonattainment Area | 10/21/2009 | 11/4/2013. | |
1997 8-hour ozone Maintenance Plan for the Atlanta Area | Atlanta 1997 8-Hour Ozone Nonattainment Area | 4/4/2012 | 12/2/2013 | |
110(a)(1) and (2) Infrastructure Requirements for 1997 Fine Particulate Matter National Ambient Air Quality Standards | Georgia | 7/23/2008 | 5/7/2014, 79 FR 26143 | Addressing prong 4 of section 110(a)(2)(D)(i) only. |
110(a)(1) and (2) Infrastructure Requirements for 2006 Fine Particulate Matter National Ambient Air Quality Standards | Georgia | 10/21/2009 | 5/7/2014, 79 FR 26143 | Addressing prong 4 of section 110(a)(2)(D)(i) only. |
1997 Annual PM2.5 Maintenance Plan for the Macon Area | Bibb County and a portion of Monroe County, Macon, Georgia Nonattainment Area | 6/21/12 | 5/13/14, 79 FR 27193 | |
1997 Annual PM2.5 Maintenance Plan for the Rome Area | Floyd County, Rome, Georgia Area | 6/21/12 | 5/14/2014, 79 FR 27496 | |
1997 Annual PM2.5Maintenance Plan for the Georgia portion of the Chattanooga TN-GA-AL Area | Catoosa and Walker Counties | 9/14/2012 | 12/19/2014, 79 FR 75748 | |
110(a)(1) and (2) Infrastructure Requirements for the 2008 Lead NAAQS | Georgia | 5/14/2012 | 3/18/2015, 80 FR 14019 | Addressing the PSD permitting requirements of sections 110(a)(2)(C), 110(a)(2)(D)(i)(II) (prong 3) and 110(a)(2)(J) only. |
110(a)(1) and (2) Infrastructure Requirements for the 2008 Ozone NAAQS | Georgia | 3/6/2012 | 3/18/2015, 80 FR 14019 | Addressing the PSD permitting requirements of sections 110(a)(2)(C), 110(a)(2)(D)(i)(II) (prong 3) and 110(a)(2)(J) only. |
110(a)(1) and (2) Infrastructure Requirements for the 2010 NO2 NAAQS | Georgia | 3/25/2013 | 3/18/2015, 80 FR 14019 | Addressing the PSD permitting requirements of sections 110(a)(2)(C), 110(a)(2)(D)(i)(II) (prong 3) and 110(a)(2)(J) only. |
Offset measures associated with the repeal of Georgia Rules 391-3-1-.02(2)(aaa) and 391-3-1-.02(2)(bbb) and the revision to Georgia Rule 391-3-1-.02(2)(mmm) | Banks, Barrow, Bartow, Butts, Carroll, Chattooga, Cherokee, Clarke, Clayton, Cobb, Coweta, Dawson, DeKalb, Douglas, Fayette, Floyd, Forsyth, Fulton, Gordon, Gwinnett, Hall, Haralson, Heard, Henry, Jackson, Jasper, Jones, Lamar, Lumpkin, Madison, Meriwether, Monroe, Morgan, Newton, Oconee, Paulding, Pickens, Pike, Polk, Putnam, Rockdale, Spalding, Troup, Walton and Upson | 5/4/2014 | 9/1/2015, 80 FR 52627 | Includes the contingency offset measure in the event that the locomotive conversion program cannot be fully completed. |
Atlanta 2008 8-hour Ozone Marginal Area Requirements | Bartow, Cherokee, Clayton, Cobb, Coweta, DeKalb, Douglas, Fayette, Forsyth, Fulton, Gwinnett, Henry, Newton, Paulding, and Rockdale Counties | 2/6/2015 | 8/11/2015, 80 FR 48041 | |
110(a)(1) and (2) Infrastructure Requirements for the 2008 Lead National Ambient Air Quality Standards | Georgia | 3/6/2012 | 10/5/2015 | With the exception of provisions pertaining to PSD permitting requirements in sections 110(a)(2)(C), 110(a)(2)(D)(i)(II) (prong 3) and 110(a)(2)(J) only. |
