Browse as ListSearch Within- Section 157.08 - Applicability of subpart B
- Section 157.09 - Segregated ballast
- Section 157.10 - Segregated ballast tanks and crude oil washing systems for certain new vessels
- Section 157.10a - Segregated ballast tanks, crude oil washing systems, and dedicated clean ballast tanks for certain new and existing vessels of 40,000 DWT or more
- Section 157.10b - Segregated ballast tanks, dedicated clean ballast tanks, and special ballast arrangements for tank vessels transporting Outer Continental Shelf oil
- Section 157.10c - Segregated ballast tanks, crude oil washing systems, and dedicated clean ballast tanks for certain new and existing tankships of 20,000 to 40,000 DWT
- Section 157.10d - Double hulls on tank vessels
- Section 157.11 - Pumping, piping and discharge arrangements
- Section 157.12 - Oil discharge monitoring and control system
- Section 157.12a - Definitions
- Section 157.12b - Implementation requirements
- Section 157.12c - Construction, maintenance, security, calibration, and training
- Section 157.12d - Technical specifications
- Section 157.12e - Certificate of approval
- Section 157.12f - Workshop functional test requirements
- Section 157.12g - Plan approval requirements
- Section 157.13 - Designated observation area
- Section 157.14 - Pump-room bottom protection
- Section 157.15 - Slop tanks in tank vessels
- Section 157.17 - Oil residue (sludge) tank
- Section 157.19 - Cargo tank arrangement and size
- Section 157.20 - Accidental oil outflow performance
- Section 157.21 - Subdivision and stability
- Section 157.22 - Intact stability requirements
- Section 157.23 - Cargo and ballast system information
- Section 157.24 - Submission of calculations, plans, and specifications
- Section 157.24a - Submission of calculations, plans, and specifications for existing vessels installing segregated ballast tanks