EPA-Approved Missouri Regulations
Missouri citation | Title | State effective date | EPA approval date | Explanation |
Missouri Department of Natural Resources | ||||
Chapter 1-Organization | ||||
10-1.020(1) and (2) | Commission Voting and Meeting Procedures | 7/30/1998 | 6/21/2013, 78 FR 37457 | Only sections (1) and (2) are Federally approved. |
Chapter 2-Air Quality Standards and Air Pollution Control Regulations for the Kansas City Metropolitan Area | ||||
10-2.090 | Incinerators | 2/25/1970 | 3/18/1980, 45 FR 17145 | The state has rescinded this rule. |
10-2.205 | Control of Emissions from Aerospace Manufacturing and Rework Facilities | 3/30/2019 | 4/8/2020, 85 FR 19674 | |
10-2.210 | Control of Emissions From Solvent Metal Cleaning | 2/29/2008 | 6/20/2008, 73 FR 35074 | |
10-2.220 | Liquefied Cutback Asphalt Paving Restricted | 6/3/1991 | 6/23/1992, 57 FR 27939 | |
10-2.230 | Control of Emissions from Industrial Surface Coating Operations | 3/30/2019 | 9/16/2020, 85 FR 57701 | |
10-2.260 | Control of Petroleum Liquid Storage, Loading, and Transfer | 4/30/2004 | 2/2/2005, 70 FR 5379 | |
10-2.290 | Control of Emissions From Rotogravure and Flexographic Printing Facilities | 3/30/1992 | 9/6/1994, 59 FR 43376 (correction). 8/30/1993, 58 FR 45451 | The state rule has Sections (6)(A) and (6)(B), which EPA has not approved. |
10-2.300 | Control of Emissions from Manufacturing of Paints, Varnishes, Lacquers, Enamels and Other Allied Surface Coating Products | 2/28/2019 | 4/13/2020, 85 FR 20424 | |
10-2.320 | Control of Emissions from Production of Pesticides and Herbicides | 1/30/2019 | 8/21/2020, 85 FR 51663 | |
10-2.340 | Control of Emissions From Lithographic and Letterpress Printing Operations | 1/30/2019 | 7/22/2020, 85 FR 44211 | |
10-2.385 | Control of Heavy Duty Diesel Vehicle Idling Emissions | 7/30/2012 | 3/18/2014, 79 FR 15017 | |
Chapter 3-Air Pollution Control Regulations for the Outstate Missouri Area | ||||
10-3.040 | Incinerators | 2/1/1978 | 3/18/1980, 45 FR 17145 | |
Chapter 4-Air Quality Standards and Air Pollution Control Regulations for Springfield-Greene County Area | ||||
10-4.080 | Incinerators | 12/16/1969 | 3/18/1980, 45 FR 17145 | The state has rescinded this rule. |
Chapter 5-Air Quality Standards and Air Pollution Control Regulations for the St. Louis Metropolitan Area | ||||
10-5.040 | Use of Fuel in Hand-Fired Equipment Prohibited | 9/18/1970 | 3/18/1980, 45 FR 17145 | |
10-5.060 | Refuse Not To Be Burned in Fuel Burning Installations | 9/18/1970 | 3/18/1980, 45 FR 17145 | The state has rescinded this rule. |
10-5.080 | Incinerators | 9/18/1970 | 3/18/1980, 45 FR 17145 | The state has rescinded this rule. |
10-5.220 | Control of Petroleum Liquid Storage, Loading and Transfer | 11/30/2014 | 11/10/2015, 80 FR 69604 | |
10-5.295 | Control of Emissions from Aerospace Manufacturing and Rework Facilities | 3/30/2019 | 4/8/2020, 85 FR 19674 | |
10-5.300 | Control of Emissions from Solvent Metal Cleaning | 11/30/2006 | 3/9/2007, 72 FR 10610 | |
10-5.310 | Liquefied Cutback Asphalt Restricted | 3/1/1989 | 3/5/1990, 55 FR 7712 | |
10-5.330 | Control of Emissions from Industrial Surface Coating Operations | 3/30/2019 | 9/16/2020, 85 FR 57721 | |
10-5.340 | Control of Emissions From Rotogravure and Flexographic Printing Facilities | 8/30/2011 | 1/23/2012, 77 FR 3144 | The state rule has Section (6)(A)(B), which the EPA has not approved. |
10-5.350 | Control of Emissions From Manufacture of Synthesized Pharmaceutical Products | 11/20/1991 | 4/3/1995, 60 FR 16806 (correction). 8/24/1994, 59 FR 43480 | |
10-5.381 | On-Board Diagnostics Motor Vehicle Emissions Inspection | 5/30/2022 | 9/13/2022, 87 FR 55918 | |
10-5.385 | Control of Heavy Duty Diesel Vehicle Idling Emissions | 7/30/2012 | 3/18/2014, 79 FR 15017 | |
10-5.390 | Control of Emissions from the Manufacturing of Paints, Varnishes, Lacquers, Enamels and Other Allied Surface Coating Products | 9/30/2020 | 4/4/2022, 87 FR 19392 | |
10-5.420 | Control of Equipment Leaks from Synthetic Organic Chemical and Polymer Manufacturing Plants | 3/11/1989 | 3/5/1990, 55 FR 7712 | |
