A grantee may, notwithstanding any requirement in 2 CFR part 200 , incur pre-award costs as specified in 2 CFR 200.308(d)(1) unless-
34 C.F.R. §75.263
Authority: 20 U.S.C. 1221e-3 and 3474 ; 2 CFR 200.308(d)(1)
A grantee may, notwithstanding any requirement in 2 CFR part 200 , incur pre-award costs as specified in 2 CFR 200.308(d)(1) unless-
34 C.F.R. §75.263
Authority: 20 U.S.C. 1221e-3 and 3474 ; 2 CFR 200.308(d)(1)