- EPA-Approved Florida Laws and Regulations
State citation (section) | Title/subject | State effective date | EPA approval date | Explanation |
Chapter 62-204 Air Pollution Control-General Provisions | ||||
62-204.320 | Procedures for Designation and Redesignation of Areas | 3/13/1996 | 6/16/1999, 64 FR 32346 | |
62-204.340 | Designation of Attainment, Nonattainment, and Maintenance Areas | 3/13/1996 | 6/16/1999, 64 FR 32346 | |
62-204.360 | Designation of Prevention of Significant Deterioration Areas | 3/13/1996 | 6/16/1999, 64 FR 32346 | |
62-204.500 | Conformity | 10/23/2016 | 3/28/2024, 89 FR 21439 | Except for paragraphs 62-204.500(1)(a), (1)(b), (1)(c), and (1)(d). |
Chapter 62-210 Stationary Sources - General Requirements | ||||
62-210.200 | Definitions | 10/23/2013 | 9/16/2020, 85 FR 57707 | The ethanol production facility exclusion within the definition of "major stationary source" at 62-210.200 does not apply to 62-212.500. Except the following definitions: "animal crematory"; "biological waste"; "biological waste incinerator"; "biomedical waste"; "capture efficiency"; "cast polymer operation"; "human crematory"; "major source of air pollution," "major source," or "title V source"; "printed interior panels"; "unit-specific applicable requirement"; and "waste-to-energy facility". |
62-210.220 | Small Business Assistance Program | 10/6/2008 | 7/3/2017, 82 FR 30767 | |
62-210.300 | Permits Required | 5/9/2007 | 6/1/2009, 63 FR 26103 | |
62-210.310 | Air General Permits | 6/29/2011 | 10/6/2017, 82 FR 46682 | |
62-210.350 | Public Notice and Comment | 10/12/2008 | 7/29/2020, 85 FR 45539 | Except for 62-210.350(1)(c). |
62-210.360 | Administrative Permit Corrections | 11/23/1994 | 6/16/1999, 64 FR 32346 | |
62-210.370 | Emissions Computation and Reporting | 2/2/2006 | 6/27/2008, 73 FR 36435 | |
62-210.550 | Stack Height Policy | 11/23/1994 | 6/16/1999, 64 FR 32346 | |
62-210.650 | Circumvention | 10/15/1992 | 10/20/1994, 59 FR 52916 | |
62-210.700 | Excess Emissions | 10/23/2016 | 8/4/2023, 88 FR 51709 | |
62-210.900 | Forms and Instructions | 2/9/1993 | 11/7/1994, 59 FR 46157 | |
Chapter 62-212 Stationary Sources - Preconstruction Review | ||||
62-212.300 | General Preconstruction Review Requirements | 6/29/2009 | 4/12/2011, 76 FR 20239 | |
62-212.400 | Prevention of Significant Deterioration | 3/28/2012 | 9/16/2020, 85 FR 57707 | Except the provisions for the PM2.5 significant impact levels at (5)(b). |
62-212.500 | Preconstruction Review for Nonattainment Areas | 2/2/2006 | 6/27/2008, 73 FR 36435 | The ethanol production facility exclusion within the definition of "major stationary source" at 62-210.200 does not apply to 62-212.500. |
62-212.720 | Actuals Plantwide Applicability Limits (PALs) | 12/17/2013 | 7/3/2017, 82 FR 30767 | |
Chapter 62-252 Gasoline Vapor Control | ||||
62-252.300 | Gasoline Dispensing Facilities Stage I Vapor Recovery | 5/1/2015 | 8/12/2015, 80 FR 48259 | |
Chapter 62-256 Open Burning and Frost Protection Fires | ||||
62-256.100 | Declaration and Intent | 12/9/1975 | 11/1/1977, 42 FR 57124 | |
62-256.200 | Definitions | 11/30/1994 | 6/16/1999, 64 FR 32346 | |
62-256.300 | Prohibitions | 11/30/1994 | 6/16/1999, 64 FR 32346 | |
62-256.400 | Agricultural and Silvicultural Fires | 7/1/1971 | 5/31/1972, 37 FR 10842 | |