10-5.442 | Control of Emissions from Lithographic and Letterpress Printing Operations | 1/30/2020 | 8/2/2021, 86 FR 41406 | |
10-5.451 | Control of Emissions from Aluminum Foil Rolling | 9/30/2000 | 7/20/2001, 66 FR 37906 | |
10-5.480 | St. Louis Area Transportation Conformity Requirements | 2/28/2011 | 8/29/2013, 78 FR 53247 | |
10-5.490 | Municipal Solid Waste Landfills | July 30, 2022 | 2/16/2024, 89 FR 12246 | |
10-5.500 | Control of Emissions From Volatile Organic Liquid Storage | 7/30/2020 | 10/4/2023, 88 FR 68469 | Section (2)(N)4 is not SIP-approved. Section (5)(F) retains a previously approved version of the state rule text. |
10-5.510 | Control of Emissions of Nitrogen Oxides | 5/30/2006 | 11/6/2006, 71 FR 64888 | |
10-5.520 | Control of Volatile Organic Compound Emissions From Existing Major Sources | 2/29/2000 | 5/18/2000, 65 FR 31489 | |
10-5.530 | Control of Volatile Organic Compound Emissions From Wood Furniture Manufacturing Operations | 2/28/2019 | 5/7/2021, 86 FR 24503 | |
10-5.540 | Control of Emissions From Batch Process Operations | 7/30/2020 | 9/29/2021, 86 FR 53870 | |
10-5.550 | Control of Volatile Organic Compound Emissions From Reactor Processes and Distillation Operations Processes in the Synthetic Organic Chemical Manufacturing Industry | 1/30/2020 | 5/27/2022, 87 FR 32088 | |
10-5.570 | Control of Sulfur Emissions From Stationary Boilers | 1/30/2019 | 8/18/2020, 85 FR 50784 | |
Chapter 6-Air Quality Standards, Definitions, Sampling and Reference Methods, and Air Pollution Control Regulations for the State of Missouri | ||||
10-6.010 | Ambient Air Quality Standards | 7/30/2014 | 3/4/2015, 80 FR 11577 | Hydrogen Sulfide and Sulfuric Acid state standards are not SIP approved. |
10-6.020 | Definitions and Common Reference Tables | 3/30/2014 | 3/4/2015, 80 FR 11577 | Many of the definitions pertain to Title V, 111(d) and asbestos programs and are approved in the SIP because they provide overall consistency in the use of terms in the air program. Similarly, the EPA has also approved this rule as part of the Title V program, and 111(d) even though many of the definitions pertain only to the SIP. |
10-6.030 | Sampling Methods for Air Pollution Sources | 11/30/2019 | 1/24/2020, 85 FR 4229 | |
10-6.040 | Reference Methods | 1/30/2019 | 8/22/2019, 84 FR 43699 | |
10-6.045 | Open Burning Requirements | 9/30/2009 | 3/28/2017, 82 FR 15299 | |
10-6.050 | Start-Up, Shutdown, and Malfunction Conditions | 1/30/2020 | 6/24/2022, 87 FR 37752 | |
10-6.060 | Construction Permits Required | 5/30/2020 | 8/11/2022, 87 FR 49530 | Provisions of the 2010 PM2.5 PSD-Increments, SILs and SMCs rule relating to SILs and SMCs that were affected by the January 22, 2013 U.S. Court of Appeals decision are not SIP approved. Provisions of the 2002 NSR reform rule relating to the Clean Unit Exemption, Pollution Control Projects, and exemption from recordkeeping provisions for certain sources using the actual-to-projected-actual emissions projections test are not SIP approved. "Livestock and livestock handling systems from which the only potential contaminant is odorous gas." Section 9, pertaining to hazardous air pollutants, is not SIP approved. EPA previously approved the 3/30/2016 state effective date version of 10 CSR 10-6.060, with the above exceptions, in a Federal Register document published October 11, 2016. Section (1)(B) of 10 CSR 10-6.060 covering the voluntary permit provision is not SIP approved. |
10-6.061 | Construction Permit Exemptions | 9/30/2020 | 8/16/2022, 87 FR 50267 | Sections (3)(A)2.D. and (3)(A)2.E.(II)(c) are not SIP-approved. |
10-6.062 | Construction Permits by Rule | 7/30/2022 | 8/4/2023, 88 FR 51711 | |
10-6.065 | Operating Permits | 3/30/2019 | 9/30/2019, 84 FR 51418 | Section (5) contains provisions pertaining only to Missouri's part 70 program and is not approved as a revision to the SIP. |
10-6.110 | Reporting Emission Data, Emission Fees, and Process Information | 3/30/2021 | 8/24/2021, 86 FR 47219 | Section (3)(A), Emission Fees, has not been approved as part of the SIP. |
