The draw of the S97 bridge, mile 7.0 near Jennings, shall open on signal if at least 48 hours notice is given.
33 C.F.R. §117.482
The draw of the S97 bridge, mile 7.0 near Jennings, shall open on signal if at least 48 hours notice is given.
33 C.F.R. §117.482