62-256.450 | Burning for Cold or Frost Protection | 6/27/1991 | 9/9/1994, 59 FR 46552 | |
62-256.500 | Land Clearing | 11/30/1994 | 6/16/1999, 64 FR 32346 | |
62-256.600 | Industrial, Commercial, Municipal, and Research Open Burning | 7/1/1971 | 5/31/1972, 37 FR 10842 | |
62-256.700 | Open Burning Allowed | 11/30/1994 | 6/16/1999, 64 FR 32346 | |
62-256.800 | Effective Date | 7/1/1971 | 5/31/1972, 37 FR 10842 | |
Chapter 62-296 Stationary Sources - Emission Standards | ||||
62-296.100 | Purpose and Scope | 10/6/2008 | 10/6/2017, 82 FR 46682 | |
62-296.320 | General Pollutant Emission Limiting Standards | 7/10/2014 | 1/22/2024, 89 FR 3888 | Except 62-296.320(1), (2), and (3), approved on 6/16/1999, state effective 3/13/1996. |
62-296.340 | Best Available Retrofit Technology | 1/31/2007 | 8/29/2013, 78 FR 53250 | |
62-296.401 | Incinerators | 3/13/1996 | 6/16/1999, 64 FR 32346 | |
62-296.402 | Sulfuric Acid Plants | 6/23/2022 | 8/4/2023, 88 FR 51709 | Except for paragraphs (1), (2)(a)2., (2)(b)2., and (3)(b). |
62-296.403 | Phosphate Processing | 3/13/1996 | 6/16/1999, 64 FR 32346 | |
62-296.404 | Kraft (Sulfate) Pulp Mills and Tall Oil Plants | 3/13/1996 | 6/16/1999, 64 FR 32346 | |
62-296.405 | Existing Fossil Fuel Steam Generators with Greater than or Equal to 250 Million Btu Per Hour Heat Input | 6/23/2022 | 8/4/2023, 88 FR 51709 | Except for paragraphs (4)(a)2. through 5., (4)(a)8. and 9., (4)(b)1. and 2., (4)(b)4., and (5)(c). |
62-296.406 | Fossil Fuel Steam Generators with Less Than 250 million Btu per Hour Heat Input | 11/5/2020 | 1/22/2024, 89 FR 3888 | |
62-296.408 | Nitric Acid Plants | 11/23/1994 | 8/4/2023, 88 FR 51709 | Except for paragraph (2). |
62-296.409 | Sulfur Recovery Plants | 11/23/1994 | 6/16/1999, 64 FR 32346 | |
62-296.410 | Carbonaceous Fuel Burning Equipment | 11/23/1994 | 6/16/1999, 64 FR 32346 | |
62-296.412 | Dry Cleaning Facilities | 3/11/2010 | 10/6/2017, 82 FR 46682 | |
62-296.414 | Concrete Batching Plants | 11/5/2020 | 11/6/2023, 88 FR 76138 | |
62-296.415 | Soil Thermal Treatment Facilities | 11/5/2020 | 11/6/2023, 88 FR 76138 | |
62-296.418 | Bulk Gasoline Plants | 8/14/2019 | 11/6/2023, 88 FR 76138 | |
62-296.500 | Reasonably Available Control Technology (RACT)-Volatile Organic Compounds (VOC) and Nitrogen Oxides (NO X ) Emitting Facilities | 8/14/2019 | 11/6/2023, 88 FR 76138 | |
62-296.501 | Can Coating | 7/10/2014 | 11/6/2023, 88 FR 76138 | |
62-296.502 | Coil Coating | 7/10/2014 | 11/6/2023, 88 FR 76138 | |
62-296.503 | Paper Coating | 7/10/2014 | 11/6/2023, 88 FR 76138 | |
62-296.504 | Fabric and Vinyl Coating | 7/10/2014 | 11/6/2023, 88 FR 76138 | |
62-296.505 | Metal Furniture Coating | 7/10/2014 | 11/6/2023, 88 FR 76138 | |
62-296.506 | Surface Coating of Large Appliances | 7/10/2014 | 11/6/2023, 88 FR 76138 | |
62-296.507 | Magnet Wire Coating | 7/10/2014 | 11/6/2023, 88 FR 76138 | |
62-296.508 | Petroleum Liquid Storage | 7/10/2014 | 11/6/2023, 88 FR 76138 | |
62-296.510 | Bulk Gasoline Terminals | 7/10/2014 | 11/6/2023, 88 FR 76138 | |
62-296.511 | Solvent Metal Cleaning | 11/5/2020 | 11/6/2023, 88 FR 76138 | |
62-296.512 | Cutback Asphalt | 8/14/2019 | 11/6/2023, 88 FR 76138 | |
62-296.513 | Surface Coating of Miscellaneous Metal Parts and Products | 6/16/2022 | 9/27/2024, 89 FR 79150 | |