10-6.120 | Restriction of Emissions of Lead from Specific Lead Smelter-Refinery Installations | 10/25/2018 | 9/16/2020, 85 FR 57698 | |
10-6.130 | Controlling Emissions During Episodes of High Air Pollution Potential | 12/30/2013 | 8/18/2015, 80 FR 49916 | |
10-6.140 | Restriction of Emissions Credit for Reduced Pollutant Concentrations from the Use of Dispersion Techniques | 1/30/2020 | 5/24/2022, 87 FR 31430 | |
10-6.150 | Circumvention | 8/15/1990 | 4/17/1991, 56 FR 15500 | |
10-6.170 | Restriction of Particulate Matter to the Ambient Air Beyond the Premises of Origin | 3/30/2019 | 6/2/2023, 88 FR 36251 | |
10-6.180 | Measurement of Emissions of Air Contaminants | 11/30/2018 | 7/5/2019, 84 FR 32066 | |
10-6.210 | Confidential Information | 9/30/2022 | 6/29/2023, 88 FR 42030 | |
10-6.220 | Restriction of Emission of Visible Air Contaminants | 3/30/2019 | 3/8/2023, 88 FR 14269 | Subsection (1)(I) referring to the open burning rule, 10 CSR 10-6.045, is not SIP approved. |
10-6.260 | Restriction of Emission of Sulfur Compounds | 9/30/2012 | 11/22/2013, 78 FR 69995 | Section (3)(A)(1-4) approved pursuant to 111d only. |
10-6.280 | Compliance Monitoring Usage | 2/28/2019 | 9/6/2019, 84 FR 46892 | |
10-6.330 | Restriction of Emissions From Batch-Type Charcoal Kilns | 7/30/2020 | 9/30/2021, 86 FR 54100 | |
10-6.350 | Emissions Limitations and Emissions Trading of Oxides of Nitrogen | 5/30/2007 | 4/2/2008, 73 FR 17890 | |
10-6.360 | Control of NOX Emissions From Electric Generating Units and Non-Electric Generating Boilers | 5/30/2007 | 4/2/2008, 73 FR 17890 | |
10-6.364 | Clean Air Interstate Rule Seasonal NOX Trading Program | 5/18/2007 | 12/14/2007, 72 FR 71073 | |
10-6.372 | Cross-State Air Pollution Rule NOX Annual Trading Program | 3/30/2019 | 12/4/2019, 84 FR 66316 | |
10-6.374 | Cross-State Air Pollution Rule NOX Ozone Season Group 2 Trading Program | 3/30/2019 | 12/4/2019, 84 FR 66316 | |
10-6.376 | Cross-State Air Pollution Rule SO2 Group 1 Trading Program | 7/29/2021 | 9/15/2023, 88 FR 63529 | |
10-6.380 | Control of NOX Emissions From Portland Cement Kilns | 2/28/2019 | 4/13/2020, 85 FR 20426 | |
10-6.390 | Control of NOX Emissions from Large Stationary Internal Combustion Engines | 10/30/2013 | 9/16/2015, 80 FR 55547 | |
10-6.400 | Restriction of Emission of Particulate Matter From Industrial Processes | 6/27/2013 | 10/21/2014, 79 FR 62844. | |
10-6.405 | Restriction of Particulate Matter Emissions from Fuel Burning Equipment Used for Indirect Heating | 9/30/2020 | 9/30/2021, 86 FR 54102 | |
10-6.410 | Emissions Banking and Trading | 9/30/2012 | 11/22/2013, 78 FR 69995 | |
Kansas City Chapter 8-Air Quality | ||||
8-2 | Definitions | 12/10/1998 | 12/22/1999, 64 FR 71663 | |
8-4 | Open burning | 10/31/1996 | 4/22/1998, 65 FR 19823 | |
8-5 | Emission of particulate matter | 12/10/1998 | 12/22/1999, 64 FR 71663 | Only subsections 8-5(c)(1)b, 8-5(c)(1)c, 8-5(c)(2)a, 8-5(c)(3)a, 8-5(c)(3)b, 8-5(c)(3)c, 8-5(c)(3)d are approved in the SIP. |
Springfield Chapter 6-Air Pollution Control Standards | ||||
Article I | Definitions | 12/4/2008 | 10/21/2010, 75 FR 64953 | Only Section 6-2 is approved by EPA. |
Article II | Administrative and Enforcement | 12/4/2008 | 10/21/2010, 75 FR 64953 | Only Sections 6-151, 155, 156, and 171 are approved by EPA. |
Article V | Incinerators | 12/4/2008 | 10/21/2010, 75 FR 64953 | Only Sections 6-311 through 314 are approved by EPA. |
St. Louis City Ordinance 68657 | ||||
Section 6 | Definitions | 8/28/2003 | 12/9/2003, 68 FR 68521 | The phrase other than liquids or gases in the Refuse definition has not been approved. |
Section 15 | Open Burning Restrictions | 8/28/2003 | 12/9/2003, 68 FR 68521 |
EPA-Approved Missouri Source-Specific Permits and Orders
Name of source | Order/Permit number | State effective date | EPA Approval date | Explanation |
(1) ASARCO Inc. Lead Smelter, Glover, MO | Order | 8/13/1980 | 4/27/1981, 46 FR 23412 | |
(2) St. Joe Lead (Doe Run) Company Lead Smelter, Herculaneum, MO | Order | 3/21/1984 | 6/11/1984, 49 FR 24022 | |
