Current through September 30, 2024
Section 117.620 - Westport River-East BranchThe Westport Point Bridge, mile 1.2 at Westport, shall operate as follows:
(a) Public vessels of the United States must be passed as soon as possible.(b) The owners of this bridge shall provide and keep in good legible condition clearance gauges for each draw with figures not less than 12 inches high designed, installed, and maintained, according to the provisions of § 118.160 of this chapter.(c) That the drawspan for the Westport Point Drawbridge, mile 1.2 at Westport, must open on signal if at least 24 hours notice is given.CGD1-91-014, 56 FR 41462, Aug. 21, 1991, as amended by USCG-2001-10881, 71 FR 70311, Dec. 4, 2006