62-296.514 | Surface Coating of Flat Wood Paneling | 7/10/2014 | 11/6/2023, 88 FR 76138 | |
62-296.515 | Graphic Arts Systems | 7/10/2014 | 11/6/2023, 88 FR 76138 | |
62-296.516 | Petroleum Liquid Storage Tanks with External Floating Roofs | 7/10/2014 | 11/6/2023, 88 FR 76138 | |
62-296.600 | Reasonably Available Control Technology (RACT) - Lead | 3/13/1996 | 6/16/1999, 64 FR 32346 | |
62-296.601 | Lead Processing Operations in General | 8/8/1994 | 9/18/1996, 61 FR 49064 | |
62-296.602 | Primary Lead-Acid Battery Manufacturing Operations | 7/10/2014 | 1/22/2024, 89 FR 3888 | |
62-296.603 | Secondary Lead Smelting Operations | 7/10/2014 | 1/22/2024, 89 FR 3888 | |
62-296.604 | Electric Arc Furnace Equipped Secondary Steel Manufacturing Operations | 7/10/2014 | 1/22/2024, 89 FR 3888 | |
62-296.605 | Lead Oxide Handling Operations | 8/8/1994 | 9/18/1996, 61 FR 49064 | |
62-296.700 | Reasonably Available Control Technology (RACT) Particulate Matter | 8/14/2019 | 1/22/2024, 89 FR 3888 | |
62-296.702 | Fossil Fuel Steam Generators | 7/10/2014 | 1/22/2024, 89 FR 3888 | |
62-296.704 | Asphalt Concrete Plants | 7/10/2014 | 1/22/2024, 89 FR 3888 | |
62-296.705 | Phosphate Processing Operations | 7/10/2014 | 1/22/2024, 89 FR 3888 | |
62-296.707 | Electric Arc Furnaces | 7/10/2014 | 1/22/2024, 89 FR 3888 | |
62-296.708 | Sweat or Pot Furnaces | 7/10/2014 | 1/22/2024, 89 FR 3888 | |
62-296.711 | Materials Handling, Sizing, Screening, Crushing and Grinding Operations | 7/10/2014 | 1/22/2024, 89 FR 3888 | |
62-296.712 | Miscellaneous Manufacturing Process Operations | 7/10/2014 | 1/22/2024, 89 FR 3888 | |
Chapter 62-297 Stationary Sources - Emissions Monitoring | ||||
62-297.310 | General Emissions Test Requirements | 3/9/2015 | 10/6/2017, 82 FR 46682 | |
62-297.440 | Supplementary Test Procedures | 7/10/2014 | 4/2/2018, 83 FR 13875 | |
62-297.450 | EPA VOC Capture Efficiency Test Procedures | 7/10/2014 | 4/2/2018, 83 FR 13875 | |
62-297.620 | Exceptions and Approval of Alternate Procedures and Requirements | 11/23/1994 | 6/16/1999, 64 FR 32346 | |
State Statutes | ||||
112.3143 | Voting conflicts | 6/29/1999 | 7/30/2012, 77 FR 44485 | Paragraph (4) only; to satisfy the requirements of sections 128 and 110(a)(2)(E)(ii). |
112.3144 | Full and public disclosure of financial interests | 10/1/2006 | 7/30/2012, 77 FR 44485 | To satisfy the requirements of sections 128 and 110(a)(2)(E)(ii). |
120.569 | Decisions which affect substantial interests | 6/24/2011 | 7/30/2012, 77 FR 44485 | Subsection (2)(n) only; to satisfy the requirements of section 110(a)(2)(G). |
403.131 | Injunctive relief, remedies | 6/15/2001 | 7/30/2012, 77 FR 44485 | To satisfy the requirements of section 110(a)(2)(G). |
EPA-Approved Florida Source-Specific Requirements
Name of source | Permit No. | State effective date | EPA approval date | Explanation |
Harry S Truman, animal import center | NA | 11/26/1996 | 1/19/2000, 65 FR 2882 | |
Martin Gas Sales, Inc | 0570477-007-AC | 1/17/2003 | 5/1/2003, 68 FR 23209 | |
Broward County Aviation Department | 8/15/2003 | 6/17/2003, 69 FR 33862 | Order Granting Variance from Rule 62-252.400. | |
Lockheed Martin Aeronautics Company | 4/16/2005 | 11/28/2006, 71 FR 68745 | Requirement that Lockheed Martin Aeronautics Company comply with EPA's Aerospace CTG at its Pinellas County facility. | |
