40 C.F.R. § 52.1833

Current through September 30, 2024
Section 52.1833 - Section 110(a)(2) infrastructure requirements
(a) On November 23, 2009, Tom Bachman, Senior Environmental Engineer, North Dakota Department of Health, submitted a completeness criteria checklist which provides the State of North Dakota's SIP provisions which meet the requirements of CAA Section 110(a)(1) and (2). The following elements are approved for the 1997 ozone NAAQS: (A), (B), (C), (D)(ii), (E)(i), (E)(iii), (F), (G), (H), (J), (K), (L), and (M). The following element is conditionally approved for the 1997 ozone NAAQS: (E)(ii).
(b) On August 12, 2010, Tom Bachman, Senior Environmental Engineer, North Dakota Department of Health, submitted a completeness criteria checklist which provides the State of North Dakota's SIP provisions which meet the requirements of CAA Section 110(a)(1) and (2). The following element is approved for the 2006 PM2.5 NAAQS: (D)(i)(I).
(c) EPA is approving the following infrastructure elements for the 1997 and 2006 PM2.5 NAAQS: CAA section 110(a)(2)(A), (B), (C) with respect to minor NSR and PSD requirements, (D)(ii), (E), (F), (G), (H), (J), (K), (L), and (M). EPA is approving (D)(i)(II) with respect to PSD requirements for the 2006 PM2.5 NAAQS.
(d) EPA is approving the following infrastructure elements for the 2008 ozone, 2008 Pb, and 2010 NO2 NAAQS: CAA 110(a)(2) (A), (B), (C) with respect to minor NSR and PSD requirements, (D)(i)(II) elements 3 and 4, (D)(ii), (E), (F), (G), (H), (J), (K), (L), and (M). EPA is approving element 4 of 110(a)(2)(D)(i)(II) for the 2006 PM2.5 NAAQS. Finally, EPA is approving D(i)(I) elements 1 and 2 for the 2008 Pb and 2010 NO2 NAAQS.
(e) EPA is approving both elements of CAA section 110(a)(2)(D)(i)(I) for the 2008 ozone NAAQS, which was submitted to EPA on March 8, 2013.
(f) The North Dakota Department of Health provided submissions to meet infrastructure requirements for the State of North Dakota for the 2010 SO2 and 2012 PM2.5 NAAQS on March 7, 2013 and August 23, 2015, respectively. The State's Infrastructure SIP for the 2010 SO2 and 2012 PM2.5 NAAQS is approved with respect to section (110)(a)(1) and the following elements of section (110)(a)(2): (A), (B), (C) with respect to minor NSR and PSD requirements, (D)(i)(II), (D)(ii), (E), (F), (G), (H), (J), (K), (L), and (M).
(g) EPA is approving the North Dakota 2012 PM2.5 NAAQS Infrastructure Certification, submitted to EPA on August 23, 2015, for both elements of CAA section 110(a)(2)(D)(i)(I) for the 2012 PM2.5 NAAQS.
(h) EPA is approving the North Dakota 2010 SO2 NAAQS Infrastructure Certification, submitted to EPA on March 7, 2013, for both elements of CAA section 110(a)(2)(D)(i)(I) for the 2010 SO2 NAAQS.
(i) The North Dakota Department of Environmental Quality submitted certification of North Dakota's infrastructure SIP for the 2015 O3 NAAQS on November 6, 2018. North Dakota's infrastructure certification demonstrates how the State, where applicable, has plans in place that meet the requirements of section 110 for (A), (B), (C), (D)(i)(I) (Prongs 1 and 2), (D)(i)(II) (Prong 3), (D)(ii), (E), (F), (G), (H), (J), (K), (L), and (M). The EPA is disapproving (D)(i)(II) (Prong 4).

40 C.F.R. §52.1833

77 FR 57032, Sept. 17, 2012, as amended at 78 FR 45458, July 29, 2013; 78 FR 45869, July 30, 2013; 80 FR 60541, Oct. 7, 2015; 81 FR 7708, Feb. 16, 2016; 82 FR 46682, Oct. 6, 2017; 83 FR 31329, July 5, 2018; 83 FR 44503, Aug. 31, 2018; 85 FR 20178, Apr. 10, 2020
81 FR 7708, 2/16/2016; 82 FR 46682, 11/6/2017; 83 FR 31329, 8/6/2018; 83 FR 44503, 10/1/2018; 85 FR 20178, 5/11/2020