(3) AMAX Lead (Doe Run) Company Lead Smelter, Boss, MO | Order | 9/27/1984 | 1/7/1985, 50 FR 768 | |
(4) Gusdorf Operating Permit 11440 Lackland Road, St. Louis County, MO | Permit Nos: 04682-04693 | * 4/29/1980 | 10/15/1984, 49 FR 40164 | |
(5) Doe Run Lead Smelter, Herculaneum, MO | Consent Order | 3/9/1990 | 3/6/1992, 57 FR 8076 | |
(6) Doe Run Lead Smelter, Herculaneum, MO | Consent Order | 8/17/1990 | 3/6/1992, 57 FR 8076 | |
(7) Doe Run Lead Smelter, Herculaneum, MO | Consent Order | 7/2/1993 | 5/5/1995, 60 FR 22274 | |
(8) Doe Run Lead Smelter, Herculaneum, MO | Consent Order (Modification) | 4/28/1994 | 5/5/1995, 60 FR 22274 | |
(9) Doe Run Lead Smelter, Herculaneum, MO | Consent Order (Modification) | 11/23/1994 | 5/5/1995, 60 FR 22274 | |
(10) Doe Run Buick Lead Smelter, Boss, MO | Consent Order | 7/2/1993 | 8/4/1995, 60 FR 39851 | |
(11) Doe Run Buick Lead Smelter, Iron County, MO | Consent Order (Modification) | 9/29/1994 | 8/4/1995, 60 FR 39851 | |
(12) ASARCO Glover Lead Smelter, Glover, MO | Consent Decree CV596-98CC with exhibits A-G | 7/30/1996 | 3/5/1997, 62 FR 9970 | |
(13) Eagle-Picher Technologies, Joplin, MO | Consent Agreement | 8/26/1999 | 4/24/2000, 65 FR 21649 | |
(14) Doe Run Resource Recycling Facility near Buick, MO | Consent Order | 5/11/2000 | 10/18/2000, 65 FR 62295 | |
(15) St. Louis University | Medical Waste Incinerator | 9/22/1992 | 4/22/1998, 63 FR 19823 | |
(16) St. Louis University | Permit Matter No. 00-01-004 | 1/31/2000 | 10/26/2000, 65 FR 64156 | |
(17) [Reserved] | ||||
(18) Asarco, Glover, MO | Modification of Consent Decree, CV596-98CC | 7/31/2000 | 4/16/2002, 67 FR 18497 | |
(19) Doe Run, Herculaneum, MO | Consent Judgment, CV301-0052C-J1, with Work Practice Manual and S.O.P. for Control of Lead Emissions (Rev 2000) | 1/5/2001 | 4/16/2002, 67 FR 18497 | |
(20) Springfield City Utilities James River Power Station SO2 | Consent Agreement | 12/6/2001 | 3/25/2002, 67 FR 13570 | |
(21) St. Louis University | Permit Matter No. 00-01-004 | 8/28/2003 | 12/9/2003, 68 FR 68521 | |
(22) [Reserved] | ||||
(23) Grossman Iron and Steel Company | Permit No. SR00.045A | 7/19/2006 | 12/4/2006, 71 FR 70312 | |
(24) Doe Run Herculaneum, MO | Consent Judgment Modification, CV301-0052CCJ1 | 12/20/2005 | 5/4/2007, 72 FR 25203 | |
(25) Doe Run Herculaneum, MO | Consent Judgment Modification, 07JE-CC00552 | 5/21/2007 7/29/2009 modification | 2/17/2012, 77 FR 9529 | This approval does not include any subsequent modifications after 2009. |
(26) Holcim | 4/19/2009 | 6/26/2012 77 FR 38007 | § 52.1339(c) ; Limited Approval. | |
(27) Doe Run Herculaneum, MO | Consent Judgment Modification 07JE-CC00552 | 10/19/2011 | 10/20/2014, 79 FR 62574 | Modification to section 2.B.1. of the 2007 Consent Judgment. |
(28) Doe Run Herculaneum, MO | Consent Judgment 13JE-CC00557 | 6/19/2013 | 10/20/2014, 79 FR 62574 | |
(29) Doe Run Buick Resource Recycling Facility | Consent Judgment 13IR-CC00016 | 7/29/2013 | 8/28/2015, 80 FR 52194 | |
(30) Americold Logistics, LLC 24-Hour Particulate Matter (PM10) National Ambient Air Quality (NAAQS) Consent Judgment | Consent Judgment 14AP-CC00036 | 4/27/2014 | 1/28/2016, 80 FR 4888 | |
(31) Exide Technologies Canon Hollow, MO | Consent Judgment 14H0-CC00064 | 10/10/2014 | 9/26/2016, 81 FR 65898 | |
(32) [Reserved] | ||||
(33) [Reserved] | ||||
(34) Ameren Missouri | Consent Agreement and Addendum No. APCP-2015-034 | 12/14/2020 | 1/28/2022, 87 FR 4508 | |
(35) Vicinity Energy-Kansas City | Consent Agreement No. APCP-2021-007 | 6/25/2021 | 1/31/2022, 87 FR 4812 | |
(36) Doe Run Glover Facility | Consent Agreement APCP-2020-002 | 6/2/2020 | 4/27/2022, 87 FR 24870 | |
(37) Ameren Missouri-Sioux Energy Center | Consent Agreement No. APCP-2021-018 | 3/31/2022 | 11/16/2022, 87 FR 68634 | |
(38) Kansas City Power and Light-Lake Road Facility | Amendment #2 to Administrative Order on Consent No. APCP-2015-118 | 10/18/2021 | 7/3/2023, 88 FR 42640 | EPA is approving Amendment #2 to AOC No. APCP-2015-118, except for paragraph 12.A. |
* St Louis County.