Combs Oil Company | 7/31/2009 | 9/25/2015, 80 FR 57727 | Order Granting Variance from Rule 62-296.418(2)(b)2. | |
Mosaic Fertilizer, LLC | Air Permit No. 0570008-080-AC | 1/15/2015 | 7/3/2017, 82 FR 30749 | Specific Conditions pertaining to EU004; EU005; and EU006. |
Rayonier Performance Fibers, LLC | Air Permit No. 0890004-036-AC | 4/12/2012 | 7/3/2017, 82 FR 30749 | Specific Conditions pertaining to EU005; EU006; and EU022. |
Tampa Electric Company - Big Bend Station | Air Permit No. 0570039-074-AC | 2/26/2015 | 7/3/2017, 82 FR 30749 | Section 3, Subsection B, Condition 5. |
WestRock, LLC | Air Permit No. 0890003-046-AC | 1/9/2015 | 7/3/2017, 82 FR 30749 | Specific Conditions pertaining to EU006; EU015; EU007; and EU011. |
Tampa Electric Company - Big Bend Station | Air Permit No. 0570039-120-AC | 12/14/2018 | 11/12/2019, 84 FR 60927 | Section 2, Condition 4; the "SO2 Emissions Cap" provision from Section 3, Condition 4; the "SO2 CEMS" provision from Section 3, Condition 4; and the "Methods of Operation" for Units 1 and 2 provision from Section 3, Condition 6. |
Mosaic Fertilizer, LLC - Bartow Facility | Air Permit No. 1050046-050-AC | 7/3/2017 | 2/20/2020, 85 FR 9666 | Section III, Subsection A, Specific Condition 3 (as administratively corrected by Permit No. 1050046-063-AC with an effective date of January 11, 2019); Condition 4; and Condition 5. |
Mosaic Fertilizer, LLC - New Wales Facility | Air Permit No. 1050059-106-AC | 10/30/2017 | 2/20/2020, 85 FR 9666 | Section III, Subsection A, Specific Condition 3 (as administratively corrected by Permit No. 1050059-114-AC with an effective date of January 11, 2019); Condition 4; and Condition 5. |
EnviroFocus Technologies, LLC | Air Construction Permit No. 0570057-27-AC | 12/14/2012 | 6/4/2021, 86 FR 29949 | Except for conditions not specifically related to lead emissions; Section 3, Subsection B, Specific Conditions 3 and 10; Section 3, Subsection C, Specific Condition 5; and Section 3, Subsection G, Specific Condition 5. |
EnviroFocus Technologies, LLC | Air Construction Permit No. 0570057-37-AC | 11/6/2019 | 6/14/2021, 86 FR 29949 | Only incorporating the following conditions: Section 3, Subsection B, Specific Conditions 2 and 3a; Section 3, Subsection C, Specific Condition 1; and Section 3, Subsection D, Specific Condition 1. |
Nutrien White Springs | 0470002-132-AC | 1/1/2023 | 8/4/2023, 88 FR 51709 | Conditions 3 through 6 at EU 066 (SAP E) and EU 067 (SAP F). |
Mosaic Fertilizer, LLC-South Pierce Facility | 1050055-037-AC | 4/1/2023 | 8/4/2023, 88 FR 51709 | Conditions 4 through 7 at EU 004 (SAP 10) and EU 005 (SAP 11). |
Tampa Electric Company (TECO)-Polk Power Station | 1050233-050-AC | 1/1/2023 | 8/4/2023, 88 FR 51709 | Conditions 1 through 4 at EU 004. |
Ascend Pensacola | 0330040-076-AC | 1/1/2023 | 8/4/2023, 88 FR 51709 | Conditions 1 through 6 at EU 042. |
Trademark Nitrogen | 0570025-016-AC | 1/1/2023 | 8/4/2023, 88 FR 51709 | Conditions 1 and 5 through 9 at EU 001. |
EPA-Approved Florida Non-Regulatory Provisions
Provision | State effective date | EPA approval date | FEDERAL REGISTER, notice | Explanation |
Revision to Maintenance Plan for Southeast Florida Area | 12/20/2002 | 2/13/2004 | 69 FR 7132 | 10 year update. |
