34 C.F.R. § 75.605

Current through October 31, 2024
Section 75.605 - After the construction
(a) A grantee must ensure that sufficient funds will be available for effective operation and maintenance of the facilities after the construction is complete.
(b) A grantee must operate and maintain the facilities in accordance with applicable Federal, State, and local requirements.
(c) A grantee must maintain all financial records, supporting documents, statistical records, and other non-Federal entity records pertinent to the construction project consistent with 2 CFR 200.334 .

34 C.F.R. §75.605

Authority: 20 U.S.C. 1221e-3 and 3474

89 FR 70332 , 9/30/2024