EPA-Approved Missouri Nonregulatory SIP Provisions
Name of nonregulatory SIP provision | Applicable geographic or nonattainment area | State submittal date | EPA approval date | Explanation |
(1) Kansas City and Outstate Air Quality Control Regions Plan | Kansas City and Outstate | 1/24/1972 | 5/31/1972, 37 FR 10875 | |
(2) Implementation Plan for the Missouri portion of the St. Louis Interstate Air Quality Control Region | St. Louis | 1/24/1972 | 5/31/1972, 37 FR 10875 | |
(3) Effects of adopting Appendix B to NO2 emissions | St. Louis | 3/27/1972 | 5/31/1972, 37 FR 10875 | |
(4) CO air quality data base | St. Louis | 5/2/1972 | 5/31/1972, 37 FR 10875 | |
(5) Budget and manpower projections | Statewide | 2/28/1972 | 10/28/1972, 37 FR 23089 | |
(6) Emergency episode manual | Kansas City | 5/11/1972 | 10/28/1972, 37 FR 23089 | |
(7) Amendments to Air Conservation Law | Statewide | 7/12/1972 | 10/28/1972, 37 FR 23089 | |
(8) Air monitoring plan | Outstate | 7/12/1972 | 10/28/1972, 37 FR 23089 | |
(9) Amendments to Air Conservation Law | Statewide | 8/8/1972 | 10/28/1972, 37 FR 23089 | |
(10) Transportation control strategy | Kansas City | 5/11/1973 5/21/1973 | 6/22/1973, 38 FR 16550 | |
(11) Analysis of ambient air quality data and recommendation to not designate the area as an air quality maintenance area | Kansas City | 4/11/1974 | 3/2/1976, 41 FR 8956 | [FRL 484-4]. |
(12) Recommendation to designate air quality maintenance areas | St. Louis, Columbia, Springfield | 5/6/1974 | 9/9/1975, 40 FR 41942 | [FRL 418-5]. |
(13) Plan to attain the NAAQS | Kansas City, St. Louis | 7/2/1979 | 4/9/1980, 45 FR 24140 | [FRL 1456-1]. Correction notice published 7/11/1980. |
(14) Schedule for I/M program and commitment regarding difficult transportation control measures (TCMs) | St. Louis | 9/9/1980 | 3/16/1981, 46 FR 16895 | [A-7-FRL-1778-3]. |
(15) Lead SIP | Statewide | 9/2/1980, 2/11/1981, 2/13/1981 | 4/27/1981, 46 FR 23412, 7/19/1984, 49 FR 29218 | [A7 FRL 1802-8], [MO 1515; OAR-FRL-2633-8]. Correction notice published 5/15/1981. |
(16) Report on recommended I/M program | St. Louis | 12/16/1980 | 8/27/1981, 46 FR 43139 | [A7-FRL 1909-8]. |
(17) Report outlining commitments to TCMs, analysis of TCMs, and results of CO dispersion modeling | St. Louis | 2/12/1981, 4/28/1981 | 11/10/1981, 46 FR 55518 | [A7-FRL 1958-3]. |
(18) 1982 CO and ozone SIP | St. Louis | 12/23/1982, 8/24/1983 | 10/15/1984, 49 FR 40164 | [EPA Action MO 999; A-7-FRL-2691-8]. |
(19) Air quality monitoring plan | Statewide | 6/6/1984 | 9/27/1984, 49 FR 38103 | [EPA Action MO 1586; A-7-FRL-2682-5]. |
(20) Vehicle I/M program | St. Louis | 8/27/1984 | 8/12/1985, 50 FR 32411 | [MO-1619; A-7-FRL-2880-9]. |
(21) Visibility protection plan | Hercules Glades and Mingo Wildlife Area. | 5/3/1985 | 2/10/1986, 51 FR 4916 | [A-7-FRL-2967-5; MO 1809]. |
(22) Plan for attaining the ozone standard by December 31, 1987 | St. Louis | 8/1/1985 | 9/3/1986, 51 FR 31328 | [A-7-FRL-3073-3]. |
(23) PM10 plan | Statewide | 3/29/1988, 6/15/1988 | 7/31/1989, 54 FR 31524 | [FRL-3621-8]. |
(24) Construction permit fees including Chapter 643 RSMo | Statewide | 1/24/1989, 9/27/1989 | 1/9/1990, 55 FR 735 | [FRL-3703-4]. |
(25) PSD NOx requirements including a letter from the state pertaining to the rules and analysis | Statewide | 7/9/1990 | 3/5/1991, 56 FR 9172 | [FRL-3908-6]. |
(26) Lead plan | Herculaneum | 9/6/1990, 5/8/1991 | 3/6/1992, 57 FR 8076 | [MO6-1-5333; FRL-4102-7]. |
(27) Ozone maintenance plan | Kansas City | 10/9/1991 | 6/23/1992, 57 FR 27939 | [Moll-1-5440; FRL-4140-7]. |
(28) Small business assistance plan | Statewide | 3/10/1993 | 10/26/1993, 58 FR 57563 | [MO-14-5860; FRL-4700-8]. |
(29) Part D Lead plan | Herculaneum | 7/2/1993, 6/30/1994, 11/23/1994 | 5/5/1995, 60 FR 22274 | [MO-17-1-6023A; FRL-5197-7]. |
(30) Intermediate permitting program including three letters pertaining to authority to limit potential to emit hazardous air pollutants | Statewide | 3/31/1994, 11/7/1994, 10/3/1994, 2/10/1995 | 9/25/1995, 60 FR 49340 | [MO-21-1-6443(a); FRL-5289-6]. |
(31) Part D lead plan | Bixby | 7/2/1993, 6/30/1994 | 8/4/1995, 60 FR 39851 | [MO-18-1-6024A; FRL-5263-9]. |
(32) Transportation conformity plans including a policy agreement and a letter committing to implement the state rule consistent with the Federal transportation conformity rule | St. Louis, Kansas City | 2/14/1995 | 2/29/1996, 61 FR 7711 | [MO-29-1-7151a; FRL-5425-2]. |