Revision to Maintenance Plan for the Tampa, Florida Area | 12/20/2002 | 3/29/2004 | 69 FR 16172 | 10 year update. |
Revision to Maintenance Plan Update for Jacksonville Area, Florida | 12/20/2002 | 7/22/2003 | 68 FR 43315 | |
110(a)(1) Maintenance Plan for the Southeast Florida Area | 7/2/2009 | 7/26/2010 | 75 FR 29671 | 110(a)(1) maintenance plan for 1997 8-hour ozone NAAQS. |
110(a)(1) Maintenance Plan for the Tampa, Florida Area | 7/2/2009 | 7/26/2010 | 75 FR 29671 | 110(a)(1) maintenance plan for 1997 8-hour ozone NAAQS. |
110(a)(1) Maintenance Plan for the Jacksonville, Florida Area | 7/2/2009 | 7/26/2010 | 75 FR 29671 | 110(a)(1) maintenance plan for 1997 8-hour ozone NAAQS. |
110(a)(1) and (2) Infrastructure Requirements for the 1997 8-Hour Ozone National Ambient Air Quality Standards | 12/13/2007 | 7/30/2012 | 77 FR 44485 | |
Section 128 Requirements | 5/24/2012 | 7/30/2012 | 77 FR 44485 | |
Sections 110(a)(2)(E)(ii) and (G) Infrastructure Requirements for the 1997 8-Hour Ozone National Ambient Air Quality Standards | 5/24/2012 | 7/30/2012 | 77 FR 44485 | |
110(a)(2)(D)(i)(I) Infrastructure Requirements for the 2006 24-hour PM2.5 NAAQS | 9/23/2009 | 10/11/2012 | 77 FR 61724 | EPA partially disapproved this SIP submission to the extent that it relied on the Clean Air Interstate Rule to meet the 110(a)(2)(D)(i)(I) requirements for the 2006 24-hour PM2.5 NAAQS. |
110(a)(1) and (2) Infrastructure Requirements for 1997 Fine Particulate Matter National Ambient Air Quality Standards | 4/18/2008 | 11/8/2012 | 77 FR 66927 | With the exception of section 110(a)(2)(D)(i). |
110(a)(1) and (2) Infrastructure Requirements for 2006 Fine Particulate Matter National Ambient Air Quality Standards | 9/23/2009 | 11/8/2012 | 77 FR 66927 | With the exception of section 110(a)(2)(D)(i). |
Portion of Regional Haze Plan Amendment submitted on September 17, 2012 | 9/17/2012 | 11/29/2012 | 77 FR 71111 | Only the BART determinations approved in 77 FR 71111 are incorporated. |
110(a)(1) and (2) Infrastructure Requirements for 1997 Fine Particulate Matter National Ambient Air Quality Standards | 4/18/2008 | 4/3/2013 | 78 FR 19998 | EPA disapproved the State's prong 3 of section 110(a)(2)(D)(i) as it relates to GHG PSD permitting requirements. |
110(a)(1) and (2) Infrastructure Requirements for 2006 Fine Particulate Matter National Ambient Air Quality Standards | 9/23/2009 | 4/3/2013 | 78 FR 19998 | EPA disapproved the State's prong 3 of section 110(a)(2)(D)(i) as it relates to GHG PSD permitting requirements. |
Initial Regional Haze Plan | 3/19/2010 | 8/29/2013 | 78 FR 53250 | |
Regional Haze Plan Amendment 1 | 8/31/2010 | 8/29/2013 | 78 FR 53250 | |
Regional Haze Plan Amendment 2 | 9/17/2012 | 8/29/2013 | 78 FR 53250 | Remaining Portion of Regional Haze Plan Amendment not approved on November 29, 2012. |
Progress Energy Permit (Air Permit No. 0170004-038-AC) | 10/15/2012 | 8/29/2013 | 78 FR 53250 | |
Update to October 15, 2013, Progress Energy Permit (Air Permit No. 0170004-038-AC) | 5/2/2013 | 8/29/2013 | 78 FR 53250 | |
110(a)(1) and (2) Infrastructure Requirements for the 2008 8-Hour Ozone National Ambient Air Quality Standards | 10/31/2011 | 11/1/2013 | 78 FR 65559 | With the exception of section 110(a)(2)(D)(i)(I) concerning interstate transport; section 110(a)(2)(D)(i)(II) concerning visibility requirements; and the portions of sections 110(a)(2)(C), prong 3 of 110(a)(2)(D)(i), and 110(a)(2)(J) related to the regulation of GHG emissions, which are being disapproved. |
