33 C.F.R. § 154.1017

Current through September 30, 2024
Section 154.1017 - Response plan submission requirements
(a) The owner or operator of an MTR facility identified only in § 154.1015(b) , or designated by the COTP as a substantial harm facility, shall prepare and submit to the cognizant COTP a response plan that meets the requirements of § 154.1030 , § 154.1040 , § 154.1045 , or § 154.1047 , as appropriate. This applies to:
(1) A mobile MTR facility used or intended to be used to transfer oil to or from a vessel with a capacity of 250 barrels or more; and
(2) A fixed MTR facility specifically designated as a substantial harm facility by the COTP under § 154.1016 .
(b) The owner or operator of an MTR facility identified in § 154.1015(c) or designated by the COTP as a significant and substantial harm facility shall prepare and submit for review and approval of the cognizant COTP a response plan that meets the requirements of § 154.1030 , § 154.1035 , § 154.1045 , or § 154.1047 , as appropriate. This applies to:
(1) A fixed MTR facility capable of transferring oil, in bulk, to or from a vessel with a capacity of 250 barrels or more; and
(2) An MTR facility specifically designated as a significant and substantial harm facility by the COTP under § 154.1016 .
(c) In addition to the requirements in paragraphs (a) and (b) of this section, the response plan for a mobile MTR facility must meet the requirements of § 154.1041 subpart F.

33 C.F.R. §154.1017