110(a)(1) and (2) Infrastructure Requirements for the 2008 8-Hour Ozone National Ambient Air Quality Standards | Georgia | 5/14/2012 | 10/9/2015, 80 FR 61109 | With the exception of sections: 110(a)(2)(C), (D)(i)(II) prong 3 and (J) concerning PSD permitting requirements and 110(a)(2)(D)(i)(I) and (II) (prongs 1, 2, and 4) concerning interstate transport requirements. |
1997 Annual PM2.5 Maintenance Plan for the Atlanta Area | Barrow, Bartow, Carroll, Cherokee, Clayton, Cobb, Coweta, DeKalb, Douglas, Fayette, Forsyth, Fulton, Gwinnett, Hall, Henry, Newton, Paulding, Rockdale, Spalding and Walton Counties in their entireties and portions of Heard and Putnam Counties | 8/30/2012 | 2/24/2016, 81 FR 9114 | |
110(a)(1) and (2) Infrastructure Requirements for the 2010 1-hour SO2 National Ambient Air Quality Standard | Georgia | 10/22/2013 | 4/28/2016, 81 FR 25355 | With the exception of interstate transport requirements of section 110(a)(2)(D)(i)(I) and (II) (prongs 1, 2, and 4). |
110(a)(1) and (2) Infrastructure Requirements for the 2010 1-hour NO2 NAASQ | Georgia | 3/25/2013 | 9/14/2016 | With the exception of sections 110(a)(2)(C), prong 3 of D(i), and (J) and sections 110(a)(2)(D)(i)(I) and (II) (prongs 1, 2, and 4). |
110(a)(1) and (2) Infrastructure Requirements for the 2012 Annual PM2.5 NAAQS | Georgia | 12/14/2015 | 11/21/2016, 81 FR 83154 | With the exception of sections 110(a)(2)(D)(i)(I) and (II) (prongs 1, 2 and 4). |
2008 8-hour ozone NAAQS Nonattainment New Source Review Requirements for the Atlanta Area | Bartow, Cherokee, Clayton, Cobb, Coweta, DeKalb, Douglas, Fayette, Forsyth, Fulton, Gwinnett, Henry, Newton, Paulding, and Rockdale Counties | 2/6/2015 | 3/22/2017, 82 FR 14611 | |
2008 8-hour ozone Maintenance Plan for the Atlanta Area | Bartow, Cherokee, Clayton, Cobb, Coweta, DeKalb, Douglas, Fayette, Forsyth, Fulton, Gwinnett, Henry, Newton, Paulding and Rockdale Counties | 7/18/2016 | 6/2/2017, 82 FR 25523 | |
January 2014 Regional Haze Progress Report | Georgia | 1/8/2014 | 10/4/2017, 82 FR 46136 | |
110(a)(1) and (2) Infrastructure Requirements for the 2010 1-hour NO2 NAAQS | Georgia | 3/25/2013 | 5/4/2018, 83 FR 19637 | Addressing Prong 4 only. |
110(a)(1) and (2) Infrastructure Requirements for the 2010 1-hour SO2 NAAQS | Georgia | 7/25/2014 | 5/4/2018, 83 FR 19637 | Addressing Prong 4 only. |
110(a)(1) and (2) Infrastructure Requirements for the 2012 Annual PM2.5 NAAQS | Georgia | 12/14/2015 | 5/4/2018, 83 FR 19637 | Addressing Prong 4 only. |
110(a)(1) and (2) Infrastructure Requirements for the 2008 8-hour Ozone NAAQS | Georgia | 5/14/2012 | 5/4/2018, 83 FR 19637 | Addressing Prong 4 only. |
Regional Haze Plan Revision | Georgia | 7/26/2017 | 5/4/2018, 83 FR 19637 | |
110(a)(1) and (2) Infrastructure Requirements for the 2012 Annual PM2.5 NAAQS | Georgia | 12/14/2015 | 9/25/2018, 83 FR 48387 | Addressing Prongs 1 and 2 of section 110(a)(2)(D)(i)(I) only. |
Non-Interference Demonstration and Maintenance Plan Revision for Federal Low-Reid Vapor Pressure Requirement in the Atlanta Area | Cherokee, Clayton, Cobb, Coweta, DeKalb, Douglas, Fayette, Forsyth, Fulton, Gwinnett, Henry, Paulding, and Rockdale counties | 8/15/2018 | 4/23/2019, 84 FR 16786 | |