RVP Update for Florida 1997 8-hour Ozone Maintenance Plans | 8/15/2013 | 1/6/2014 | 79 FR 573 | |
110(a)(1) and (2) Infrastructure Requirements for the 1997 Fine Particulate Matter National Ambient Air Quality Standards | 4/18/2008 | 8/25/2014 | 79 FR 50554 | Addressing prong 4 of section 110(a)(2)(D)(i) only. |
110(a)(1) and (2) Infrastructure Requirements for the 2006 Fine Particulate Matter National Ambient Air Quality Standards | 9/23/2009 | 8/25/2014 | 79 FR 50554 | Addressing prong 4 of section 110(a)(2)(D)(i) only. |
110(a)(1) and (2) Infrastructure Requirements for the 2008 Ozone National Ambient Air Quality Standards | 10/31/2011 | 8/25/2014 | 79 FR 50554 | Addressing prong 4 of section 110(a)(2)(D)(i) only. |
110(a)(1) and (2) Infrastructure Requirements for the 2008 Lead NAAQS | 10/14/2011 | 3/18/2015 | 80 FR 14019 | Addressing the PSD permitting requirements of sections 110(a)(2)(C), 110(a)(2)(D)(i)(II) (prong 3) and 110(a)(2)(J) only. |
110(a)(1) and (2) Infrastructure Requirements for the 2010 NO2 NAAQS | 1/22/2013 | 3/18/2015 | 80 FR 14019 | Addressing the PSD permitting requirements of sections 110(a)(2)(C), 110(a)(2)(D)(i)(II) (prong 3) and 110(a)(2)(J) only. |
2008 Lead Attainment Demonstration for Hillsborough Area | 6/29/2012 | 4/16/2015 | 80 FR 20441 | |
2008 Lead Attainment Demonstration for Hillsborough Area Amendment | 6/27/2013 | 4/16/2015 | 80 FR 20441 | |
110(a)(1) and (2) Infrastructure Requirements for the 2008 Lead National Ambient Air Quality Standards | 10/14/2011 | 9/24/2015 | 80 FR 57538 | With the exception of provisions pertaining to PSD permitting requirements in sections 110(a)(2)(C), prong 3 of D(i) and (J). |
Regional Haze Plan Amendment 3 | 4/30/2014 | 10/23/2015 | 80 FR 64344 | Establishes NOX BART emissions limit for Unit 1 at the Lakeland Electric - C.D. McIntosh Power Plant and includes FDEP Permit No. 1050004-034-AC. |
March 2015 Regional Haze Progress Report | 3/10/2015 | 8/2/2016 | 81 FR 50628 | |
110(a)(1) and (2) Infrastructure Requirements for the 2010 1-hour Primary SO2 National Ambient Air Quality Standards | 6/3/2013 | 9/30/2016 | 81 FR 67179 | With the exception of section for provisions relating to 110(a)(2)(D)(i)(I) (prongs 1 and 2) concerning interstate transport requirements. |
110(a)(1) and (2) Infrastructure Requirements for the 2010 1-hour NO2 NAAQS | 1/22/2013 | 11/23/2016 | 81 FR 84479 | With the exception of sections: 110(a)(2)(B) Concerning ambient air quality monitoring and data system; 110(a)(2)(C) and (J) concerning PSD permitting requirements; and 110(a)(2)(D)(i)(I) and (II) (prongs 1 through 3) concerning interstate transport requirements. |
110(a)(1) and (2) Infrastructure Requirements for the 2012 Annual PM2.5 NAAQS | 10/15/2015 | 4/7/2017 | 82 FR 16920 | With the exception of section 110(a)(2)(D)(i)(I) and (II) (prongs 1 and 2). |
2010 1-hour SO2 Attainment Demonstration for the Hillsborough Area | 4/3/2015 | 7/3/2017 | 82 FR 30749 | |
2010 1-hour SO2 Attainment Demonstration for the Nassau Area | 4/3/2015 | 7/3/2017 | 82 FR 30749 | |