(33) Emissions inventory update including a motor vehicle emissions budget | Kansas City | 4/12/1995 | 4/25/1996, 61 FR 18251 | [KS-6-1-6985, MO-31-1-7153; FRL 5448-9]. |
(34) Part D Lead Plan | Glover | 8/14/1996 | 3/5/1997, 62 FR 9970 | [MO-015-1015a; FRL-5682-5]. |
(35) CO Maintenance Plan | St. Louis | 6/13/1997, 6/15/1998 | 1/26/1999, 64 FR 3855 | [MO 043-1043(a); FRL-6220-1]. |
(36) 1990 Base Year Inventory | St. Louis | 1/20/1995 | 2/17/2000, 65 FR 8060 | [MO 092-1092; FRL-6528-7]. |
(37) 15% Rate-of-Progress Plan | St. Louis | 11/12/1999 | 5/18/2000, 65 FR 31485 | [MO 103-1103; FRL-6701-3]. |
(38) Implementation plan for the Missouri inspection maintenance program | Jefferson County | 11/12/1999 | 5/18/2000, 65 FR 31480 | [MO 096-1096b; FRL-6701-6]. Approved for Jefferson County only. |
(39) Doe Run Resource Recycling Facility near Buick, MO | Dent Township in Iron County | 5/17/2000 | 10/18/2000, 65 FR 62295 | [MO 114-1114a; FRL-6885-6]. |
(40) Commitments with respect to implementation of rule 10 CSR 10-6.350, Emissions Limitations and Emissions Trading of Oxides of Nitrogen | Statewide | 8/8/2000 | 12/28/2000, 65 FR 82285 | [Region 7 Tracking No. 113-1113a; FRL-6923-2]. |
(41) Contingency Plan including letter of April 5, 2001 | St. Louis | 10/6/1997, 4/5/2001 | 6/26/2001, 66 FR 33996 | [Tracking No. MO-0132-1132, IL 196-3; FRL-7001-7]. |
(42) Ozone 1-Hour Standard Attainment Demonstration Plan for November 2004 including 2004 On-Road Motor Vehicle Emissions Budgets | St. Louis | 11/10/1999, 11/2/2000, 2/28/2001, 3/7/2001 | 6/26/2001, 66 FR 33996 | [MO-0132-1132, IL 196-3;FRL-7001-7]. |
(43) Doe Run Resources Corporation Primary lead Smelter, 2000 Revision of Lead SIP | Herculaneum, MO | 1/9/2001 | 4/16/2002, 67 FR 18497 | [MO 151-1151; FRL-7170-6]. |
(44) Doe Run Resources Corporation Primary Lead Smelter, 2000 Revision of Lead SIP | Glover, MO | 6/15/2001 | 4/16/2002, 67 FR 18497 | [MO 151-1151; FRL-7170-6]. |
(45) Maintenance Plan for the Missouri Portion of the St. Louis Ozone Nonattainment Area including 2014 On-Road Motor Vehicle Emission Budgets | St. Louis | 12/6/2002 | 5/12/2003, 68 FR 25414 | [MO 181-1181; FRL-7494-6]. |
(46) Maintenance Plan for the 1-hour ozone standard in the Missouri portion of the Kansas City maintenance area for the second ten-year period | Kansas City | 12/17/2002 | 1/13/2004, 69 FR 1921 | [MO 201-1201; FRL-7608-8]. |
(47) Vehicle I/M Program | St. Louis | 10/1/2003 | 5/13/2004, 69 FR 26503 | [R07-OAR-2004-MO-0001; FRL-7661-4]. |
(48) Revised Maintenance Plan of Doe Run Resource Recycling Facility near Buick, MO | Dent Township in Iron County | 4/29/2003 | 8/24/2004, 69 FR 51953 | [R07-OAR-2004-MO-0002; FRL-7805-1]. |
(49) [Reserved] | ||||
(50) Revision to Maintenance Plan for the 1-hour ozone standard in the Missouri portion of the Kansas City maintenance area for the second ten-year period | Kansas City | 10/28/2005 | 6/26/2006, 71 FR 36210 | [EPA-R07-OAR-2006-0286; FRL-8188-6]. |
(51) CAA 110(a)(2)(D)(i) SIP-Interstate Transport | Statewide | 2/27/2007 | 5/8/2007, 72 FR 25085 | [EPA-R07-OAR-2007-0249 FRL-8310-5]. |
(52) Submittal of the 2002 Base Year Inventory for the Missouri Portion of the St. Louis 8-hour ozone nonattainment area and Emissions Statement SIP | St. Louis | 6/15/2006 | 5/31/2007, 72 FR 30272 | [EPA-R07-OAR-2007-0383; FRL-8318-8]. |
(53) Maintenance Plan for the 8-hour ozone standard in the Missouri portion of the Kansas City area | Kansas City | 5/23/2007 | 8/9/2007, 72 FR 44778 | [EPA-R07-OAR-2007-0619 FRL-8450-7]. |
(54) Section 110(a)(2) Infrastructure Requirements for the 1997 8-Hour Ozone NAAQS | Statewide | 2/27/2007 | 7/11/2011, 76 FR 40619 | [EPA-R07-OAR-2011-0309 FRL-9429-1] This action addresses the following CAA elements, as applicable: 110(a)(2)(A), (B), (C), (D)(ii), (E), (F), (G), (H), (J), (K), (L), and (M). |
(55) VOC RACT Requirements for the 8-hour ozone NAAQS | St. Louis | 1/17/2007, 6/1/2011, 8/30/2011 | 1/23/2012, 77 FR 3144. 1/6/2014, 79 FR 580 | [EPA-R07-OAR-2011-0859 FRL-9621-1] [EPA-R07-OAR-2012-0767; FRL-9905-03-Region 7]. |
(56) CAA Section 110(a)(2) SIP-1978 Pb NAAQS | City of Herculaneum, MO | 7/29/2009 | 2/17/2012, 77 FR 9529 | [EPA-R07-OAR-2008-0538; FRL-9632-7]. |
(57) Regional Haze Plan for the first implementation period | Statewide | 8/5/2009, supplemented 1/30/2012 | 6/26/2012, 77 FR 38007 | [EPA-R07-OAR-2012-0153; FRL-9688-1] § 52.1339(c) ; Limited Approval. |