110(a)(1) and (2) Infrastructure Requirements for the 2010 1-hour NO2 NAAQS | Georgia | 7/24/2018 | 5/17/2019, 84 FR 22374 | Addressing Prongs 1 and 2 of section 110(a)(2)(D)(i) only. |
110(a)(1) and (2) Infrastructure Requirements for the 2008 8-Hour Ozone NAAQS | Georgia | 8/15/2018 | 9/26/2019, 84 FR 50758 | Addressing prongs 1 and 2 of section 110(a)(2)(D)(i)(I) only. |
110(a)(1) and (2) Infrastructure Requirements for the 2015 8-Hour Ozone NAAQS | Georgia | 9/24/2018 | 3/11/2020, 85 FR 14147 | With the exception of 110(a)(2)(D)(i)(I) (prongs 1 and 2) and PSD provisions related to major sources under sections 110(a)(2)(C), 110(a)(2)(D)(i)(II) (prong 3), and 110(a)(2)(J). |
110(a)(1) and (2) Infrastructure Requirements for the 2010 1-hour SO2 NAAQS | Georgia | 1/9/2019 | 6/23/2020, 85 FR 37565 | Addressing Prongs 1 and 2 of section 110(a)(2)(D)(i) only. |
2008 8-hour ozone Maintenance Plan for the Atlanta Area, Revision for the Removal of Transportation Control Measures | Bartow, Cherokee, Clayton, Cobb, Coweta, DeKalb, Douglas, Fayette, Forsyth, Fulton, Gwinnett, Henry, Newton, Paulding, and Rockdale Counties | 9/16/2019 | 3/8/2021, 86 FR 13191 | |
2015 8-hour Ozone NAAQS Nonattainment New Source Review Requirements for the Atlanta Area | Bartow, Clayton, Cobb, DeKalb, Fulton, Gwinnett, and Henry Counties | 7/2/2020 | 1/25/2022, 87 FR 3677 | |
110(a)(1) and (2) Infrastructure Requirements for the 2015 8-Hour Ozone NAAQS | Georgia | 9/24/2018 | 12/2/2021, 86 FR 68413 | Addressing Prongs 1 and 2 of section 110(a)(2)(D)(i)(I) only. |
Atlanta Area Base Year Emissions Inventory for the 2015 Ozone NAAQS | Bartow, Clayton, Cobb, Dekalb, Fulton, Gwinnett, and Henry Counties | 7/2/2020 | 3/9/2022, 87 FR 13179 | |
110(a)(1) and (2) Infrastructure Requirements for the 2015 8-Hour Ozone NAAQS | Georgia | 9/1/2020 | 5/9/2022, 87 FR 27519 | Addressing the PSD provisions related to major sources under sections 110(a)(2)(C), 110(a)(2)(D)(i)(II) (prong 3), and 110(a)(2)(J) only. |
2015 8-hour Ozone Maintenance Plan for the Atlanta Area | Bartow, Clayton, Cobb, DeKalb, Fulton, Gwinnett, and Henry Counties | 2/28/2022 | 10/17/2022, 87 FR 62733 | |
1997 8-hour Ozone 2nd Maintenance Plan (Limited Maintenance Plan) for the Atlanta Area | Barrow, Bartow, Carroll, Cherokee, Clayton, Cobb, Coweta, DeKalb, Douglas, Fayette, Forsyth, Fulton, Gwinnett, Hall, Henry, Newton, Paulding, Rockdale, Spalding, and Walton Counties | 12/17/2021 | 2/7/2023, 88 FR 7883 | |
1997 8-hour Ozone 2nd Maintenance Plan (Limited Maintenance Plan) for the Murray County Area | Murray County Area | 10/20/2021 | 2/7/2023, 88 FR 7888 | |
1997 8-hour Ozone 2nd Maintenance Plan (Limited Maintenance Plan) for the Macon Area | Bibb County and a portion of Monroe County | 10/20/2021 | 3/8/2023, 88 FR 14278 |
40 C.F.R. §52.570
For FEDERAL REGISTER citations affecting §52.570, see the List of CFR Sections Affected, which appears in the Finding Aids section of the printed volume and at www.govinfo.gov.