33 C.F.R. § 127.305

Current through September 30, 2024
Section 127.305 - Operations Manual

Each Operations Manual must contain-

(a) A description of the transfer system including mooring areas, transfer connections, control rooms, and diagrams of the piping and electrical systems;
(b) The duties of each person assigned for transfer operations;
(c) The maximum relief valve setting or maximum allowable working pressure of the transfer system;
(d) The facility telephone numbers of facility supervisors, persons in charge of shoreside transfer operations, personnel on watch in the marine transfer area for LNG, and security personnel;
(e) A description of the security systems for the marine transfer area for LNG;
(f) The procedures for-
(1) Transfer operations including gauging, cool down, pumping, venting, and shutdown;
(2) Transfer operations start-up and shutdown;
(3) Security violations; and
(4) The communications systems; and
(g) A description of the training programs established under § 127.503 .

33 C.F.R. §127.305

CGD 78-038, 53 FR 3376, Feb. 7, 1988, as amended by CGD 88-049, 60 FR 39796, Aug. 3, 1995