(58) Section 110(a)(2) Infrastructure Requirements for the 1997 PM2.5 NAAQS | Statewide | 2/27/2007 | 6/21/2013; 78 FR 37457 | [EPA-R07-OAR-2013-0208; FRL-9825-7] This action addresses the following CAA elements: 110(a)(2)(A), (B), (C), (D)(i)(II) prongs 3 and 4, (D)(ii), (E), (F), (G), (H), (J), (K), (L), and (M). |
(59) Section 110(a)(2) Infrastructure Requirements for the 2006 PM2.5 NAAQS | Statewide | 12/28/2009 | 6/21/2013; 78 FR 37457 | [EPA-R07-OAR-2013-0208; FRL-9825-7] This action addresses the following CAA elements: 110(a)(2)(A), (B), (C), (D)(i)(II) prongs 3 and 4, (D)(ii), (E), (F), (G), (H), (J), (K), (L), and (M) |
(60) Section 128 Declaration: Missouri Air Conservation Commission Representation and Conflicts of Interest Provisions; Missouri Revised Statutes (RSMo) RSMo 105.450, RSMo 105.452, RSMo 105.454, RSMo 105.462, RSMo 105.463, RSMo 105.466, RSMo 105.472, and RSMo 643.040.2 | Statewide | 8/8/2012 | 6/21/2013; 78 FR 37457 | [EPA-R07-OAR-2013-0208; FRL-9825-7]. |
(61) Section 110(a)(2) Infrastructure Requirements for the 2008 Pb NAAQS | Statewide | 12/20/2011 | 8/19/2014, 79 FR 48994 | [EPA-R07-OAR-2014-0290; FRL-9915-28-Region 7] This action addresses the following CAA elements: 110(a)(2)(A), (B), (C), (D), (E), (F), (G), (H), (J), (K), (L), and (M). |
(62) Implementation Plan for the 2008 Lead NAAQS | City of Herculaneum, MO | 4/18/2013 | 10/20/2014, 79 FR 62574 | [EPA-R07-OAR-2014-0448; FRL-9918-18-Region-7] |
(63) Sections 110(a)(1) and 110(a)(2) Infrastructure Requirements for the 2008 Ozone NAAQS | Statewide | 7/8/2013 | 3/22/2018, 83 FR 12496 | This action approves the following CAA elements: 110(a)(1) and 110(a)(2)(A), (B), (C), (D)(i)(II)-prong 3, (D)(ii), (E), (F), (G), (H), (J), (K), (L), and (M). 110(a)(2)(D)(i)(I)-prongs 1 and 2 are addressed by Federal Implementation Plans. 110(a)(2)(I) is not applicable. [EPA-R07-OAR-2015-0356; FRL-9975-71-Region 7]. |
(64) Sections 110(a)(1) and 110(a)(2) Infrastructure Requirements for the 2010 Nitrogen Dioxide NAAQS | Statewide | 4/30/2013 | 3/22/2018, 83 FR 12496 | This action approves the following CAA elements: 110(a)(1) and 110(a)(2)(A), (B), (C), (D)(i)(I), (D)(i)(II)-prong 3, (D)(ii), (E), (F), (G), (H), (J), (K), (L), and (M). 110(a)(2)(I) is not applicable. [EPA-R07-OAR-2017-0268; FRL-9975-71-Region 7]. |
(65) Sections 110(a)(1) and 110(a)(2) Infrastructure Requirements for the 2010 Sulfur Dioxide NAAQS | Statewide | 7/8/2013 | 3/22/2018, 83 FR 12496 | This action approves the following CAA elements: 110(a)(1) and 110(a)(2)(A), (B), (C), (D)(i)(II)-prong 3, (D)(ii), (E), (F), (G), (H), (J), (K), (L), and (M). EPA is not acting on 110(a)(2)(D)(i)(I)-prongs 1 and 2. 110(a)(2)(I) is not applicable. EPA intends to act on 110(a)(2)(D)(i)(II)-prong 4 in a separate action. [EPA-R07-OAR-2017-0515; FRL-9975-71-Region 7]. |
(66) Cross State Air Pollution Rule-State-Determined Allowance Allocations for the 2016 control periods | Statewide | 3/30/2015 | 8/24/2015, 80 FR 51135 | |
(67) Missouri 8-Hour CO Second Ten year Limited Maintenance Plan. | St. Louis | 4/8/2014 | 10/2/2015, 80 FR 59614 | EPA-R07-OAR-2015-0513; FRL-9934-98-Region 7] |
(68) Missouri Early Progress Plan | St. Louis | 8/26/2013 | 1/14/2016, 81 FR 1890 | [EPA-R07-OAR-2015-0587; FRL-9941-01-Region 7]. |
(69) Marginal Plan for the Missouri Portion of the St. Louis Ozone Nonattainment Area for the 2008 NAAQS | Statewide | 9/9/2014 | 2/25/2016, 81 FR 9350 | EPA-R07-OAR-2015-0438; 9942-76-Region 7. |
(70) State Implementation Plan (SIP) Revision for Regional Haze (2014 Five-year Progress Report) | Statewide | 9/5/2014 | 8/1/2016, 81 FR 50353; 9/24/2018, 83 FR 48242 | Missouri submitted a clarification letter to its Five-year Progress Report on July 31, 2017 that is part of this action. [EPA-R07-OAR-2015-0581; FRL-9949-68-Region 7]; [EPA-R07-OAR-2018-0211; FRL-9984-22-Region 7.] |
(71) Exide Technologies Compliance Plan 2008 lead NAAQS | Forest City | 10/15/2014 | 9/26/2016, 81 FR 65898 | [EPA-R07-OAR-2015-0835; FRL 9952-79-Region 7]. |
(72) Sections 110(a)(1) and 110(a)(2) Infrastructure Requirements for the 2012 Annual Fine Particulate Matter (PM2.5) NAAQS | Statewide | 10/14/2015 | 3/22/2018, 83 FR 12496 | This action approves the following CAA elements: 110(a)(1) and 110(a)(2)(A), (B), (C), (D)(i)(II)-prong 3, D(ii), (E), (F), (G), (H), (J), (K), (L), and (M). 110(a)(2)(I) is not applicable. [EPA-R07-OAR-2017-0513; FRL-9975-71-Region 7]. |
(73) Missouri State Statute section 105.483(5) RSMo 2014, and Missouri State Statute section 105.485 RSMo 2014 | Statewide | 10/14/2015 | 3/22/2018, 83 FR 12496 | EPA-R07-OAR-2017-0513; FRL-9975-71-Region 7. |