110(a)(1) and (2) Infrastructure Requirements for the 2010 1-hour NO2 NAAQS (Element B only) | 1/22/2013 | 8/10/2017 | 82 FR 37310 | Addressing section 110(a)(2)(B) concerning ambient air quality monitoring and data system only. |
110(a)(1) and (2) Infrastructure Requirements for the 2010 1-hour NO2 NAAQS | 2/3/2017 | 10/16/2017 | 82 FR 47983 | Addressing Prongs 1 and 2 of section 110(a)(2)(D)(i) only. |
2008 Lead NAAQS Maintenance Plan for the Hillsborough Area | 3/26/2018 | 9/11/2018 | 83 FR 45836 | |
110(a)(1) and (2) Infrastructure Requirements for the 2012 Annual PM2.5 NAAQS | 10/15/2015 | 9/25/2018 | 83 FR 48387 | Addressing Prongs 1 and 2 of section 110(a)(2)(D)(i)(I) only. |
110(a)(1) and (2) Infrastructure Requirements for the 2008 8-Hour Ozone NAAQS | 10/3/2017 | 4/11/2019 | 84 FR 14615 | Addressing prongs 1 and 2 of section 110(a)(2)(D)(i)(I) only. |
2010 1-hour SO2 Maintenance Plan for the Nassau Area | 6/7/2018 | 4/24/2019 | 84 FR 17085 | |
2010 1-hour SO2 Maintenance Plan for the Hillsborough Area | 6/7/2018 | 11/12/2019 | 84 FR 60927 | |
2010 1-hour SO2 Maintenance Plan for the Hillsborough-Polk Area | 10/9/2019 | 2/20/2020 | 85 FR 9666 | |
110(a)(1) and (2) Infrastructure Requirements for the 2015 8-Hour Ozone NAAQS | 9/18/2018 | 4/6/2020 | 85 FR 19089 | With the exception of Prongs 1 and 2 of section 110(a)(2)(D)(i)(I). |
110(a)(1) and (2) Infrastructure Requirements for the 2010 1-hour SO2 NAAQS | 9/18/2018 | 5/1/2020 | 85 FR 25295 | Addressing Prongs 1 and 2 of section 110(a)(2)(D)(i) only. |
2008 Lead NAAQS Maintenance Plan for the Hillsborough Area | 1/23/2020 | 6/4/2021 | 86 FR 29949 | Updates to the attainment emissions inventory and the maintenance demonstration, including the projected future emissions inventories, in the March 26, 2018 maintenance plan. |
110(a)(1) and (2) Infrastructure Requirements for the 1997 8-Hour Ozone National Ambient Air Quality Standards | 8/26/2020 | 7/7/2021 | 86 FR 35608 | Approving SIP submission for sections 110(a)(2)(C) & 110(a)(2)(J) as it relates to GHG PSD permitting requirements. |
110(a)(1) and (2) Infrastructure Requirements for the 1997 Annual Fine Particulate Matter National Ambient Air Quality Standards | 8/26/2020 | 7/7/2021 | 86 FR 35608 | Approving SIP submission for prong 3 of section 110(a)(2)(D)(i) as it relates to GHG PSD permitting requirements. |
110(a)(1) and (2) Infrastructure Requirements for the 2006 24-hour Fine Particulate Matter National Ambient Air Quality Standards | 8/26/2020 | 7/7/2021 | 86 FR 35608 | Approving SIP submission for prong 3 of section 110(a)(2)(D)(i) as it relates to GHG PSD permitting requirements. |
110(a)(1) and (2) Infrastructure Requirements for the 2008 8-Hour Ozone National Ambient Air Quality Standards | 8/26/2020 | 7/7/2021 | 86 FR 35608 | Approving SIP submission for section 110(a)(2)(C), prong 3 of 110(a)(2)(D)(i), and 110(a)(2)(J) as it relates to the regulation of GHG emissions. |
110(a)(1) and (2) Infrastructure Requirements for the 2015 8-Hour Ozone NAAQS | 9/18/2018 | 12/2/2021 | 86 FR 68413 | Addressing Prongs 1 and 2 of section 110(a)(2)(D)(i)(I) only. |
40 C.F.R. §52.520
For FEDERAL REGISTER citations affecting §52.520, see the List of CFR Sections Affected, which appears in the Finding Aids section of the printed volume and at www.govinfo.gov.