(74) Sections 110(a)(2) Infrastructure Prong 4 Requirements for the 2008 Ozone, 2010 Nitrogen Dioxide, 2010 Sulfur Dioxide, and the 2012 Fine Particulate Matter NAAQS | Statewide | 7/8/2013; 8/30/2013; 7/8/2013; 10/14/2015 | 9/24/2018, 83 FR 48242 | This action approves the following CAA elements: 110(a)(2)(D)(i)(II)-prong 4. [EPA-R07-OAR-2018-0211; FRL-9984-22-Region 7. |
(75) Section 110(a)(2)(D)(i)(I)-significant contribution to nonattainment (prong 1), and interfering with maintenance of the NAAQs (prong 2) (Interstate Transport) Infrastructure Requirements for the 2012 Annual Fine Particulate Matter (PM2.5) NAAQS | Statewide | 10/14/2015 | 10/1/2018, 83 FR 49298 | This action approves the following CAA elements: 110(a)(1) and 110(a)(2)(D)(i)(I)-prongs 1 and 2 [EPA-R07-OAR-2018-0261; FRL-9983-77-Region 7.]] |
(76) Jackson County 1-Hour SO2 NAA Baseline Emissions Inventory | Jackson County | 10/15/2015 | 2/13/2019, 84 FR 3703 | [EPA-R07-OAR-2018-0700; FRL-9988-46-Region 7]. |
(77) Jefferson County 1-Hour SO2 NAA Baseline Emissions Inventory | Jefferson County | 6/1/2015 | 2/13/2019, 84 FR 3703 | [EPA-R07-OAR-2018-0700; FRL-9988-46-Region 7]. |
(78) Sections 110 (a)(1) and 110(a)(2) Infrastructure Requirements for the 2015 Ozone NAAQS. Ozone Contingency Plan Exemptions | Statewide | 4/11/2019 | 9/30/2019, 84 FR 51413 | This action approves the following CAA elements: 110(a)(1) and 110(a)(2)(A), (B), (C), (D)(i)(II)-prongs 3 and 4, (D)(ii), (E), (F), (G), (H), (J), (K), (L), and (M). 110(a)(2)(D)(i)(I)-prongs 1 and 2 were not included in the submission. 110(a)(2)(I) is not applicable. This action approves the ozone contingency plan exemptions for all counties in the Kansas City AQCR and Jefferson and Franklin (except Bowles Township) counties in the St. Louis AQCR. [EPA-R07-OAR-2019-0334; FRL-1000-15-Region 7]. |
(79) Revisions to St. Louis 2008 8-Hour Ozone Maintenance Plan | St. Louis Area: Missouri counties of Franklin, Jefferson, St. Charles, and St. Louis along with the City of St. Louis | 11/12/2019 | 9/30/2021, 86 FR 54098 | EPA-R07-OAR-2015-0513; This action replaces Maintenance plans for the following ozone NAAQS: 1979 1-hour (published in the Federal Register on May 12, 2003), 1997 8-hour (published in the Federal Register on February 20, 2015), 2008 8-hour (published in the Federal Register on September 20, 2018). |
(80) Revisions to St. Louis 1997 PM2.5 Maintenance Plan | St. Louis Area: Missouri counties of Franklin, Jefferson, St. Charles, and St. Louis along with the City of St. Louis | 11/12/2019 | 9/30/2021, 86 FR 54106 | This action replaces the Maintenance plan for the 1997 PM2.5 (published in the Federal Register on October 2, 2018). |
(81) Jefferson County 1-hour SO2 NAAQS Maintenance Plan and Supplemental Modeling Analyses | Jefferson County | 12/27/2017; 5/15/2018; 2/7/2019; 2/25/2019; and 4/9/2021 | 1/28/2022, 87 FR 4508 | This action approves the Maintenance Plan and the Supplemental Modeling Analyses for the Jefferson County area. |
(82) Jackson County 1-hour SO2 NAAQS Maintenance Plan and Maintenance Plan Supplement | Jackson County | 2/18/2021; 9/7/2021 | 1/31/2022, 87 FR 4812 | This action approves the Maintenance Plan and the Maintenance Plan Supplement for the Jackson County area. |
(83) Glover Lead Plan for Continued Attainment of the 2008 Lead NAAQS | Iron County (part) within boundaries of Liberty and Arcadia Townships | 10/7/2020 | 4/27/2022, 87 FR 24870 | [EPA-R07-OAR-2021-0913; FRL-9351-02-R7]. |
(84) Implementation plan for the Missouri inspection maintenance program | St. Charles County, St. Louis County, and St. Louis City | 11/12/2019 3/2/2022 | 9/13/2022, 87 FR 55918 | [EPA-R07-OAR-2022-0419; FRL-9830-02-R7]. Approved for St. Charles County, St. Louis County, and St. Louis City and removal of Franklin County. No action on Jefferson County. Please see item (38) of this paragraph. |
(85) Marginal Plan for the St. Louis 2015 8-Hour Ozone Nonattainment Area | St. Louis Area: Missouri counties of Jefferson, St. Charles, and St. Louis along with the City of St. Louis and Boles Township in Franklin County | 9/8/2021, 4/8/2022 | 2/7/2023, 88 FR 7885 | This action approves the Marginal nonattainment area plan for the St. Louis Area for the 2015 8-hour Ozone NAAQS [EPA-R07-OAR-2022-0880; FRL-10388-02-R7]. |
40 C.F.R. §52.1320
For FEDERAL REGISTER citations affecting §52.1320, see the List of CFR Sections Affected, which appears in the Finding Aids section of the printed volume and at www.govinfo.gov.